Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Basement bath plumbing |
Plumber said fine. No repairs needed. |
|
-- |
-- |
Door framing issue? 4/20 |
Drywall repair above doorway. Just needs painting 6/1 |
|
-- |
-- |
Bathroom drywall repair 5/11 |
Needs painting 6/15 |
|
-- |
-- |
Basement triple window frame issue in molding? 5/15 |
Trim guy |
|
-- |
-- |
Nail needed in cabinet back piece 5/21 |
|
|
-- |
-- |
Cabinet trim base vanity |
|
|
-- |
-- |
CODED LOCKBOX 0132 |
|
|
-- |
-- |
KITCHEN FAUCET 5/25 |
|
|
-- |
-- |
Electric to island needed? 5/30 |
X 2 |
|
-- |
-- |
New bathroom hole in basement 5/30 |
|
|
-- |
-- |
Plumber base bath fan 6/5 |
HVAC |
|
-- |
-- |
Drywall basement water valve shut for (or box) 6/5 |
In process 6/15 - access panel |
|
-- |
-- |
Drywall repair powder bath 6/5 |
|
|
-- |
-- |
Touch up paint needed throughout |
|
|
-- |
-- |
Outside electric trim out |
|
|
-- |
-- |
LR switchplate |
|
|
-- |
-- |
Attic cover |
Painter - too small |
|
-- |
-- |
Basement bath fan needs put in place |
|
|
-- |
-- |
Hole in bonus room. Needs painter and electrician |
Painter |
|
-- |
-- |
Hole in living room ceiling |
Painter - at recessed light |
|
-- |
-- |
Oak treads to upper level- these need staining (not carpet) |
|
|
-- |
-- |
Final touch up paint needed |
Painter |
|
-- |
-- |
Repair front siding |
|
|
-- |
-- |
Awning above front door slopes to right |
per buyer, Tom will check it out |
|
-- |
-- |
Cut off front sewer clean out |
|
|
-- |
-- |
Under front door/above step? |
PVC board |
|
-- |
-- |
Bottom of double trashcan door front wonky at bottom right :-) |
|
|
-- |
-- |
Side of the island electrical outlet whole below. Has a new skin been ordered from Kimberly? |
Tom will coordinate installation of new skin |
|
-- |
-- |
Expensive piece of cabinet trim under trashcan at corner to be painted? Or trimmed out? |
Painter |
|
-- |
-- |
Other side of island exposed trim Under base cabinet. Painted? Trimmed? |
Painter |
|
-- |
-- |
Screens to be installed |
Jill |
|
-- |
-- |
Plugs for screw holes french doors and front door |
Jill |
|
-- |
-- |
Sanding and repainting above pendant light in kitchen |
Painter |
|
-- |
-- |
|
|
|
-- |
-- |
Sandy paint glob on ceiling in powder bathroom |
Painter |
|
-- |
-- |
Drywall patch basement electrical outlet family room |
|
|
-- |
-- |
Basement bonus room- Gaps along shoe mold and LVP on party wall |
Also on window wall |
|
-- |
-- |
Cracked escutcheon basement bathroom toilet |
Jill, rotate |
|
-- |
-- |
Paint install attic access cover |
|
|
-- |
-- |
Call and crack in upstairs hall tub shower |
Jill is scheduling |
|
-- |
-- |
Front rock loose |
|
|
-- |
-- |
Paint pen on dirty cabinet doors |
Jill |
|
-- |
-- |
Concrete on back door |
Jill |
|
-- |
-- |
Electric outlet cover needed in bonus room |
Jill |
|
-- |
-- |
Reinstall cabinet shoe molding |
Kenny |
|
-- |
-- |
Base cover for dishwasher |
Kate asking Leisa to order |
|
-- |
-- |
Patio Screen Doors |
|
|
-- |
-- |
Few Missing Screens |
Jill |
|
-- |
-- |
Paint Touch Up |
|
|
-- |
-- |
Extend Pipes to Drain in Basement |
|
|
-- |
-- |
Few Drywall Repairs |
|
|
-- |
-- |
Electric cover needed in bonus room |
|
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 12.14.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.14.2021 |
12/13/2021: sent to Trevor for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 12.21.2021 |
12/20/2021: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.20.2021 |
12/14/2021: waiting on upgrade deposit from buyer |
|
-- |
-- |
Building Permit (30) 11.11.2021 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.11.2021 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.11.2021 |
|
|
-- |
-- |
Stake Out Home (1) 11.08.2021 |
|
|
-- |
-- |
Excavate (2) 11.29.2021 |
|
|
-- |
-- |
Inspection (Footers) (1) 11.29.2021 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 02.14.2023 |
|
|
-- |
-- |
Pour Footers (1) 11.29.2021 |
|
|
-- |
-- |
Set Forms (2) 12.06.2021 |
in process 12/1 |
|
-- |
-- |
Pour Foundation Walls (1) 12.09.2021 |
|
|
-- |
-- |
Plumb Slab (2) 12.13.2021 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 02.14.2023 |
|
|
-- |
-- |
Prepare Slab (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.20.2021 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 02.14.2023 |
|
|
-- |
-- |
Pour Slab (1) * 12.20.2021 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 11.24.2021 |
|
|
-- |
-- |
Framing I (9) 01.03.2022 |
|
|
-- |
-- |
Order Steps (0) 12.20.2021 |
|
|
-- |
-- |
