37 ADDR
CONGERS-2 - 132  ::  1309 Palomino Trail
[ BUILD: 20210001835 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Basement bath plumbing Plumber said fine. No repairs needed.
Door framing issue? 4/20 Drywall repair above doorway. Just needs painting 6/1
Bathroom drywall repair 5/11 Needs painting 6/15
Basement triple window frame issue in molding? 5/15 Trim guy
Nail needed in cabinet back piece 5/21
Cabinet trim base vanity
CODED LOCKBOX 0132
KITCHEN FAUCET 5/25
Electric to island needed? 5/30 X 2
New bathroom hole in basement 5/30
Plumber base bath fan 6/5 HVAC
Drywall basement water valve shut for (or box) 6/5 In process 6/15 - access panel
Drywall repair powder bath 6/5
Touch up paint needed throughout
Outside electric trim out
LR switchplate
Attic cover Painter - too small
Basement bath fan needs put in place
Hole in bonus room. Needs painter and electrician Painter
Hole in living room ceiling Painter - at recessed light
Oak treads to upper level- these need staining (not carpet)
Final touch up paint needed Painter
Repair front siding
Awning above front door slopes to right per buyer, Tom will check it out
Cut off front sewer clean out
Under front door/above step? PVC board
Bottom of double trashcan door front wonky at bottom right :-)
Side of the island electrical outlet whole below. Has a new skin been ordered from Kimberly? Tom will coordinate installation of new skin
Expensive piece of cabinet trim under trashcan at corner to be painted? Or trimmed out? Painter
Other side of island exposed trim Under base cabinet. Painted? Trimmed? Painter
Screens to be installed Jill
Plugs for screw holes french doors and front door Jill
Sanding and repainting above pendant light in kitchen Painter
Sandy paint glob on ceiling in powder bathroom Painter
Drywall patch basement electrical outlet family room
Basement bonus room- Gaps along shoe mold and LVP on party wall Also on window wall
Cracked escutcheon basement bathroom toilet Jill, rotate
Paint install attic access cover
Call and crack in upstairs hall tub shower Jill is scheduling
Front rock loose
Paint pen on dirty cabinet doors Jill
Concrete on back door Jill
Electric outlet cover needed in bonus room Jill
Reinstall cabinet shoe molding Kenny
Base cover for dishwasher Kate asking Leisa to order
Patio Screen Doors
Few Missing Screens Jill
Paint Touch Up
Extend Pipes to Drain in Basement
Few Drywall Repairs
Electric cover needed in bonus room
UPGRADES - COMPLETED
    Finish Bonus Room  
    Finished Family Room  
    Finish Bonus Bath  
    Level Three Quartz  
    Farmhouse sink  
    Painted White Cabinetry Kitchen  
    Painted Bath Cabinetry  
    Oak Treads  
    Luxury Vinyl Plank- Upper Level  
    Expanded Deck 12x12  
    Expanded Patio 10x10  
    Sub way Tile Master Shower walls  
    Heavy Glass Shower Door For Master  
    Pull Out Waste Basket  
    Three Drawer Stack  
    Roll Out Trays in 33  
    Roll Out Trays in 18  
    French Style Refrigerator  
    Oak Stairs to Basement Level  
    LVP Bonus Room  
    LVP Family Room  
    Ship Lap Living Room Wall  
    Farmhouse Plumbing Package  
    Amendment to increase price by $49,075  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  12.14.2021    
-- -- Selections Sheet Signed (0)  12.14.2021     12/13/2021: sent to Trevor for buyer signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  12.21.2021     12/20/2021: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  12.20.2021     12/14/2021: waiting on upgrade deposit from buyer
-- -- Building Permit (30) *   11.11.2021    
-- -- Order Roof & Floor Trusses (1)  11.11.2021    
-- -- Order Windows & Doors (0)  11.11.2021    
-- -- Stake Out Home (1)  11.08.2021    
-- -- Excavate (2)  11.29.2021    
-- -- Inspection (Footers) (1)  11.29.2021    
-- -- Inspection (Concrete Wall) (1)  02.14.2023    
-- -- Pour Footers (1) *   11.29.2021    
-- -- Set Forms (2)  12.06.2021     in process 12/1
-- -- Pour Foundation Walls (1)  12.09.2021    
-- -- Plumb Slab (2)  12.13.2021    
-- -- Inspection (Plumbing Under Slab) (1)  12.20.2021    
-- -- Inspection (Conduit Under Slab) (1)  02.14.2023    
-- -- Prepare Slab (1)  12.20.2021    
-- -- Inspection (Slab) (1)  12.20.2021    
-- -- Inspection (Drain Tile) (0)  02.14.2023    
-- -- Pour Slab (1) *   12.20.2021    
-- -- Settlement Agent Confirmed (0)  11.24.2021    
-- -- Framing I (9)  01.03.2022    
