CONGERS-2 - 132  ::  1309 Palomino Trail
[ BUILD: 20210001835 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Thu    Nov 28      Verify Window & Roof Structure (0)      
Thu    Nov 28      Rough In Microwave Vent (0)      
Thu    Nov 28      Blower Door Test (1)      
--   --   Basement bath plumbing Plumber said fine. No repairs needed.
--   --   Door framing issue? 4/20 Drywall repair above doorway. Just needs painting 6/1
--   --   Bathroom drywall repair 5/11 Needs painting 6/15
--   --   Basement triple window frame issue in molding? 5/15 Trim guy
--   --   Nail needed in cabinet back piece 5/21
--   --   Cabinet trim base vanity
--   --   CODED LOCKBOX 0132
--   --   KITCHEN FAUCET 5/25
--   --   Electric to island needed? 5/30 X 2
--   --   New bathroom hole in basement 5/30
--   --   Plumber base bath fan 6/5 HVAC
--   --   Drywall basement water valve shut for (or box) 6/5 In process 6/15 - access panel
--   --   Drywall repair powder bath 6/5
--   --   Touch up paint needed throughout
--   --   Outside electric trim out
--   --   LR switchplate
--   --   Attic cover Painter - too small
--   --   Basement bath fan needs put in place
--   --   Hole in bonus room. Needs painter and electrician Painter
--   --   Hole in living room ceiling Painter - at recessed light
--   --   Oak treads to upper level- these need staining (not carpet)
--   --   Final touch up paint needed Painter
--   --   Repair front siding
--   --   Awning above front door slopes to right per buyer, Tom will check it out
--   --   Cut off front sewer clean out
--   --   Under front door/above step? PVC board
--   --   Bottom of double trashcan door front wonky at bottom right :-)
--   --   Side of the island electrical outlet whole below. Has a new skin been ordered from Kimberly? Tom will coordinate installation of new skin
--   --   Expensive piece of cabinet trim under trashcan at corner to be painted? Or trimmed out? Painter
--   --   Other side of island exposed trim Under base cabinet. Painted? Trimmed? Painter
--   --   Screens to be installed Jill
--   --   Plugs for screw holes french doors and front door Jill
--   --   Sanding and repainting above pendant light in kitchen Painter
--   --  
--   --   Sandy paint glob on ceiling in powder bathroom Painter
--   --   Drywall patch basement electrical outlet family room
--   --   Basement bonus room- Gaps along shoe mold and LVP on party wall Also on window wall
--   --   Cracked escutcheon basement bathroom toilet Jill, rotate
--   --   Paint install attic access cover
--   --   Call and crack in upstairs hall tub shower Jill is scheduling
--   --   Front rock loose
--   --   Paint pen on dirty cabinet doors Jill
--   --   Concrete on back door Jill
--   --   Electric outlet cover needed in bonus room Jill
--   --   Reinstall cabinet shoe molding Kenny
--   --   Base cover for dishwasher Kate asking Leisa to order
--   --   Patio Screen Doors
--   --   Few Missing Screens Jill
--   --   Paint Touch Up
--   --   Extend Pipes to Drain in Basement
--   --   Few Drywall Repairs
--   --   Electric cover needed in bonus room
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  12.14.2021    
-- -- Selections Sheet Signed (0)  12.14.2021     12/13/2021: sent to Trevor for buyer signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  12.21.2021     12/20/2021: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  12.20.2021     12/14/2021: waiting on upgrade deposit from buyer
-- -- Building Permit (30)  11.11.2021    
-- -- Order Roof & Floor Trusses (1)  11.11.2021    
-- -- Order Windows & Doors (0)  11.11.2021    
-- -- Stake Out Home (1)  11.08.2021    
-- -- Excavate (2)  11.29.2021    
-- -- Inspection (Footers) (1)  11.29.2021    
-- -- Inspection (Concrete Wall) (1)  02.14.2023    
-- -- Pour Footers (1)  11.29.2021    
-- -- Set Forms (2)  12.06.2021     in process 12/1
-- -- Pour Foundation Walls (1)  12.09.2021    
-- -- Plumb Slab (2)  12.13.2021    
-- -- Inspection (Plumbing Under Slab) (1)  12.20.2021    
-- -- Inspection (Conduit Under Slab) (1)  02.14.2023    
-- -- Prepare Slab (1)  12.20.2021    
-- -- Inspection (Slab) (1)  12.20.2021    
-- -- Inspection (Drain Tile) (0)  02.14.2023    
-- -- Pour Slab (1) *   12.20.2021    
-- -- Settlement Agent Confirmed (0)  11.24.2021    
-- -- Framing I (9)  01.03.2022    
-- -- Order Steps (0)  12.20.2021    
