37 ADDR
CONGERS-2 - 128  ::  1331 Palomino Trail
[ BUILD: 20220049 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
    Order Plumbing / Lighting Fixtures (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Window Layout? Rendering = Separate, Floor Plans = Together
Need rendering showing triple window with awning
deck stairs?
Micro needs vented 4/27
Jill-insulation in 127-please toss in all tubs
retaining wall between 128-129?
Basement vanity missing Setting Thu, Aug 4
No roll out rays
No trash can
No spice rack
No cabinet crown molding
Rate Lock Expires July 20
Paint garage Painter
Shoe molding needed basement bath after vanity is installed?
Mailboxes Tom
Paint front doors Painter
Splash blocks needed (all units) Tom
Drywall patch needed behind oven
Home Inspection Monday, August 9th at 5:30pm
Movers arrive 1pm on August 11
Touch up garage trim Painter
Cable cover Jill
Paint trim in base bath Painter
Privacy panel Jill will follow up
Gap in cabinet trim and paint Painter
Wrong front panel on waste basket Courtney - please clarify
Spice rack door correct? Or should handle be at top Handle should be at top so drawer pulls out correctly.
Caulk side splashes on vanities Painter
Cover on master bath light switch Painter
Push attic cover into place Painter
CODED LOCKBOX 0128
Touch Faucet not available-install after closing On order, Northeastern
Apply finish coat of paint to exterior trim below back door/above deck Add PVC board
Complete final grading of property
Threshold from deck to patio door does not have adequate support
Secure gasket to oven door housing. Tom will look at it, or CJ
Microwave does not exhaust to exterior correctly. CJ
Cover exposed wall framing in garage
Make repairs to closet door so it closes properly. Jill
Fix deadbolt in bonus room and kitchen door so it locks properly.
Replace HVAC filter Jill
Install smoke detector in bonus room?
Secure power bath toilet to floor Plumber
Truss in attic is cracked/split. Provide copy of repair report, or repair as appropriate. Tom will coordinate
Deck attack (attach) bracket needs to be properly installed.
Adjust door to bonus room closet Jill will ask Edgar the trim guy to look at it
Caulk end panel of shower just past shower door next to toilet
Hall Bath- paint vertical strip between bath and wall
caulk behind toilets where trim meets cabient
Raise pendant lights I foot Electrician
New door front for trash can and spice rack On order
Richard Ortega 571-934-6152
PVC board off deck
Pre
Shower caddy
UPGRADES - COMPLETED
    Finished Bonus Room  
    Bonus Bath  
    Painted Kitchen Perimeter Cabinets  
    Level 3 Quartz Countertops in Kitchen  
    Farmhouse sink  
    Shower Walls- ONYX  
    Shower Door  
    Luxur Vinyl Plank- Bonus Room  
    Luxury Vinyl Plank - Upper Level Hallway and Bedrooms  
    Oak Tread to bedroom level  
    Eggshell Paint  
    Touch 20 Kitchen Faucet  
    Farmhouse plumbing Package  
    Patio 10 x 10  
    Expanded Deck 12 x 18 (want to add stairs later)  
    Five piece drawer  
    Roll Out Trays BOTH B36  
    Double Waste Basket  
    Spice Rack  
    Vent Microwave to Exterior  
    Expanded Driveway  
    Main Level Crown Moulding  
    Cabinet Crown Moulding  
    Garage Door Keypad  
    Add an outlet in pantry for freezer  
    Amendment to increase price by $40,485  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  01.17.2022    
-- -- Selections Sheet Signed (0)  01.20.2022     1/18/2022: sent to Courtney for buyer signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  01.28.2022     1/28/2022: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  01.28.2022    
-- -- Building Permit (30) *   01.10.2022    
-- -- Order Roof & Floor Trusses (1)  03.31.2022    
-- -- Order Windows & Doors (0)  03.31.2022    
-- -- Stake Out Home (1)  12.14.2021    
-- -- Excavate (2)  01.17.2022    
-- -- Inspection (Footers) (1)  01.17.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1) *   01.17.2022    
-- -- Set Forms (2)  02.10.2022    
-- -- Pour Foundation Walls (1)  02.10.2022    
-- -- Plumb Slab (2)  02.24.2022    
-- -- Inspection (Plumbing Under Slab) (1)  03.13.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  03.13.2022    
-- -- Inspection (Slab) (1)  03.13.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Pour Slab (1) *   03.13.2022    
-- -- Settlement Agent Confirmed (0)  01.11.2022    
-- -- Framing I (9)  03.24.2022    
-- -- Order Steps (0)  04.11.2022    
-- -- Order Tubs / Showers (0)  04.28.2022    
-- -- Framing II (8)  03.31.2022    
-- -- Framing III (8) *   04.04.2022    
-- -- Install Stairs (0) *   04.11.2022    
-- -- Windows & Doors (0) *   05.19.2022    
-- -- House Number and Status in Window (0)  05.30.2022    
-- -- Roofing (0) *   05.02.2022    
-- -- Order Cabinets (0)  01.31.2022    
-- -- Order Appliances (0)  05.16.2022     Standard SS
-- -- Deck (0)  05.30.2022     Needs railings EXPANDED
-- -- Gutters (0)  06.29.2022    
-- -- Driveway (0) *   07.20.2022     Expanded Driveway, Expanded Patio 10 x 10. Week of july 18
-- -- Patio (0)  01.05.2023    
-- -- Privacy Divider / Fence (0) *   08.15.2022     Patio privacy divider?