-- -- Order Steps (0)  12.20.2021    
-- -- Order Tubs / Showers (0)  12.09.2021    
-- -- Framing II (8)  01.17.2022    
-- -- Framing III (8) *   02.03.2022    
-- -- Install Stairs (0) *   02.23.2022    
-- -- Windows & Doors (0) *   02.17.2022    
-- -- House Number and Status in Window (0)  02.28.2022    
-- -- Roofing (0) *   02.17.2022    
-- -- Order Cabinets (0)  01.31.2022    
-- -- Order Appliances (0)  02.24.2022     French Upgrade
-- -- Deck (0)  04.25.2022     Expanded Deck 12 x 12- process 2-16
-- -- Gutters (0)  05.02.2022    
-- -- Driveway (0) *   06.16.2022     Expanded patio 10 x 10
-- -- Patio (0)  02.14.2023    
-- -- Privacy Divider / Fence (0) *   04.25.2022    
-- -- Sod / Seed / Landscaping (0)  06.29.2022    
-- -- HVAC Rough In (4)  02.17.2022     in process 2/13
-- -- Plumbing Rough In (4)  03.17.2022     Almost completed 3/12
-- -- Electric Rough In (4)  03.17.2022    
-- -- Inspection (Rough In HVAC) (1)  03.21.2022    
-- -- Inspection (Rough In Plumbing) (1)  02.14.2023    
-- -- Inspection (Rough In Electric) (1)  02.14.2023    
-- -- Inspection (Framing) (1) *   02.14.2023    
-- -- Inspection (Deck Piers) (0)  02.14.2023    
-- -- Exterior Vinyl (0) *   04.25.2022    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2) *   03.23.2022    
-- -- Inspection (Insulation) (1)  03.24.2022    
-- -- Inspection (Electric Service) (0)  06.02.2022    
-- -- Set Electric Meter (0) *   04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  04.14.2022    
-- -- Inspection (Main Water Line) (0)  02.14.2023    
-- -- Order Interior Doors & Trim (0)  04.26.2022    
-- -- Drywall (Hang) (4) *   03.30.2022    
-- -- Loan Approval (0)  04.13.2022     5/3/2022: conditional approval with conditions
-- -- Deed Preparation (0)  04.13.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   04.10.2022     In process 4/10
-- -- Paint 1 (1)  04.13.2022    
-- -- Garage Door (0)  04.04.2022    
-- -- House Numbers (0)  06.18.2022    
-- -- Mailbox (0)  07.03.2022    
-- -- Cabinet Installation (2) *   04.18.2022     4/8 installation. Delivered 4/13
-- -- Granite Installation (1) *   05.21.2022     Kate will check
-- -- Interior Trim - Install (3) *   05.04.2022     Painting trim 4/27
-- -- Order Plumbing / Lighting Fixtures (0)  10.05.2023    
-- -- Interior Trim - Paint (1)  02.14.2023    
-- -- Luxury Vinyl Plank (3) *   05.18.2022     In process 5/15
-- -- Luxury Vinyl Tile (0)  05.18.2022     Almost complete 5/15
-- -- Paint 2 (3)  05.21.2022     In process 5/18
-- -- Cover Floors (0)  05.30.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  05.16.2022    
-- -- Shoe Moulding (0)  05.25.2022     Completed on mail level 5/21
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   05.21.2022     Black accessories, Bonus bath, shower door black trim
-- -- Install Coded Lockbox (add extra keys) (0)  05.25.2022    
-- -- Pay Water / Sewer Taps (0)  05.19.2022    
-- -- Set Water Meter (1) *   06.09.2022    
-- -- Electric Trim Out (3) *   05.30.2022     Black Lighting
-- -- Ceiling Fans (0)  05.16.2022    
-- -- HVAC Trim Out (1) *   06.15.2022     Furnace set 6/1
-- -- Plumbing Trim Out (2) *   05.25.2022     Black Farmhouse. Needs faucet.
-- -- Install Appliances (0) *   06.09.2022     On site 5/30
-- -- Paint 3 (2) *   05.30.2022    
-- -- Carpet (2)  05.16.2022    
-- -- Appraiser Confirms Construction Completion (0)  06.18.2022    
-- -- Inspection (Final HVAC) (0)  02.14.2023    
-- -- Inspection (Final Plumbing) (0)  02.14.2023    
-- -- Inspection (Final Electric) (0)  02.14.2023    
-- -- Inspection (Final Building) (4) *   06.24.2022     Tuesday, June 21
-- -- Pre Walk Through (0)  06.24.2022    
-- -- Stain Hardwood Stairs (1) *   06.16.2022    
-- -- Cleaning (1)  06.29.2022     Mon, Jun 27
-- -- Certificate of Occupancy (1) *   06.27.2022    
-- -- C.O. to Lender (0)  06.27.2022    
-- -- Schedule Closing (0)  06.28.2022    
-- -- Buyer Walk Through (1) *   07.01.2022     Thursday, June 30th at 10:30 AM
-- -- Payment for Upgrades (0)  06.27.2022    
-- -- Keys to Settlement Agent (0)  06.28.2022    
-- -- Review Settlement Statement (0)  07.04.2022    
-- -- Jerry Signs Closing Documents (0)  06.30.2022     Wednesday, June 29, 1:00 PM
-- -- Request Trash Tote From POA Manager (0)  06.28.2022    
-- -- Closing (1)  07.04.2022     Brittany at West View Title; Friday, July 1, 10:30 AM
-- -- Remove Coded Lockbox (0)  07.11.2022