| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finish Bonus Room | ||||
| Finish Bonus Bath | ||||
| White Kitchen Cabinetry | ||||
| White Bathroom Cabinetry | ||||
| Quartz Countertops Kitchen | ||||
| Farmhouse sink | ||||
| French Model Refrigerator | ||||
| Bonus Room LVP | ||||
| Oak Treads to bedroom Level | ||||
| Expanded 12 x 18 Deck | ||||
| 3 drawer base kitchen | ||||
| Double waste basket in Kitchen | ||||
| Expanded Driveway | ||||
| Amendment to increase price by $27,475 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 01.17.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 03.13.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 03.13.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.07.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 05.18.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 09.07.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.07.2022 | ||
| -- | -- | Inspection (Framing) (1) * 09.07.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.07.2022 | ||
| -- | -- | Inspection (Insulation) (1) 05.19.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 07.25.2022 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.13.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 08.15.2022 | Reinspect Mon, Aug 15 | |