-- -- Order Tubs / Showers (0)  12.09.2021    
-- -- Framing II (8)  01.17.2022    
-- -- Framing III (8) *   02.03.2022    
-- -- Install Stairs (0)  02.23.2022    
-- -- Windows & Doors (0)  02.17.2022    
-- -- House Number and Status in Window (0)  02.28.2022    
-- -- Roofing (0)  02.17.2022    
-- -- Order Cabinets (0)  01.31.2022    
-- -- Order Appliances (0)  02.24.2022     French Upgrade
-- -- Deck (0)  04.25.2022     Expanded Deck 12 x 12- process 2-16
-- -- Gutters (0)  05.02.2022    
-- -- Driveway (0)  06.16.2022     Expanded patio 10 x 10
-- -- Patio (0)  02.14.2023    
-- -- Privacy Divider / Fence (0)  04.25.2022    
-- -- Sod / Seed / Landscaping (0)  06.29.2022    
-- -- HVAC Rough In (4)  02.17.2022     in process 2/13
-- -- Inspection (Rough In HVAC) (1)  03.21.2022    
-- -- Plumbing Rough In (4)  03.17.2022     Almost completed 3/12
-- -- Inspection (Rough In Plumbing) (1)  02.14.2023    
-- -- Electric Rough In (4)  03.17.2022    
-- -- Inspection (Rough In Electric) (1)  02.14.2023    
-- -- Inspection (Deck Piers) (0)  02.14.2023    
-- -- Inspection (Framing) (1)  02.14.2023    
-- -- Exterior Vinyl (0) *   04.25.2022    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2)  03.23.2022    
-- -- Inspection (Insulation) (1)  03.24.2022    
-- -- Inspection (Electric Service) (0)  06.02.2022    
-- -- Set Electric Meter (0)  04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  04.14.2022    
-- -- Inspection (Main Water Line) (0)  02.14.2023    
-- -- Order Interior Doors & Trim (0)  04.26.2022    
-- -- Drywall (Hang) (4) *   03.30.2022    
-- -- Loan Approval (0)  04.13.2022     5/3/2022: conditional approval with conditions
-- -- Deed Preparation (0)  04.13.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   04.10.2022     In process 4/10
-- -- Paint 1 (1)  04.13.2022    
-- -- Garage Door (0)  04.04.2022    
-- -- House Numbers (0)  06.18.2022    
-- -- Mailbox (0)  07.03.2022    
-- -- Cabinet Installation (2) *   04.18.2022     4/8 installation. Delivered 4/13
-- -- Granite Installation (1) *   05.21.2022     Kate will check
-- -- Interior Trim - Install (3)  05.04.2022     Painting trim 4/27
-- -- Order Plumbing / Lighting Fixtures (0)  10.05.2023    
-- -- Interior Trim - Paint (1)  02.14.2023    
-- -- Luxury Vinyl Plank (3) *   05.18.2022     In process 5/15
-- -- Luxury Vinyl Tile (0)  05.18.2022     Almost complete 5/15
-- -- Paint 2 (3)  05.21.2022     In process 5/18
-- -- Cover Floors (1)  05.30.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  05.16.2022    
-- -- Shoe Moulding (0)  05.25.2022     Completed on mail level 5/21
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  05.21.2022     Black accessories, Bonus bath, shower door black trim
-- -- Install Coded Lockbox (add extra keys) (0)  05.25.2022    
-- -- Pay Water / Sewer Taps (0)  05.19.2022    
-- -- Set Water Meter (0)  06.09.2022    
-- -- Electric Trim Out (3)  05.30.2022     Black Lighting
-- -- Ceiling Fans (0)  05.16.2022    
-- -- HVAC Trim Out (1)  06.15.2022     Furnace set 6/1
-- -- Plumbing Trim Out (2)  05.25.2022     Black Farmhouse. Needs faucet.
-- -- Install Appliances (0) *   06.09.2022     On site 5/30
-- -- Paint 3 (2) *   05.30.2022    
-- -- Carpet (2)  05.16.2022    
-- -- Appraiser Confirms Construction Completion (0)  06.18.2022    
-- -- Inspection (Final HVAC) (1)  02.14.2023    
-- -- Inspection (Final Plumbing) (1)  02.14.2023    
-- -- Inspection (Final Electric) (1)  02.14.2023    
-- -- Inspection (Final Building) (2) *   06.24.2022     Tuesday, June 21
-- -- Pre Walk Through (0)  06.24.2022    
-- -- Stain Hardwood Stairs (1)  06.16.2022    
-- -- Cleaning (1)  06.29.2022     Mon, Jun 27
-- -- Certificate of Occupancy (1) *   06.27.2022    
-- -- C.O. to Lender (0)  06.27.2022    
-- -- Schedule Closing (0)  06.28.2022    
-- -- Buyer Walk Through (1)  07.01.2022     Thursday, June 30th at 10:30 AM
-- -- Payment for Upgrades (0)  06.27.2022    
-- -- Keys to Settlement Agent (0)  06.28.2022    
-- -- Review Settlement Statement (0)  07.04.2022    
-- -- Jerry Signs Closing Documents (0)  06.30.2022     Wednesday, June 29, 1:00 PM
-- -- Request Trash Tote From POA Manager (0)  06.28.2022    
-- -- Closing (1)  07.04.2022     Brittany at West View Title; Friday, July 1, 10:30 AM
-- -- Remove Coded Lockbox (0)  07.11.2022