| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| French Model Refrigerator | ||||
| LVP Upstairs | ||||
| Painted Steps to bedroom level | ||||
| Expanded Driveway | ||||
| Spice Pull Out Base 9 | ||||
| Roll Out Trays 18 | ||||
| 3 Drawer Base in place 36 | ||||
| Amendment to increase price by $6,345 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.14.2021 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.26.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 01.31.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.26.2022 | ||
| -- | -- | Inspection (Slab) (1) 02.03.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.26.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 04.28.2022 | 4/22 | |
| -- | -- | Inspection (Rough In Plumbing) (1) 09.26.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.26.2022 | ||
| -- | -- | Inspection (Framing) (1) * 09.26.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.26.2022 | ||
| -- | -- | Inspection (Insulation) (1) 05.02.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 06.30.2022 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 05.12.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 07.25.2022 | July 21 | |