Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Need new check for $6,868.75 |
3/1/2022 |
|
-- |
-- |
Financing amendment |
|
|
-- |
-- |
Shower drain seal needs repair |
Is it fixed 6/5? |
|
-- |
-- |
Plumbing MB shower needed 5/15 |
|
|
-- |
-- |
Pre drywall inspection |
|
|
-- |
-- |
Deck? Expanded to 12x18-hope so! |
|
|
-- |
-- |
Basement door needed 6/25 |
On order |
|
-- |
-- |
Who uncovered the steps??? 7/16 |
|
|
-- |
-- |
|
|
|
-- |
-- |
Cover hardwood treads |
|
|
-- |
-- |
Powder bath light needs relocated |
|
|
-- |
-- |
Hall bath trim |
Needed around cabinet-MB cabinet also |
|
-- |
-- |
Drywall repairs bonus room and bonus bath |
|
|
-- |
-- |
Few splash blocks needed |
|
|
-- |
-- |
|
|
|
-- |
-- |
|
|
|
-- |
-- |
CODED LOCKBOX 0127 |
|
|
-- |
-- |
Few paint touch ups (basement bath) |
|
|
-- |
-- |
Is pantry shelving complete-leftover pieces. |
|
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
Mop garage |
|
|
-- |
-- |
Foyer light doesn’t work |
|
|
-- |
-- |
Pressure wash garage door |
|
|
-- |
-- |
Touch up paint exterior trim and trim around garage |
Blue-Taped |
|
-- |
-- |
Install bulb in garage door opener light |
Jill |
|
-- |
-- |
Self-closing door should be installed from garage to house. Make sure it works properly. |
Tom - needs pins, on order |
|
-- |
-- |
Paint Touch Up various doors |
Blue-Taped the ones noted in home inspection |
|
-- |
-- |
Electric cover missing in MB behind the door |
Electrician |
|
-- |
-- |
Make repairs to steps. Re-sand and repaint. |
Painter |
|
-- |
-- |
Powder bath and Basement bath sinks leak |
Plumber |
|
-- |
-- |
Loose bathtub faucet in Hall and Basement Bath |
Plumber |
|
-- |
-- |
Hot water and cold water switched? |
|
|
-- |
-- |
replace broken bonus/mechanical room door |
|
|
-- |
-- |
install screen doors |
8/25 |
|
-- |
-- |
Bonus Bath- Straighten light and paint touch up |
|
|
-- |
-- |
Sod backyard |
|
|
-- |
-- |
Tighten vertical trim on right side of island |
Trim guy |
|
-- |
-- |
Clean back deck |
|
|
-- |
-- |
Straighten dining chandelier |
|
|
-- |
-- |
Move conduit in trash pull out |
Tom will look at it |
|
-- |
-- |
Order new skin for kitchen island |
Kenny, waiting on owners to be home |
|
-- |
-- |
Adjust closet doors 2nd Bedroom |
|
|
-- |
-- |
Adjust Water Pressure |
Jill |
|
-- |
-- |
Caulk cabinet in guest bathroom |
|
|
-- |
-- |
final clean |
|
|
-- |
-- |
Paint touch up throughout |
|
|
-- |
-- |
Fix chip in guest bedroom door at bottom (to left) |
|
|
-- |
-- |
Trim closet doors on bottom in guest closets (all doors) |
|
|
-- |
-- |
master bathroom sink is leaking |
leaking again 9/15 |
|
-- |
-- |
Outside corner to cover cut edge of new skin |
On site as of 10/31 |
|
-- |
-- |
Leak at master bathroom sink |
11/10: Tom will look at it |
|
-- |
-- |
Ratified Contract? (0) 11.21.2021 |
|
|
-- |
-- |
$2500 Deposit Received (0) 11.30.2021 |
|
|
-- |
-- |
Association Packet Requested (0) 11.21.2021 |
|
|
-- |
-- |
Association Packet Received (0) 11.21.2021 |
|
|
-- |
-- |
Selections Meeting (0) 01.04.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 01.18.2022 |
1/14/2022: sent to Jared for buyer signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 02.03.2022 |
2/2/2022: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 02.02.2022 |
|
|
-- |
-- |
Building Permit (30) 01.10.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 03.31.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 03.31.2022 |
|
|
-- |
-- |
Stake Out Home (1) 12.14.2021 |
|
|
-- |
-- |
Excavate (2) 01.17.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 01.17.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 01.17.2022 |
|
|
-- |
-- |
Set Forms (2) 02.10.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 02.10.2022 |
|
|
-- |
-- |
Plumb Slab (2) 02.24.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 03.13.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 03.13.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.27.2022 |
|
|
-- |
-- |
Framing I (9) 03.24.2022 |
|
|
-- |
-- |
Order Steps (0) 04.11.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 04.28.2022 |
|
|
-- |
-- |
Framing II (8) 03.31.2022 |
|
|
-- |
-- |