-- -- Sod / Seed / Landscaping (0)  08.29.2022     after closing
-- -- HVAC Rough In (4)  05.05.2022     In process 4/18
-- -- Plumbing Rough In (4)  05.08.2022     In process 5/4
-- -- Electric Rough In (4)  05.11.2022     In process 5/8
-- -- Inspection (Rough In HVAC) (1)  05.12.2022     5/9
-- -- Inspection (Rough In Plumbing) (1)  09.07.2022    
-- -- Inspection (Rough In Electric) (1)  09.07.2022    
-- -- Inspection (Framing) (1) *   09.07.2022    
-- -- Inspection (Deck Piers) (0)  09.07.2022    
-- -- Exterior Vinyl (0) *   06.25.2022    
-- -- Exterior Stone (0)  06.25.2022    
-- -- Insulation (2) *   05.15.2022    
-- -- Inspection (Insulation) (1)  05.16.2022    
-- -- Inspection (Electric Service) (0)  07.25.2022    
-- -- Set Electric Meter (0) *   04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  03.13.2022    
-- -- Inspection (Main Water Line) (0)  09.07.2022    
-- -- Order Interior Doors & Trim (0)  05.16.2022    
-- -- Drywall (Hang) (4) *   05.23.2022     Finish Bonus Room bath. In process 5/18
-- -- Loan Approval (0)  07.07.2022    
-- -- Deed Preparation (0)  04.27.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   05.30.2022     in process 5/25
-- -- Paint 1 (1)  06.08.2022    
-- -- Garage Door (0)  07.03.2022    
-- -- House Numbers (0)  07.16.2022    
-- -- Mailbox (0)  08.10.2022    
-- -- Cabinet Installation (2) *   06.15.2022     June 12. On site 6/12
-- -- Granite Installation (1) *   08.03.2022     Tue, Jul 26. Partially complete 7/27
-- -- Interior Trim - Install (3) *   06.29.2022     Needs painting 6/25
-- -- Interior Trim - Paint (1)  01.05.2023    
-- -- Luxury Vinyl Plank (3) *   07.11.2022     In process 7/6
-- -- Luxury Vinyl Tile (0)  07.11.2022     In process 7/6
-- -- Paint 2 (3)  07.27.2022    
-- -- Cover Floors (0)  07.11.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  07.14.2022     Upgrade Farmhouse, Touch 20
-- -- Shoe Moulding (0)  07.20.2022     Almost completed 7/16
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   08.07.2022     Almost complete 8/3
-- -- Install Coded Lockbox (add extra keys) (0)  08.07.2022    
-- -- Pay Water / Sewer Taps (0)  07.28.2022    
-- -- Set Water Meter (1) *   08.04.2022    
-- -- Electric Trim Out (3) *   08.07.2022     Brushed Nickel. In process
-- -- Ceiling Fans (0)  07.07.2022    
-- -- HVAC Trim Out (1) *   07.27.2022     Almost completed 7/16
-- -- Plumbing Trim Out (2) *   08.03.2022     Farmhouse Plumbing, Brushed Nickel- Touch 20. In process 7/27
-- -- Install Appliances (0) *   08.07.2022    
-- -- Paint 3 (2) *   07.31.2022    
-- -- Carpet (2)  07.03.2022    
-- -- Appraiser Confirms Construction Completion (0)  08.10.2022     Johnny Hensley, Aug 8
-- -- Inspection (Final HVAC) (0)  09.07.2022    
-- -- Inspection (Final Plumbing) (0)  09.07.2022    
-- -- Inspection (Final Electric) (0)  09.07.2022    
-- -- Inspection (Final Building) (4) *   08.07.2022    
-- -- Pre Walk Through (0)  08.08.2022    
-- -- Stain Hardwood Stairs (1) *   08.11.2022     One coat of poly left 8/10-likely after closing.
-- -- Cleaning (1)  08.08.2022    
-- -- Certificate of Occupancy (1) *   08.09.2022    
-- -- C.O. to Lender (0)  08.09.2022    
-- -- Schedule Closing (0)  08.10.2022    
-- -- Buyer Walk Through (1) *   08.10.2022    
-- -- Payment for Upgrades (0)  08.11.2022    
-- -- Keys to Settlement Agent (0)  08.08.2022    
-- -- Review Settlement Statement (0)  08.11.2022    
-- -- Jerry Signs Closing Documents (0)  07.26.2022    
-- -- Request Trash Tote From POA Manager (0)  08.11.2022    
-- -- Closing (1)  08.11.2022     Brittany @ West View Title 8/10 at 1pm
-- -- Remove Coded Lockbox (0)  08.29.2022