| TO DO |
|
|
|
|
|
|
|
squeak at top of stairs bedroom level |
|
|
|
| UPGRADES |
| --- |
|
| CRITICAL PATH |
| --- |
|
| TO DO - COMPLETED OR DELETED |
|
|
Foyer window? |
|
|
|
|
oak treads to second level... |
|
|
|
|
OPS - See questions on Lot 2 |
|
|
|
|
Playground - week of June 20 |
|
|
|
|
Stone starting Feb 20 |
in process 2/23 |
|
|
|
New shower insert in garage 2/27 |
|
|
|
|
Leak in plumbing-HVAC closet in basement |
|
|
|
|
Leak in plumbing-HVAC closet in basement |
|
|
|
|
|
|
|
|
|
Covered attic access w drywall? |
|
|
|
|
CODED LOCKBOX 1111 |
|
|
|
|
Privacy dividers |
5/9 |
|
|
|
Finish M closet shelving 4/27 |
|
|
|
|
sqeak at top of stairs bedroom level |
|
|
|
|
Room framing repair |
|
|
|
|
Attic cover needed 5/1 |
Tom |
|
|
|
Electric in unfurnished space needs trim out |
|
|
|
|
Hallway light in basement |
|
|
|
|
Tub liner |
|
|
|
|
Smoke detector |
|
|
|
|
Keyless light in bonus |
|
|
|
|
Paint touch up throughout |
In process. Needs painting over patched areas 5/15 |
|
|
|
Light in closet under the stairs |
|
|
|
|
Cover media box in garage |
Tom |
|
|
|
Plugs for front door window in French door |
|
|
|
|
Adhere escutcheon to back and pedestal sink |
Plumber |
|
|
|
Make sure all snap flights are fixed tight to the ceiling. A couple in the living room seem loose |
Electrician |
|
|
|
Install screens in all windows |
Jill |
|
|
|
Remove staples from bottom of closet door in bedroom number two |
|
|
|
|
Attic access cover master closet |
|
|
|
|
Caulk in shower walls |
Painter |
|
|
|
Drywall patch near stairs needed 5/11 |
|
|
|
|
Final grade |
|
|
|
|
Paint foundation |
Thursday, June 16 |
|
|
|
Trim around exterior of window on side of townhouse |
Greg Sigmon-5/23 |
|
|
|
Buyer is complaining about master bathroom bulbs - wants them to be clear |
|
|
|
|
Garage trim? |
|
|
|
|
Paint front doors 1-5 (after driveways)? |
|
|
|
|
Stain stairs |
One more coat of poly |
|
|
|
|
|
|
|
|
Clean out bonus room |
Monday 6/6 |
|
|
|
Certificate of Occupancy??? |
|
|
|
|
shower pan being replaced -delivered 5/23 |
|
|
|
|
uninstall shower door |
hopefully 5/23 |
|
|
|
patio step |
|
|
|
|
Playground - September |
Eric has it scheduled for September 12 |
|
|
|
Side siding missing still |
|
|
|
|
Bath doorknob backwards |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wall repair by fire pit |
Rock guys need to install |
|
|
|
Kit ceiling repairs |
Painting |
|
|
|
Pressure wash mud off stone? |
Another coat of paint? |
|
|
|
Paint garage 6/1 |
|
|
|
|
Shower walls |
|
|
|
|
Touch up spot on stairs 6/5 |
|
|
|
|
Shower trim repair |
|
|
|
|
Install shower door |
Tues, 6/7 |
|
|
|
Shower handle |
|
|
|
|
Caulk shower pan to sidewalls |
|
|
|
|
Caulk/trim from LVT to shower pan |
|
|
|
|
Touch up paint wall on stairs |
|
|
|
|
touch up paint right side of master shower wall where it meets the drywall |
|
|
|
|
install missing piece of quarter round at base of master shower |
|
|
|
|
caulk holes at base of shower walls where they meet the pan until they are supposed to stay open? |
|
|
|
|
Caulk in front of master shower where it meets the floor |
|
|
|
|
touch up paint on master bedroom wall next to coax |
|
|
|
|
