1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 128  ::  1331 Palomino Trail
[ BUILD: 20220049 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Thu    Nov 28      Verify Window & Roof Structure (0)      
Thu    Nov 28      Rough In Microwave Vent (0)      
Thu    Nov 28      Order Plumbing / Lighting Fixtures (0)      
Thu    Nov 28      Blower Door Test (1)      
--   --   Window Layout? Rendering = Separate, Floor Plans = Together
--   --   Need rendering showing triple window with awning
--   --   deck stairs?
--   --   Micro needs vented 4/27
--   --   Jill-insulation in 127-please toss in all tubs
--   --   retaining wall between 128-129?
--   --   Basement vanity missing Setting Thu, Aug 4
--   --   No roll out rays
--   --   No trash can
--   --   No spice rack
--   --   No cabinet crown molding
--   --   Rate Lock Expires July 20
--   --   Paint garage Painter
--   --  
--   --   Shoe molding needed basement bath after vanity is installed?
--   --   Mailboxes Tom
--   --   Paint front doors Painter
--   --   Splash blocks needed (all units) Tom
--   --  
--   --   Drywall patch needed behind oven
--   --   Home Inspection Monday, August 9th at 5:30pm
--   --   Movers arrive 1pm on August 11
--   --   Touch up garage trim Painter
--   --   Cable cover Jill
--   --   Paint trim in base bath Painter
--   --   Privacy panel Jill will follow up
--   --   Gap in cabinet trim and paint Painter
--   --   Wrong front panel on waste basket Courtney - please clarify
--   --   Spice rack door correct? Or should handle be at top Handle should be at top so drawer pulls out correctly.
--   --   Caulk side splashes on vanities Painter
--   --   Cover on master bath light switch Painter
--   --   Push attic cover into place Painter
--   --   CODED LOCKBOX 0128
--   --   Touch Faucet not available-install after closing On order, Northeastern
--   --   Apply finish coat of paint to exterior trim below back door/above deck Add PVC board
--   --   Complete final grading of property
--   --   Threshold from deck to patio door does not have adequate support
--   --   Secure gasket to oven door housing. Tom will look at it, or CJ
--   --   Microwave does not exhaust to exterior correctly. CJ
--   --   Cover exposed wall framing in garage
--   --   Make repairs to closet door so it closes properly. Jill
--   --   Fix deadbolt in bonus room and kitchen door so it locks properly.
--   --   Replace HVAC filter Jill
--   --   Install smoke detector in bonus room?
--   --   Secure power bath toilet to floor Plumber
--   --   Truss in attic is cracked/split. Provide copy of repair report, or repair as appropriate. Tom will coordinate
--   --   Deck attack (attach) bracket needs to be properly installed.
--   --   Adjust door to bonus room closet Jill will ask Edgar the trim guy to look at it
--   --   Caulk end panel of shower just past shower door next to toilet
--   --   Hall Bath- paint vertical strip between bath and wall
--   --   caulk behind toilets where trim meets cabient
--   --   Raise pendant lights I foot Electrician
--   --   New door front for trash can and spice rack On order
--   --  
--   --  
--   --  
--   --   Richard Ortega 571-934-6152
--   --   PVC board off deck
--   --   Pre
--   --   Shower caddy
-- -- Ratified Contract? (0)  11.21.2021    
-- -- $2500 Deposit Received (0)  11.21.2021    
-- -- Association Packet Requested (0)  11.21.2021    
-- -- Association Packet Received (0)  11.21.2021    
-- -- Selections Meeting (0)  01.17.2022    
-- -- Selections Sheet Signed (0)  01.20.2022     1/18/2022: sent to Courtney for buyer signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  01.28.2022     1/28/2022: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  01.28.2022    
-- -- Building Permit (30)  01.10.2022    
-- -- Order Roof & Floor Trusses (1)  03.31.2022    
-- -- Order Windows & Doors (0)  03.31.2022    
-- -- Stake Out Home (1)  12.14.2021    
-- -- Excavate (2)  01.17.2022    
-- -- Inspection (Footers) (1)  01.17.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1)  01.17.2022    
-- -- Set Forms (2)  02.10.2022    
-- -- Pour Foundation Walls (1)  02.10.2022    
-- -- Plumb Slab (2)  02.24.2022    
-- -- Inspection (Plumbing Under Slab) (1)  03.13.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  03.13.2022    
-- -- Inspection (Slab) (1)  03.13.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Pour Slab (1) *   03.13.2022    
-- -- Settlement Agent Confirmed (0)  01.11.2022    
-- -- Framing I (9)  03.24.2022    
-- -- Order Steps (0)  04.11.2022    
-- -- Order Tubs / Showers (0)  04.28.2022    
-- -- Framing II (8)  03.31.2022    
-- -- Framing III (8) *   04.04.2022    
-- -- Install Stairs (0)  04.11.2022    
-- -- Windows & Doors (0)  05.19.2022    
-- -- House Number and Status in Window (0)  05.30.2022    
-- -- Roofing (0)  05.02.2022    
-- -- Order Cabinets (0)  01.31.2022    
-- -- Order Appliances (0)  05.16.2022     Standard SS
-- -- Deck (0)  05.30.2022     Needs railings EXPANDED
-- -- Gutters (0)  06.29.2022    
-- -- Driveway (0)  07.20.2022     Expanded Driveway, Expanded Patio 10 x 10. Week of july 18
-- -- Patio (0)  01.05.2023    
-- -- Privacy Divider / Fence (0)  08.15.2022     Patio privacy divider?