Framing III (8) * 04.04.2022 |
|
|
-- |
-- |
Install Stairs (0) 04.11.2022 |
|
|
-- |
-- |
Windows & Doors (0) 05.15.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 05.19.2022 |
|
|
-- |
-- |
Roofing (0) 05.02.2022 |
|
|
-- |
-- |
Order Cabinets (0) 01.31.2022 |
|
|
-- |
-- |
Order Appliances (0) 05.16.2022 |
French Upgrade |
|
-- |
-- |
Deck (0) 07.20.2022 |
EXPANDED 12 x 18 |
|
-- |
-- |
Gutters (0) 07.03.2022 |
|
|
-- |
-- |
Driveway (0) 07.20.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 10.18.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 08.20.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 08.25.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 04.18.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 05.18.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 05.11.2022 |
In process 5/8 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 05.15.2022 |
In process 5/11 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.18.2022 |
|
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 05.18.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.19.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 07.25.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.13.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.07.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 05.16.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.26.2022 |
Finish Bonus Room, Bath. In process 5/25 |
|
-- |
-- |
Loan Approval (0) 12.31.2021 |
|
|
-- |
-- |
Deed Preparation (0) 04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 06.08.2022 |
In process 6/5 |
|
-- |
-- |
Paint 1 (1) 06.15.2022 |
|
|
-- |
-- |
Garage Door (0) 07.16.2022 |
|
|
-- |
-- |
House Numbers (0) 07.16.2022 |
|
|
-- |
-- |
Mailbox (0) 08.11.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 06.18.2022 |
June 10. On site 6/12 |
|
-- |
-- |
Granite Installation (1) * 08.03.2022 |
Tue, Jul 26. Partially installed 7/27 |
|
-- |
-- |
Interior Trim - Install (3) 07.06.2022 |
Needs painting 7/3 |
|
-- |
-- |
Interior Trim - Paint (1) 10.26.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 07.16.2022 |
In process 7/13 |
|
-- |
-- |
Luxury Vinyl Tile (0) 07.16.2022 |
In process 7/13 |
|
-- |
-- |
Paint 2 (3) 07.31.2022 |
|
|
-- |
-- |
Cover Floors (1) 07.31.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 07.28.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 07.31.2022 |
In process 7/23 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 08.14.2022 |
In process 8/10 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 08.15.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 07.28.2022 |
|
|
-- |
-- |
Set Water Meter (0) 08.04.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 08.10.2022 |
Black Lighting. In process 8/7 |
|
-- |
-- |
Ceiling Fans (0) 08.10.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 08.10.2022 |
In process 7/27 |
|
-- |
-- |
Plumbing Trim Out (2) 08.03.2022 |
Black Standard. In process 7/27 |
|
-- |
-- |
Install Appliances (0) * 08.10.2022 |
|
|
-- |
-- |
Paint 3 (2) * 07.31.2022 |
|
|
-- |
-- |
Carpet (2) 08.18.2022 |
In process 8/17 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 08.25.2022 |
Marty Walters |
|
-- |
-- |
Inspection (Final HVAC) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 08.15.2022 |
Reinspect Mon, Aug 15 |
|
-- |
-- |
Pre Walk Through (0) 08.20.2022 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 08.17.2022 |
First coat complete8/14 |
|
-- |
-- |
Cleaning (1) 08.20.2022 |
In process 8/17 |
|
-- |
-- |
Certificate of Occupancy (1) * 08.16.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 08.16.2022 |
|
|
-- |
-- |
Schedule Closing (0) 08.19.2022 |
|
|
-- |
-- |
Buyer Walk Through (1) 08.23.2022 |
9AM on Tuesday, August 23 |
|
-- |
-- |
Payment for Upgrades (0) 08.19.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 08.19.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 08.19.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 07.26.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 08.11.2022 |
|
|
-- |
-- |
Closing (1) 08.25.2022 |
Brittany @ West View Title (Tues, Aug 23, 11AM) |
|
-- |
-- |
Remove Coded Lockbox (0) 11.10.2022 |
|
|