37 ADDR
CONGERS-2 - 128  ::  1331 Palomino Trail
[ BUILD: 20220049 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room  
    Bonus Bath  
    Painted Kitchen Perimeter Cabinets  
    Level 3 Quartz Countertops in Kitchen  
    Farmhouse sink  
    Shower Walls- ONYX  
    Shower Door  
    Luxur Vinyl Plank- Bonus Room  
    Luxury Vinyl Plank - Upper Level Hallway and Bedrooms  
    Oak Tread to bedroom level  
    Eggshell Paint  
    Touch 20 Kitchen Faucet  
    Farmhouse plumbing Package  
    Patio 10 x 10  
    Expanded Deck 12 x 18 (want to add stairs later)  
    Five piece drawer  
    Roll Out Trays BOTH B36  
    Double Waste Basket  
    Spice Rack  
    Vent Microwave to Exterior  
    Expanded Driveway  
    Main Level Crown Moulding  
    Cabinet Crown Moulding  
    Garage Door Keypad  
    Add an outlet in pantry for freezer  
    Amendment to increase price by $40,485  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  01.17.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  03.13.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Inspection (Slab) (1)  03.13.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Inspection (Rough In HVAC) (1)  05.12.2022     5/9
-- -- Inspection (Rough In Plumbing) (1)  09.07.2022    
-- -- Inspection (Rough In Electric) (1)  09.07.2022    
-- -- Inspection (Framing) (1) *   09.07.2022    
-- -- Inspection (Deck Piers) (0)  09.07.2022    
-- -- Inspection (Insulation) (1)  05.16.2022    
-- -- Inspection (Electric Service) (0)  07.25.2022    
-- -- Inspection (Main Sewer Line) (0)  03.13.2022    
-- -- Inspection (Main Water Line) (0)  09.07.2022    
-- -- Inspection (Final HVAC) (0)  09.07.2022    
-- -- Inspection (Final Plumbing) (0)  09.07.2022    
-- -- Inspection (Final Electric) (0)  09.07.2022    
-- -- Inspection (Final Building) (4) *   08.07.2022