sand outside edge of master bedroom door where it is rough, paint as needed |
|
|
|
|
touch up paint at master bedroom light switch |
|
|
|
|
dirt spot just inside doorway of the smallest bedroom |
|
|
|
|
clean hvac return cover at top of top stairs that is covered with dust |
|
|
|
|
touch up paint near light switch to pantry where there are smudges on the wall |
|
|
|
|
possible remove things from the kitchen drain as the garbage disposal seems to make a racket |
|
|
|
|
power wash back patio |
|
|
|
|
clean off scuff marks on white trim at window in foyer |
|
|
|
|
clean paint off of hinges of door between garage and hallway |
|
|
|
|
remove super large drill bit sitting in unfinished bonus room |
|
|
|
|
power wash front step and threshold to front door |
|
|
|
|
remove cigarette butts outside front door |
|
|
|
|
trim silver metal flashing tape that extends beyond white trim around window on side of basement bonus room yes that is recommended |
|
|
|
|
Timeline for paving? |
|
|
|
|
replace dead bush by front entrance sign |
Tom will tell Pettit |
|
|
|
Reinstall site sign |
|
|
|
|
Trash solution for 70 year old residents |
|
|
|
|
Playground - mid October |
Week of October 31 |
|
|
|
repair sidewalk once drainage system is in place |
|
|
|
|
sod small area on side of 133 |
|
|
|
|
finish fence behind 1-5 |
|
|
|
|
grass cutting started? |
|
|
|
|
CONGERS sign at entrance to Section 2 |
Needs Stonework |
|
|
|
Playground area marked off Thursday, Oct 20 |
by surveyor |
|
|
|
Fence along sidewalk |
Needs stain, Painter |
|
|
|
Lightpoles |
|
|
|
|
Straighten weathervane on top of pavilion |
|
|
|
|
Replace letters/backing on main sign in section 1 |
|
|
|
|
Light posts |
paint black |
|
|
|
New Inspection Stickers? |
|
|
|
|
Light bulb cost calculations |
|
|
|
|
Paint all light posts black |
|
|
|
|
Paint light poles black |
Jill |
|
|
|
Broken "K" on front sign |
|
|
|
|
Dead plant at entrance (8/2) |
Plants have been pulled but need replaced 10/25 |
|
|
|
Dog Park? |
Maybe where construction trailer is located? |
|
|
|
School bus will not come down to Palomino until VDOT signs off on the road |
Where is bus intended to turn around? |
|
|
|
Few light poles needed |
|
|
|
|
Light Post Electric Meter - Lot 133 |
9/6 - Bernard will call Craig |
|
|
|
Light Post Electric Meter - Lot 6 |
9/8: Kristo prefers that it be on a stone pillar; |
|
|
|
Early Owners To Sign On To Restrictive Covenants |
Kate - three remaining |
|
|
|
1440 flooring needed |
Master bath previous flooring |
|
|
|
Stone falling off of townhouses |
Game plan? - 1310 Caspian |
|
|
|
Sidewalk stairs to Boyers Road? |
Aligned with center of Belgian Drive? |
|
|
|
Fence along Josiah Weaver property line? |
|
|
|
|
Very tilted light pole across from 104 |
Tom |
|
|
|
Stone falling off 1310 Caspian Way |
Grizzly Stone |
|
|
|
Lamp Posts |
Temporarily On? Meters? |
|
|
|
Fencing around the playground? |
|
|
|
|
Dumpster across from Lot 35 |
Can it be moved? |
|
|
|
Paint bottom of light poles black |
Painter |
|
|
|
Parking issue - add no parking signs? |
Scott will ask Kayleigh to add signs |
|
|
|
Sidewalk between Appaloosa & Palomino? |
Will site conditions allow it? |
|
|
|
Level out gravel parking area by detention pond |
