Fri |
Sep 20 |
Verify Window & Roof Structure (0)
|
|
|
Fri |
Sep 20 |
Rough In Microwave Vent (0)
|
|
|
Fri |
Sep 20 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 20 |
Blower Door Test (1)
|
|
|
|
-- |
-- |
Needs tub liners |
|
|
-- |
-- |
Paint on cabinets-Jill? |
|
|
-- |
-- |
Basement toilet issue? 4/27 |
|
|
-- |
-- |
Drywall repair in basement shower ceiling 4/27 |
Drywaller |
|
-- |
-- |
Crack in Foundation-Tom will seal |
|
|
-- |
-- |
Corners for cabinets needed? |
In box in dining room, waiting on cabinet installer. Installer on site 6/1 |
|
-- |
-- |
Drywall repair basement bath when ceiling is repaired. |
|
|
-- |
-- |
Weatherstripping on front window broken 5/15 |
Tom will swap out the sash |
|
-- |
-- |
Repair needed to front porch 5/25 |
Jeremy, Davenport |
|
-- |
-- |
CODED LOCKBOX 0131 |
|
|
-- |
-- |
Door weatherstripping needs Jill :) |
|
|
-- |
-- |
Very crooked basement toilet 6/1 |
Plumber |
|
-- |
-- |
Drywall hole basement bath |
In process 6/12 |
|
-- |
-- |
Bathroom shelving needs installed 6/12 |
And closet after carpet |
|
-- |
-- |
Basement closet drywall patch |
Painter |
|
-- |
-- |
Drywall LR ceiling blemish |
Painter |
|
-- |
-- |
No electric to kitchen island |
|
|
-- |
-- |
Outdoor outlet needed |
|
|
-- |
-- |
Outdoor outlet needed |
|
|
-- |
-- |
Needs almost all electrical trim out on main level |
All snap lights needed everywhere |
|
-- |
-- |
Closet shelving in 2 smaller bedrooms needs fixing |
|
|
-- |
-- |
Receptacle near base vanity needs completed |
And light switch |
|
-- |
-- |
Finish electric trim out basement bath |
|
|
-- |
-- |
Outlet cover basement bath |
Outlet cover by wall as well |
|
-- |
-- |
Drywall repair/access panel needed in basement |
|
|
-- |
-- |
Closet shelving in master. Carpet is down now. |
Joe |
|
-- |
-- |
Weatherstripping needed on front door |
Jill |
|
-- |
-- |
Light bulb powder bath |
Jill |
|
-- |
-- |
Loose rock |
Tom will tell rock guys |
|
-- |
-- |
Larger water line access panel |
Tom. Looks good - can we paint it? |
|
-- |
-- |
Paint tops and bottoms of doors |
|
|
-- |
-- |
Replace deck board with purple stain? |
|
|
-- |
-- |
Few bulbs |
|
|
-- |
-- |
Pendant lights- switch out bulb so both lights match- daylight |
Jill |
|
-- |
-- |
Plug holes in front and French door |
Jill |
|
-- |
-- |
Touch up on cabinet ends of island |
Jill |
|
-- |
-- |
Wipe down kitchen cabinet |
Cleaner |
|
-- |
-- |
Final paint touch up |
To be completed Saturday 7/2 |
|
-- |
-- |
Leave gallon of ceiling adn wall paint |
Painter |
|
-- |
-- |
Repair hole in master shower |
Shower repair person - week of July 11 |
|
-- |
-- |
Clean off overspray on banister |
Painter??? Maybe completed 7/6? |
|
-- |
-- |
Loose bathroom accessories to be toghtened |
Joe |
|
-- |
-- |
Install missing light bulbs |
Jill. Base bath 7/6 |
|
-- |
-- |
Install base patio screen |
Jill |
|
-- |
-- |
Cover for snap light in downstairs stairwell |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Insulation on doorbell (indoors) |
Jill |
|
-- |
-- |
Fan doesn’t work in powder bath 7/13 |
Jill & Tom |
|
-- |
-- |
|
|
|
-- |
-- |
Ratified Contract? (0)
11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0)
11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0)
11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0)
11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0)
12.07.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0)
12.09.2021 |
12/7/2021: sent to Katherine for buyer signature |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
01.05.2022 |
1/4/2022: waiting on signature from Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0)
01.04.2022 |
12/14/2021: waiting on upgrade deposit from buyer |
|
-- |
-- |
Building Permit (30)
11.11.2021 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
11.11.2021 |
|
|
-- |
-- |
Order Windows & Doors (0)
11.11.2021 |
|
|
-- |
-- |
Stake Out Home (1)
11.08.2021 |
|
|
-- |
-- |
Excavate (2)
11.29.2021 |
|
|
-- |
-- |
Inspection (Footers) (1)
11.29.2021 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
02.14.2023 |
|
|
-- |
-- |
Pour Footers (1)
11.29.2021 |
|
|
-- |
-- |
Set Forms (2)
12.06.2021 |
|
|
-- |
-- |
Pour Foundation Walls (1)
12.09.2021 |
|
|
-- |
-- |
Plumb Slab (2)
12.13.2021 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
12.20.2021 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
02.14.2023 |
|
|
-- |
-- |
Prepare Slab (1)
12.20.2021 |
|
|
-- |
-- |
Inspection (Slab) (1)
12.20.2021 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
02.14.2023 |
|
|
-- |
-- |
Pour Slab (1)
12.20.2021 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
03.30.2022 |