Order Tubs / Showers (0) 12.09.2021 |
|
|
-- |
-- |
Framing II (8) 01.17.2022 |
|
|
-- |
-- |
Framing III (8) * 02.03.2022 |
|
|
-- |
-- |
Install Stairs (0) 02.23.2022 |
|
|
-- |
-- |
Windows & Doors (0) 02.17.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 02.28.2022 |
|
|
-- |
-- |
Roofing (0) 02.17.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 02.24.2022 |
French Upgrade |
|
-- |
-- |
Deck (0) 04.25.2022 |
Expanded Deck 12 x 12- process 2-16 |
|
-- |
-- |
Gutters (0) 05.02.2022 |
|
|
-- |
-- |
Driveway (0) 06.16.2022 |
Expanded patio 10 x 10 |
|
-- |
-- |
Patio (0) 02.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 04.25.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 06.29.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 02.17.2022 |
in process 2/13 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.21.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 03.17.2022 |
Almost completed 3/12 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 02.14.2023 |
|
|
-- |
-- |
Electric Rough In (4) 03.17.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 02.14.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 02.14.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.25.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 03.23.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 03.24.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.02.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 04.14.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 02.14.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.26.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 03.30.2022 |
|
|
-- |
-- |
Loan Approval (0) 04.13.2022 |
5/3/2022: conditional approval with conditions |
|
-- |
-- |
Deed Preparation (0) 04.13.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.10.2022 |
In process 4/10 |
|
-- |
-- |
Paint 1 (1) 04.13.2022 |
|
|
-- |
-- |
Garage Door (0) 04.04.2022 |
|
|
-- |
-- |
House Numbers (0) 06.18.2022 |
|
|
-- |
-- |
Mailbox (0) 07.03.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.18.2022 |
4/8 installation. Delivered 4/13 |
|
-- |
-- |
Granite Installation (1) * 05.21.2022 |
Kate will check |
|
-- |
-- |
Interior Trim - Install (3) 05.04.2022 |
Painting trim 4/27 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 10.05.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 02.14.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.18.2022 |
In process 5/15 |
|
-- |
-- |
Luxury Vinyl Tile (0) 05.18.2022 |
Almost complete 5/15 |
|
-- |
-- |
Paint 2 (3) 05.21.2022 |
In process 5/18 |
|
-- |
-- |
Cover Floors (1) 05.30.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 05.16.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 05.25.2022 |
Completed on mail level 5/21 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 05.21.2022 |
Black accessories, Bonus bath, shower door black trim |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 05.25.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.19.2022 |
|
|
-- |
-- |
Set Water Meter (0) 06.09.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 05.30.2022 |
Black Lighting |
|
-- |
-- |
Ceiling Fans (0) 05.16.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 06.15.2022 |
Furnace set 6/1 |
|
-- |
-- |
Plumbing Trim Out (2) 05.25.2022 |
Black Farmhouse. Needs faucet. |
|
-- |
-- |
Install Appliances (0) * 06.09.2022 |
On site 5/30 |
|
-- |
-- |
Paint 3 (2) * 05.30.2022 |
|
|
-- |
-- |
Carpet (2) 05.16.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.18.2022 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 02.14.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.24.2022 |
Tuesday, June 21 |
|
-- |
-- |
Pre Walk Through (0) 06.24.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.16.2022 |
|
|
-- |
-- |
Cleaning (1) 06.29.2022 |
Mon, Jun 27 |
|
-- |
-- |
Certificate of Occupancy (1) * 06.27.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 06.27.2022 |
|
|
-- |
-- |
Schedule Closing (0) 06.28.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 07.01.2022 |
Thursday, June 30th at 10:30 AM |
|
-- |
-- |
Payment for Upgrades (0) 06.27.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.28.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 07.04.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.30.2022 |
Wednesday, June 29, 1:00 PM |
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.28.2022 |
|
|
-- |
-- |
Closing (1) 07.04.2022 |
Brittany at West View Title; Friday, July 1, 10:30 AM |
|
-- |
-- |
Remove Coded Lockbox (0) 07.11.2022 |
|
|