Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Tub liner needed |
|
|
-- |
-- |
Attic covers here!! |
|
|
-- |
-- |
Garage hole patch 5/30 |
|
|
-- |
-- |
I don’t think French model fridge is in kitchen awaiting installation |
|
|
-- |
-- |
Paint railing |
|
|
-- |
-- |
Home Inspection, July 21 at 9AM |
|
|
-- |
-- |
Wood trim around garage door needs covered |
Weather stripping |
|
-- |
-- |
Front gutter repairs |
Cut off downspouts |
|
-- |
-- |
MB flooring piece missing 7/13 |
eric |
|
-- |
-- |
Gutter repairs |
|
|
-- |
-- |
Powder bath electric receptacle repair |
|
|
-- |
-- |
LR cable outlet cover needed |
|
|
-- |
-- |
Hand towel holders |
MB and hall bath-painters patched over screws. |
|
-- |
-- |
|
|
|
-- |
-- |
Hole at steps |
|
|
-- |
-- |
|
|
|
-- |
-- |
lots of bulbs needed |
|
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Overspray paint on cabinetry |
Painter |
|
-- |
-- |
The front exterior door and hinged garage door or missing their weatherstripping and the front door will not latch recommend repair |
Deadbolt wont latch |
|
-- |
-- |
|
|
|
-- |
-- |
Exterior surfaces. Noted loose and puckering aluminum trim at the front door overhang and the top of the garage door |
Tom |
|
-- |
-- |
Noted dented bottom garage door panel |
Tom |
|
-- |
-- |
Noted sloppy installation of the rear vinyl siding corners at the overhang |
Siding people |
|
-- |
-- |
|
|
|
-- |
-- |
Noted no sill support under the rear exterior door |
Tom |
|
-- |
-- |
|
|
|
-- |
-- |
Spice drawer not functioning as intended recommend repair |
Tom? Or cabinet installer? |
|
-- |
-- |
Adjust kitchen pantry pocket door |
|
|
-- |
-- |
Lower interior handrail at the steps squeaks against the wall when pressure is applied. |
Tom - extra bracket |
|
-- |
-- |
Master bedroom ceiling fan is noisier than normal when activated |
Tom |
|
-- |
-- |
Lockbox 8888 |
|
|
-- |
-- |
Side panel of kitchen island damaged |
Ordered |
|
-- |
-- |
Longer downspouts |
Tom |
|
-- |
-- |
Under wraps at bottom of vinyl back patio to be trimmed. |
Jill |
|
-- |
-- |
Back patio to be cleaned off |
Jill |
|
-- |
-- |
Exterior French doors to be cleaned |
|
|
-- |
-- |
Adjust pantry door |
|
|
-- |
-- |
Final walk with Jill- Monday 2:15 |
Closing Mo day 8/1 at 3:00 |
|
-- |
-- |
Adjust receptacle at the bottom of the stairs |
|
|
-- |
-- |
Adjust receptacle at the bottom of the stairs |
|
|
-- |
-- |
Power wash front and back |
|
|
-- |
-- |
Power wash front and back |
|
|
-- |
-- |
Front deadbolt will not latch |
Tom |
|
-- |
-- |
Secure flashing above front door |
Siding people |
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 12.01.2021 |
|
|
-- |
-- |
Selections Sheet Signed (0) 12.04.2021 |
12/1/2021: sent to buyer for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 12.10.2021 |
12/9/2021: waiting on Jerry to sign |
|
-- |
-- |
Deposit For Upgrades Received (0) 12.10.2021 |
12/4/2021: waiting on check from buyer |
|
-- |
-- |
Building Permit (30) 11.11.2021 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.11.2021 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.11.2021 |
|
|
-- |
-- |
Stake Out Home (1) 12.09.2021 |
|
|
-- |
-- |
Excavate (2) 12.09.2021 |
|
|
-- |
-- |
Inspection (Footers) (1) 12.14.2021 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.26.2022 |
|
|
-- |
-- |
Pour Footers (1) 12.14.2021 |
|
|
-- |
-- |
Set Forms (2) 01.03.2022 |
In process 12/26 |
|
-- |
-- |
Pour Foundation Walls (1) 01.03.2022 |
|
|
-- |
-- |
Plumb Slab (2) 01.17.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 01.31.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.26.2022 |
|
|
-- |
-- |
Prepare Slab (1) 02.03.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 02.03.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.26.2022 |
|
|
-- |
-- |
Pour Slab (1) * 02.10.2022 |
needs garage poured 2/2 |
|
-- |
-- |
Settlement Agent Confirmed (0) 04.26.2022 |
|
|
-- |
-- |
Framing I (9) 02.24.2022 |
|
|
-- |
-- |
Order Steps (0) 03.10.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 03.30.2022 |
|
|
-- |
-- |
Framing II (8) 03.07.2022 |
|
|
-- |
-- |
Framing III (8) * 03.13.2022 |
|
|
-- |
-- |
Install Stairs (0) 03.10.2022 |
|
|
-- |
-- |