Tom |
|
|
|
Too many unrelated people at 2814 Belgian Drive |
Scott asked Kayleigh to follow up on 1/26/2024 |
|
|
|
Lots of dead trees at edge of phase 1 |
Pettit |
|
|
|
Remove gravel road leading to pond? |
|
|
|
|
Grasses, trees around pond? |
Petitt waited on release |
|
|
|
Paint light posts |
Jill |
|
|
|
Damaged mailbox group on Belgian Drive |
Tom |
|
|
|
Plant trees on sides of gravel driveway |
Does 2 trees count as completed? |
|
|
|
Dog Park dimensions 25x24 |
|
|
|
|
Siding concern on existing townhomes |
Damage from lawn maintenance crew |
|
|
|
VA Builder forms |
|
|
|
|
Stain mailbox posts throughout neighborhood |
Painter-in process |
|
|
|
Storm drain located near second retention pond needs a lid |
|
|
|
|
Can we remove the porta potty from the front of 48? |
|
|
|
|
Model Home Repairs |
Garage door handles/light bulbs - Davenport |
|
|
|
Cracked Sidewalk |
Phase 1. Maybe 10/22 |
|
|
|
Small Greenspace Ideas |
Kate will look for a freestanding swing |
|
|
|
Model home - touch up paint |
|
|
|
|
Model home - master bedroom, bathroom light |
Electrician |
|
|
|
Street lights along sidewalk between Phase 1 and 2? |
If HOA wants to pay |
|
|
|
Model home - garage door handles |
Davenport (2858 Belgian Drive) |
|
|
|
Paint light poles black |
few left to paint 8/3 |
|
|
|
Repair yard at lot 1 |
|
|
|
|
install mailbox |
|
|
|
|
Street Lights in Phase 3 |
Where will they be? |
|
|
|
repair rock on light pole beside playground |
Dale |
|
|
|
repair lot 1 yard and fence |
|
|
|
|
1. Cracks throughout the community on the sidewalks, curbs, and visitor parking area. |
Cracks in concrete are normal |
|
|
|
2. Quite a few dead bushes and trees. All three trees in front of the retention pond appear to be dead. |
Pettit - next to Lot 26 in Phase 1 |
|
|
|
3. Can we add a pet waste station in front of the retention pond area. |
yes, HOA can pay for it, builder will install it |
|
|
|
4. Can we get the retention pond cleaned up. There is trash and stale water sitting. |
Jerry will ask Ted about this |
|
|
|
5. In the spring can we have power washing done to clean much of the concrete sidewalks and curbs. |
HOA decision, not advisable |
|
|
|
6. Add a stop sign at the end of Palomino right at unit 1467. |
We need more clarification |
|
|
|
7. Add a light pole across the street from the stop sign as it’s dark in that area. Prefer closer to the deck of 1467. |
Will be working on street light plan |
|
|
|
8. Add visitor parking in the new area where they are building. |
The site plan is already determined |
|
|
|
9. There are wires around electric boxes at side of 1316 and 1398. |
From temporary meters, can be removed. I think removed 1/29 |
|
|
|
10. Grass really needs to be added around the playground area again and watered in very early spring. |
Will talk about it in the spring |
|
|
|
11. Stone is falling off the column at the playground. |
Some were repaired 3/28. Just one large one on back/bottom |
|
|
|
Can we do something about the small curbs at the street that had grass planted along Palomino and now it’s mud. Owners/tenants are just driving over it, and they look bad. Could we add rock or tell owners they need to do something with it. |