|
|
-- |
-- |
Framing I (9)
01.03.2022 |
|
|
-- |
-- |
Order Steps (0)
12.20.2021 |
|
|
-- |
-- |
Order Tubs / Showers (0)
12.09.2021 |
|
|
-- |
-- |
Framing II (8)
01.17.2022 |
|
|
-- |
-- |
Framing III (8)
02.03.2022 |
|
|
-- |
-- |
Install Stairs (0)
02.24.2022 |
|
|
-- |
-- |
Windows & Doors (0)
04.10.2022 |
|
|
-- |
-- |
House Number and Status in Window (0)
02.28.2022 |
|
|
-- |
-- |
Roofing (0)
02.17.2022 |
|
|
-- |
-- |
Order Cabinets (0)
01.31.2022 |
|
|
-- |
-- |
Order Appliances (0)
02.24.2022 |
Standard |
|
-- |
-- |
Deck (0)
04.24.2022 |
Expanded Deck 12 x 18- in process 2/16 |
|
-- |
-- |
Gutters (0)
05.02.2022 |
|
|
-- |
-- |
Driveway (0)
06.18.2022 |
STANDARD - Fri, June 17 |
|
-- |
-- |
Patio (0)
02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
04.25.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
06.29.2022 |
|
|
-- |
-- |
HVAC Rough In (4)
02.24.2022 |
in process 2/13 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
03.28.2022 |
3/25 |
|
-- |
-- |
Plumbing Rough In (4)
03.17.2022 |
In process 3/12 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
02.14.2023 |
|
|
-- |
-- |
Electric Rough In (4)
03.24.2022 |
In process 3/23 |
|
-- |
-- |
Inspection (Rough In Electric) (1)
02.14.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
02.14.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
02.14.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
04.18.2022 |
|
|
-- |
-- |
Exterior Stone (0)
04.14.2022 |
|
|
-- |
-- |
Insulation (2)
03.30.2022 |
??? |
|
-- |
-- |
Inspection (Insulation) (1)
03.31.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
06.02.2022 |
|
|
-- |
-- |
Set Electric Meter (0)
04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
04.14.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
02.14.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
03.10.2022 |
|
|
-- |
-- |
Drywall (Hang) (4)
04.10.2022 |
|
|
-- |
-- |
Loan Approval (0)
06.13.2022 |
|
|
-- |
-- |
Deed Preparation (0)
04.13.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
04.18.2022 |
In process 4/13 |
|
-- |
-- |
Paint 1 (1)
04.20.2022 |
|
|
-- |
-- |
Garage Door (0)
04.04.2022 |
|
|
-- |
-- |
House Numbers (0)
06.29.2022 |
|
|
-- |
-- |
Mailbox (0)
07.03.2022 |
|
|
-- |
-- |
Cabinet Installation (2)
04.18.2022 |
4/14-delivered 4/13 |
|
-- |
-- |
Granite Installation (1)
05.07.2022 |
5/6 |
|
-- |
-- |
Interior Trim - Install (3)
05.07.2022 |
Needs painting 5/4 |
|
-- |
-- |
Interior Trim - Paint (1)
02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
05.21.2022 |
|
|
-- |
-- |
Luxury Vinyl Tile (0)
05.21.2022 |
|
|
-- |
-- |
Paint 2 (3)
05.21.2022 |
|
|
-- |
-- |
Cover Floors (1)
06.30.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
06.01.2022 |
Plumbing on site 5/21 |
|
-- |
-- |
Shoe Moulding (0)
06.01.2022 |
On site 5/25 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
06.12.2022 |
Black accessories, Bonus bath. In process-90% complete 5/30 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
05.25.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
05.19.2022 |
|
|
-- |
-- |
Set Water Meter (0)
06.09.2022 |
|
|
-- |
-- |
Electric Trim Out (3)
06.25.2022 |
Quite a bit still needs completed 6/15 |
|
-- |
-- |
Ceiling Fans (0)
05.16.2022 |
|
|
-- |
-- |
HVAC Trim Out (1)
06.25.2022 |
Furnace set 6/1 |
|
-- |
-- |
Plumbing Trim Out (2)
05.25.2022 |
Black Standard |
|
-- |
-- |
Install Appliances (0)
06.08.2022 |
On site 5/30 |
|
-- |
-- |
Paint 3 (2)
06.01.2022 |
|
|
-- |
-- |
Carpet (2)
06.30.2022 |
In process 6/25 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
07.05.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
02.14.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
02.14.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
02.14.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
06.30.2022 |
Wed, June 29 |
|
-- |
-- |
Pre Walk Through (0)
06.27.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
06.16.2022 |
|
|
-- |
-- |
Cleaning (1)
07.03.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1)
06.30.2022 |
|
|
-- |
-- |
C.O. to Lender (0)
06.30.2022 |
|
|
-- |
-- |
Schedule Closing (0)
07.13.2022 |
|
|
-- |
-- |
Buyer Walk Through (1)
07.05.2022 |
|
|
-- |
-- |
Payment for Upgrades (0)
06.30.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
06.28.2022 |
|
|
-- |
-- |
Review Settlement Statement (0)
07.13.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
06.30.2022 |
Wednesday, June 29, 1:00 PM |
|
-- |
-- |
Request Trash Tote From POA Manager (0)
06.28.2022 |
|
|
-- |
-- |
Closing (1)
07.18.2022 |
Brittany @ West View Title (July 14) |
|
-- |
-- |
Remove Coded Lockbox (0)
07.27.2022 |
|
|