Windows & Doors (0) 03.30.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 04.24.2022 |
|
|
-- |
-- |
Roofing (0) 03.30.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 05.16.2022 |
French Upgrade |
|
-- |
-- |
Deck (0) 04.23.2022 |
n/a |
|
-- |
-- |
Gutters (0) 06.08.2022 |
|
|
-- |
-- |
Driveway (0) 07.07.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 12.01.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 07.05.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 07.14.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 03.30.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 04.28.2022 |
4/22 |
|
-- |
-- |
Plumbing Rough In (4) 04.18.2022 |
In process 4/13 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.26.2022 |
|
|
-- |
-- |
Electric Rough In (4) 04.21.2022 |
In process 4/20 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.26.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.26.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.26.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.05.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 05.01.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.02.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.30.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.26.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.02.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.08.2022 |
|
|
-- |
-- |
Loan Approval (0) 07.05.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.13.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 05.09.2022 |
In process 5/8 |
|
-- |
-- |
Paint 1 (1) 05.15.2022 |
|
|
-- |
-- |
Garage Door (0) 05.25.2022 |
|
|
-- |
-- |
House Numbers (0) 07.11.2022 |
|
|
-- |
-- |
Mailbox (0) 07.18.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 05.11.2022 |
5/3 |
|
-- |
-- |
Granite Installation (1) * 05.21.2022 |
|
|
-- |
-- |
Interior Trim - Install (3) 06.05.2022 |
Needs painting 6/1 |
|
-- |
-- |
Interior Trim - Paint (1) 12.01.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 06.15.2022 |
In process 6/12 |
|
-- |
-- |
Luxury Vinyl Tile (0) 06.15.2022 |
|
|
-- |
-- |
Paint 2 (3) 06.18.2022 |
|
|
-- |
-- |
Cover Floors (1) 06.25.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 07.07.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 06.25.2022 |
On site 6/19 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 07.17.2022 |
Few bath accessories need installed. Mostly completed 7/13 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 07.14.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 06.16.2022 |
|
|
-- |
-- |
Set Water Meter (0) 07.18.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 07.17.2022 |
Black Lighting. In process 7/13 |
|
-- |
-- |
Ceiling Fans (0) 07.05.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 07.10.2022 |
|
|
-- |
-- |
Plumbing Trim Out (2) 06.29.2022 |
Black Standard |
|
-- |
-- |
Install Appliances (0) * 07.21.2022 |
before 07/20 |
|
-- |
-- |
Paint 3 (2) * 06.25.2022 |
|
|
-- |
-- |
Carpet (2) 06.21.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 08.01.2022 |
Johnny Hensley |
|
-- |
-- |
Inspection (Final HVAC) (1) 09.26.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 09.26.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 09.26.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 07.25.2022 |
July 21 |
|
-- |
-- |
Pre Walk Through (0) 07.21.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 07.27.2022 |
after final inspection |
|
-- |
-- |
Cleaning (1) 07.31.2022 |
in process 7/27 |
|
-- |
-- |
Certificate of Occupancy (1) * 07.25.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 07.25.2022 |
|
|
-- |
-- |
Schedule Closing (0) 07.26.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 07.29.2022 |
Friday, July 29 at 9AM |
|
-- |
-- |
Payment for Upgrades (0) 07.22.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 07.22.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 08.01.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 07.26.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 08.03.2022 |
|
|
-- |
-- |
Closing (1) 08.04.2022 |
Brittany @ West View Title, Mon, Aug 1, 3PM |
|
-- |
-- |
Remove Coded Lockbox (0) 08.17.2022 |
|
|