We can add stone |
|
|
|
Gazebo or similar for small greenspace area (after dog park) |
Tom |
|
|
|
Dog Park! |
Tom |
|
|
|
Stop Signs |
Tom |
|
|
|
Cap over pipe by back corner retention pond |
Tom, Scott |
|
|
|
Concrete not level on sidewalk near playground-patch needed? |
Tom |
|
|
|
Broken Mailbox near unit 60 |
|
|
|
|
Clean out trash in pond |
|
|
|
|
crackes in concrete throughout |
|
|
|
|
water issue near playground |
|
|
|
|
2 Broken Fence Posts |
Stain - Tom |
|
|
|
4 Trees Needed |
Pettit |
|
|
|
Concrete repairs |
Buddy - ongoing |
|
|
|
Gazebo and dog park |
Tom to send sketch to Jerry, Jerry to ask about permit |
|
|
|
Picnic table repair |
Stain - John |
|
|
|
Street lights by basketball court |
Tom - will order |
|
|
|
Stop sign at Belgian and Congers Creek Road |
|
|
|
|
Grass around playground |
Jill |
|
|
|
Grass near basketball court |
Jill |
|
|
|
Grass near new french drains |
Jill - one more spot on top of pipe |
|
|
|
Clean storm drains |
Tom |
|
|
|
Stop sign at Belgian and Caspian |
Tom |
|
|
|
#57 washed river stone at Phase 1 driveway entrances |
Pettit |
|
|
|
Retention pond pump |
Scott Stoehr |
|
|
|
Stone falling off 2914 Belgian Drive |
Tom |
|
|
|
Patch where grass is missing at french drain. |
Jill - one more spot on top of pipe |
|
|
|
siding falling off end of phase 2 townhouses (near 61) |
Jill showed Jeremy, Davenport (1362, 1344) |
|
|
|
Stain fence |
John |
|
|
|
Fix large tire rut in front yard of 38 |
|
|
|
|
Remove large Congers sign |
|
|
|
|
Install street lights 27 and 37 |
|
|
|
|
Remove/hide pipes near 27 in yard |
|
|
|
|
Gazebo and dog park |
|
|
|
|
Street lights |
10 - on order? |
|
|
|
Clean up wires in yard of 27 |
|
|
|
|
Install street lights at 37 |
Timeline? |
|
|
|
Pond aerator |
Is it located in the correct spot? |
|
|
|
Landscaping needed near new pavilion |
|
|
|
|
Repair concrete step by playground |
Tom to patch |
|
|
|
Asphalt patch near 1309 Palomino |
|
|
|
|
Grass seed - Lot 73 |
|
|
|
|
1553 Palomino Trail (Lot 87) - stone by front door |
|
|
|
|
Street lights at playground? |
Or dog park? |
|
|
|
Street Signs |
Appaloosa Ct (2), Derby Dr (2) |
|
|
| UPGRADES - COMPLETED |
| |
|
Expanded Driveway
|
|
| |
|
Egress Window in bonus room
|
|
| |
|
Expanded Patio 10x18
|
|
| |
|
Painted Kitchen Cabinetry
|
|
| |
|
Painted Bath Cabinetry
|
|
| |
|
Cabinet Crown Moulding
|
|
| |
|
Main Level Crown Moulding
|
|
| |
|
Farmhouse Kitchen Sink
|
|
| |
|
Oak Treads to Bedroom Level
|
|
| |
|
Shower Panel Walls
|
|
| |
|
Shower Door heavy glass- bypass door
|
|
| |
|
Garage Keypad Entry
|
|
| |
|
Farmhouse Plumbing Package
|
|
| |
|
25% Discount
|
|
| |
|
Amendment to increase price by $10,875
|
|
|
| CRITICAL PATH - COMPLETED |
| -- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
| -- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
| -- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
| -- |
-- |
Association Packet Received (0) 02.09.2026 |
|
|
| -- |
-- |
Selections Meeting (0) 11.22.2021 |
|
|
| -- |
-- |
Selections Sheet Signed (0) 11.22.2021 |
|
|
| -- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 11.30.2021 |
Sent to Jerry for signatures 11/23/2021 |
|
| -- |
-- |