-- -- Sod / Seed / Landscaping (0)  08.29.2022     after closing
-- -- HVAC Rough In (4)  05.05.2022     In process 4/18
-- -- Inspection (Rough In HVAC) (1)  05.12.2022     5/9
-- -- Plumbing Rough In (4)  05.08.2022     In process 5/4
-- -- Inspection (Rough In Plumbing) (1)  09.07.2022    
-- -- Electric Rough In (4)  05.11.2022     In process 5/8
-- -- Inspection (Rough In Electric) (1)  09.07.2022    
-- -- Inspection (Deck Piers) (0)  09.07.2022    
-- -- Inspection (Framing) (1)  09.07.2022    
-- -- Exterior Vinyl (0) *   06.25.2022    
-- -- Exterior Stone (0)  06.25.2022    
-- -- Insulation (2)  05.15.2022    
-- -- Inspection (Insulation) (1)  05.16.2022    
-- -- Inspection (Electric Service) (0)  07.25.2022    
-- -- Set Electric Meter (0)  04.11.2023    
-- -- Inspection (Main Sewer Line) (0)  03.13.2022    
-- -- Inspection (Main Water Line) (0)  09.07.2022    
-- -- Order Interior Doors & Trim (0)  05.16.2022    
-- -- Drywall (Hang) (4) *   05.23.2022     Finish Bonus Room bath. In process 5/18
-- -- Loan Approval (0)  07.07.2022    
-- -- Deed Preparation (0)  04.27.2022    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   05.30.2022     in process 5/25
-- -- Paint 1 (1)  06.08.2022    
-- -- Garage Door (0)  07.03.2022    
-- -- House Numbers (0)  07.16.2022    
-- -- Mailbox (0)  08.10.2022    
-- -- Cabinet Installation (2) *   06.15.2022     June 12. On site 6/12
-- -- Granite Installation (1) *   08.03.2022     Tue, Jul 26. Partially complete 7/27
-- -- Interior Trim - Install (3)  06.29.2022     Needs painting 6/25
-- -- Interior Trim - Paint (1)  01.05.2023    
-- -- Luxury Vinyl Plank (3) *   07.11.2022     In process 7/6
-- -- Luxury Vinyl Tile (0)  07.11.2022     In process 7/6
-- -- Paint 2 (3)  07.27.2022    
-- -- Cover Floors (1)  07.11.2022    
-- -- Deliver Plumbing / Lighting Fixtures (0)  07.14.2022     Upgrade Farmhouse, Touch 20
-- -- Shoe Moulding (0)  07.20.2022     Almost completed 7/16
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  08.07.2022     Almost complete 8/3
-- -- Install Coded Lockbox (add extra keys) (0)  08.07.2022    
-- -- Pay Water / Sewer Taps (0)  07.28.2022    
-- -- Set Water Meter (0)  08.04.2022    
-- -- Electric Trim Out (3)  08.07.2022     Brushed Nickel. In process
-- -- Ceiling Fans (0)  07.07.2022    
-- -- HVAC Trim Out (1)  07.27.2022     Almost completed 7/16
-- -- Plumbing Trim Out (2)  08.03.2022     Farmhouse Plumbing, Brushed Nickel- Touch 20. In process 7/27
-- -- Install Appliances (0) *   08.07.2022    
-- -- Paint 3 (2) *   07.31.2022    
-- -- Carpet (2)  07.03.2022    
-- -- Appraiser Confirms Construction Completion (0)  08.10.2022     Johnny Hensley, Aug 8
-- -- Inspection (Final HVAC) (1)  09.07.2022    
-- -- Inspection (Final Plumbing) (1)  09.07.2022    
-- -- Inspection (Final Electric) (1)  09.07.2022    
-- -- Inspection (Final Building) (2) *   08.07.2022    
-- -- Pre Walk Through (0)  08.08.2022    
-- -- Stain Hardwood Stairs (1)  08.11.2022     One coat of poly left 8/10-likely after closing.
-- -- Cleaning (1)  08.08.2022    
-- -- Certificate of Occupancy (1) *   08.09.2022    
-- -- C.O. to Lender (0)  08.09.2022    
-- -- Schedule Closing (0)  08.10.2022    
-- -- Buyer Walk Through (1)  08.10.2022    
-- -- Payment for Upgrades (0)  08.11.2022    
-- -- Keys to Settlement Agent (0)  08.08.2022    
-- -- Review Settlement Statement (0)  08.11.2022    
-- -- Jerry Signs Closing Documents (0)  07.26.2022    
-- -- Request Trash Tote From POA Manager (0)  08.11.2022    
-- -- Closing (1)  08.11.2022     Brittany @ West View Title 8/10 at 1pm
-- -- Remove Coded Lockbox (0)  08.29.2022