| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Expanded Driveway | ||||
| Egress Window in bonus room | ||||
| Expanded Patio 10x18 | ||||
| Painted Kitchen Cabinetry | ||||
| Painted Bath Cabinetry | ||||
| Cabinet Crown Moulding | ||||
| Main Level Crown Moulding | ||||
| Farmhouse Kitchen Sink | ||||
| Oak Treads to Bedroom Level | ||||
| Shower Panel Walls | ||||
| Shower Door heavy glass- bypass door | ||||
| Garage Keypad Entry | ||||
| Farmhouse Plumbing Package | ||||
| 25% Discount | ||||
| Amendment to increase price by $10,875 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 11.11.2021 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.06.2021 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 12.06.2021 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.07.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.02.2022 | Mon, 2/28/2022 | |
| -- | -- | Inspection (Rough In Plumbing) (1) 09.07.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.07.2022 | ||
| -- | -- | Inspection (Framing) (1) * 09.07.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.07.2022 | ||
| -- | -- | Inspection (Insulation) (1) 03.06.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 05.12.2022 | Inspected 4/25 | |
| -- | -- | Inspection (Main Sewer Line) (0) 01.31.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 05.28.2022 | need shower pan & patio step | |