Deposit For Upgrades Received (0) 11.30.2021 |
|
|
| -- |
-- |
Building Permit (30) * 11.11.2021 |
|
|
| -- |
-- |
Order Roof & Floor Trusses (1) 11.11.2021 |
|
|
| -- |
-- |
Order Windows & Doors (0) 11.11.2021 |
|
|
| -- |
-- |
Stake Out Home (1) 11.11.2021 |
|
|
| -- |
-- |
Excavate (2) 11.11.2021 |
|
|
| -- |
-- |
Inspection (Footers) (1) 11.11.2021 |
|
|
| -- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
| -- |
-- |
Pour Footers (1) * 11.11.2021 |
|
|
| -- |
-- |
Set Forms (2) 11.22.2021 |
|
|
| -- |
-- |
Pour Foundation Walls (1) 11.29.2021 |
|
|
| -- |
-- |
Plumb Slab (2) 12.02.2021 |
|
|
| -- |
-- |
Inspection (Plumbing Under Slab) (1) 12.06.2021 |
|
|
| -- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
| -- |
-- |
Prepare Slab (1) 12.06.2021 |
|
|
| -- |
-- |
Inspection (Slab) (1) 12.06.2021 |
|
|
| -- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
| -- |
-- |
Pour Slab (1) * 12.06.2021 |
|
|
| -- |
-- |
Settlement Agent Confirmed (0) 11.24.2021 |
|
|
| -- |
-- |
Framing I (9) 12.20.2021 |
Starting Mon, 12/13 |
|
| -- |
-- |
Order Steps (0) 12.20.2021 |
|
|
| -- |
-- |
Order Tubs / Showers (0) 12.09.2021 |
|
|
| -- |
-- |
Framing II (8) 12.27.2021 |
|
|
| -- |
-- |
Framing III (8) * 01.24.2022 |
|
|
| -- |
-- |
Verify Window & Roof Structure (0) 12.11.2023 |
|
|
| -- |
-- |
Install Stairs (0) * 01.20.2022 |
|
|
| -- |
-- |
Windows & Doors (0) * 01.27.2022 |
in process 1/23 |
|
| -- |
-- |
House Number and Status in Window (0) 06.30.2025 |
|
|
| -- |
-- |
Roofing (0) * 02.14.2022 |
|
|
| -- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
| -- |
-- |
Order Appliances (0) 04.23.2022 |
Standard |
|
| -- |
-- |
Deck (0) 04.23.2022 |
n/a |
|
| -- |
-- |
Gutters (0) 05.05.2022 |
|
|
| -- |
-- |
Driveway (0) * 05.31.2022 |
Expanded Driveway, 10x18 Expanded Patio. Patio framed 4/9 |
|
| -- |
-- |
Patio (0) 10.18.2022 |
|
|
| -- |
-- |
Privacy Divider / Fence (0) * 05.16.2022 |
|
|
| -- |
-- |
Sod / Seed / Landscaping (0) 06.07.2022 |
|
|
| -- |
-- |
HVAC Rough In (4) 01.31.2022 |
in process 1/26 |
|
| -- |
-- |
Rough In Microwave Vent (0) 12.11.2023 |
|
|
| -- |
-- |
Plumbing Rough In (4) 02.24.2022 |
Set Shower panel Walls in process 2/16 |
|
| -- |
-- |
Electric Rough In (4) 02.21.2022 |
in process 2/16 |
|
| -- |
-- |
Inspection (Rough In HVAC) (1) 03.02.2022 |
Mon, 2/28/2022 |
|
| -- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
| -- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
| -- |
-- |
Inspection (Framing) (1) * 09.07.2022 |
|
|
| -- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
| -- |
-- |
Exterior Vinyl (0) * 04.27.2022 |
In process 4/10 |
|
| -- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
| -- |
-- |
Insulation (2) * 03.06.2022 |
Mon, 2/28 |
|
| -- |
-- |
Inspection (Insulation) (1) 03.06.2022 |
|
|
| -- |
-- |
Inspection (Electric Service) (0) 05.12.2022 |
Inspected 4/25 |
|
| -- |
-- |
Set Electric Meter (0) * 04.06.2023 |
|
|
| -- |
-- |
Inspection (Main Sewer Line) (0) 01.31.2022 |
|
|
| -- |
-- |
Inspection (Main Water Line) (0) 09.07.2022 |
|
|
| -- |
-- |
Order Interior Doors & Trim (0) 03.10.2022 |
|
|
| -- |
-- |
Drywall (Hang) (4) * 11.24.2024 |
In process 3/7 |
|
| -- |
-- |
Loan Approval (0) 04.23.2022 |
|
|
| -- |
-- |
Deed Preparation (0) 04.13.2022 |
|
|
| -- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 03.17.2022 |
In process 3/12. Needs final sanding. |
|
| -- |
-- |
Paint 1 (1) 03.19.2022 |
|
|
| -- |
-- |
Garage Door (0) 05.26.2022 |
being installed 5/23 |
|
| -- |
-- |
House Numbers (0) 05.07.2022 |
|
|
| -- |
-- |
Mailbox (0) 05.31.2022 |
built in trailer-Tom will put up 5/23 |
|
| -- |
-- |
Cabinet Installation (2) * 03.23.2022 |
Deliver 3/18 Install 3/21 on site 3/19 |
|
| -- |
-- |
Granite Installation (1) * 04.10.2022 |
Thursday, 4/7- KK |
|
| -- |
-- |
Interior Trim - Install (3) * 03.27.2022 |
in process 3/23 |
|
| -- |
-- |
Order Plumbing / Lighting Fixtures (0) 07.25.2023 |
|
|
| -- |
-- |
Interior Trim - Paint (1) 10.26.2022 |
|
|
| -- |
-- |
Luxury Vinyl Plank (3) * 04.13.2022 |
Wed, 4/6 |
|
| -- |
-- |
Luxury Vinyl Tile (0) 04.13.2022 |
On site 4/9 |
|
| -- |
-- |
Paint 2 (3) 04.10.2022 |
|
|
| -- |
-- |
Cover Floors (0) 05.05.2022 |
|
|
| -- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.25.2022 |
Wed, 4/6 |
|
| -- |
-- |
Shoe Moulding (0) 04.18.2022 |
|
|
| -- |
-- |
Shelving, Door Knobs, Fire Extinguisher (1) * 04.28.2022 |
In process 4/18 |
|
| -- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.28.2022 |
|
|
| -- |
-- |
Pay Water / Sewer Taps (0) 03.31.2022 |
|
|
| -- |
-- |
Set Water Meter (1) * 05.12.2022 |
|
|
| -- |
-- |
Electric Trim Out (3) * 05.01.2022 |
Black Lighting. Starting Friday April 29 |
|
| -- |
-- |
Ceiling Fans (0) 05.01.2022 |
Test |
|
| -- |
-- |
HVAC Trim Out (1) * 05.01.2022 |
In process. Heat Pump needs hooked up & thermostat set 4/24 |
|
| -- |
-- |
Blower Door Test (1) 10.27.2023 |
|
|
| -- |
-- |
Plumbing Trim Out (2) * 04.18.2022 |
Black Farmhouse-in process 4/13 |
|
| -- |
-- |
Install Appliances (0) * 05.11.2022 |
All but stove-needs plug |
|
| -- |
-- |
Paint 3 (2) * 04.18.2022 |
|
|
| -- |
-- |
Carpet (2) 05.05.2022 |
After electric trim out |
|
| -- |
-- |
Appraiser Confirms Construction Completion (0) 06.07.2022 |
|
|
| -- |
-- |
Inspection (Final HVAC) (0) 09.07.2022 |
|
|
| -- |
-- |
Inspection (Final Plumbing) (0) 09.07.2022 |
|
|
| -- |
-- |
Inspection (Final Electric) (0) 09.07.2022 |
|
|
| -- |
-- |
Inspection (Final Building) (4) * 05.28.2022 |
need shower pan & patio step |
|
| -- |
-- |
Pre Walk Through (0) 05.23.2022 |
|
|
| -- |
-- |
Stain Hardwood Stairs (1) * 05.26.2022 |
in process 5/21 |
|
| -- |
-- |
Cleaning (1) 06.08.2022 |
almost complete 6/5 |
|
| -- |
-- |
Certificate of Occupancy (1) * 06.01.2022 |
mid-end of next week-maybe earlier |
|
| -- |
-- |
C.O. to Lender (0) 06.01.2022 |
|
|
| -- |
-- |
Schedule Closing (0) 06.02.2022 |
|
|
| -- |
-- |
Buyer Walk Through (1) * 06.08.2022 |
|
|
| -- |
-- |
Payment for Upgrades (0) 03.24.2022 |
|
|
| -- |
-- |
Keys to Settlement Agent (0) 06.07.2022 |
|
|
| -- |
-- |
Review Settlement Statement (0) 06.07.2022 |
|
|
| -- |
-- |
Jerry Signs Closing Documents (0) 06.07.2022 |
Mon, June 6 at 11:00 AM |
|
| -- |
-- |
Request Trash Tote From POA Manager (0) 06.11.2022 |
|
|
| -- |
-- |
Closing (1) 06.08.2022 |
Sara at West View Title (Tue, Jun 7 at 9AM) |
|
| -- |
-- |
Remove Coded Lockbox (0) 06.16.2022 |
|
|