Home Sale Contingency |
Settlement Deadline = 4/15/2022 |
|
-- |
-- |
Hardwood treads to upper level |
Don’t think needed? |
|
-- |
-- |
Move doors for cabinets??? |
Cabinets in LR 8/24 |
|
-- |
-- |
Spice rack is difficult to open/close |
Waiting on cabinet people to come to fix it |
|
-- |
-- |
Master bathroom wall/vanity not flush |
Tom - caulk |
|
-- |
-- |
Quartz Vanity Topes |
|
|
-- |
-- |
Quartz Vanity Tops |
Installed by 9/23. Remove existing countertops. |
|
-- |
-- |
Blemish master vanity door? |
|
|
-- |
-- |
Rate Lock Expires Oct 11 !!! |
Can be extended to Oct 14 |
|
-- |
-- |
Confirming LVP on 2nd floor-correct? |
|
|
-- |
-- |
Two small areas of drywall damage on the ceiling |
|
|
-- |
-- |
Missing some siding on corner 9/21 |
Front corner |
|
-- |
-- |
Piece of missing siding at dormer |
|
|
-- |
-- |
Bottom portion of vinyl “line”is white |
Davenport |
|
-- |
-- |
Kitchen electrical outlets moved in island |
|
|
-- |
-- |
Coded lockbox 1212 |
|
|
-- |
-- |
Outlet cover needed hall bath |
Electrician |
|
-- |
-- |
Paint garage |
Painter |
|
-- |
-- |
Paint garage 10/5 |
Trim needs completed |
|
-- |
-- |
Black shower drain needed |
Plumber |
|
-- |
-- |
Caulk shower panels |
Painter |
|
-- |
-- |
Front stoop siding odd |
Davenport |
|
-- |
-- |
Gap between door and door jamb at french door in kitchen? |
Weatherstripping |
|
-- |
-- |
Paint touch up |
Painter |
|
-- |
-- |
Trim garage 10/8 |
Edgar |
|
-- |
-- |
Clean out bonus room |
|
|
-- |
-- |
Remove dishwasher from dining room |
Tom |
|
-- |
-- |
Needs shelves in master bath |
10/10 |
|
-- |
-- |
White trim below French doors needed |
Tom |
|
-- |
-- |
CODED LOCKBOX 1212 |
|
|
-- |
-- |
CODED LOCKBOX 1212 |
|
|
-- |
-- |
Three places in upstairs hall bath tub with cracks need to be repaired |
Oct 21 |
|
-- |
-- |
Leaking sink in master vanity |
|
|
-- |
-- |
Final Paint Touch Up |
Painter |
|
-- |
-- |
Install Screen Door |
Done? Tom |
|
-- |
-- |
Stain Steps |
|
|
-- |
-- |
Caulk sinks |
Painter |
|
-- |
-- |
Paint show at front door and paint front door |
|
|
-- |
-- |
Clean Back Patio and pressure wash |
|
|
-- |
-- |
Snap light in hallway needs repaired or replaced |
Electrician |
|
-- |
-- |
Drop off extra paint |
Painter |
|
-- |
-- |
Broken part in freezer |
10/31 - CJ has the part to install |
|
-- |
-- |
Leave extra paint |
Painter |
|
-- |
-- |
Refrigerator drawer difficult to use |
Jill will coordinate |
|
-- |
-- |
Extra paint? |
|
|
-- |
-- |
Street lights out |
Tom |
|
-- |
-- |
Water pooling in backyard |
Tom - diversion ditch from sediment pond behind trailer |
|
-- |
-- |
Sod behind house - does it need to be replaced? |
|
|
-- |
-- |
Does water pool during heavy rains? |
|
|
-- |
-- |
Adjust digital deadbolt for door lock |
Savannah looking at 10/9 |
|
-- |
-- |
2 threads going to bedroom level are cracked |
Tom going to check out 1:45 10/9 |
|
-- |
-- |
Cover at outside faucet to be fixed. |
Tom will look at |
|
-- |
-- |
Red clay washed into yard |
Pettit |
|
-- |
-- |
Address standing water |
Pettit |
|
-- |
-- |
Back faucet cover |
Tom |
|
-- |
-- |
Remove mud from yard |
|
|
-- |
-- |
Ratified Contract? (0) 01.07.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 01.11.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 01.07.2022 |
|
|
-- |
-- |
Association Packet Received (0) 01.15.2022 |
1/7/2022: requested |
|
-- |
-- |
Selections Meeting (0) 02.24.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 03.04.2022 |
2/23/2022: sent to Luke for signature |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 03.11.2022 |
3/11/2022: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 03.11.2022 |
|
|
-- |
-- |
Building Permit (30) 01.12.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 05.02.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.02.2022 |
|
|
-- |
-- |
Stake Out Home (1) 02.24.2022 |
|
|
-- |
-- |
Excavate (2) 03.07.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 03.07.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 03.07.2022 |
|
|
-- |
-- |
Set Forms (2) 03.24.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 03.28.2022 |
|
|
-- |
-- |
Plumb Slab (2) 04.19.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 04.21.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 04.25.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 05.02.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 05.12.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 04.02.2022 |
|
|
-- |
-- |
Framing I (9) 05.26.2022 |
|
|
-- |
-- |
Order Steps (0) 06.18.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.20.2022 |
|
|
-- |
-- |
Framing II (8) 06.02.2022 |
|
|
-- |
-- |
Framing III (8) * 06.05.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 09.26.2024 |
|
|
-- |
-- |
Install Stairs (0) 06.25.2022 |
|
|
-- |
-- |
Windows & Doors (0) 06.25.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 07.07.2022 |
|
|
-- |
-- |
Roofing (0) 08.17.2022 |
|
|
-- |
-- |
Order Cabinets (0) 07.11.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard SS |
|
-- |
-- |
Deck (0) 04.23.2022 |
n/a |
|
-- |
-- |
Gutters (0) 10.05.2022 |
Greg |
|
-- |
-- |
Driveway (0) 10.12.2022 |
STANDARD - apron in front of sidewalk |
|
-- |
-- |
Patio (0) 10.11.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 09.17.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 10.20.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 06.25.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 07.27.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 09.26.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 07.16.2022 |
In process7/13 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.07.2022 |
|
|
-- |
-- |
Electric Rough In (4) 07.24.2022 |
in process 7/21 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.07.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 09.07.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.07.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 09.21.2022 |
in process 9/17 |
|
-- |
-- |
Exterior Stone (0) 04.14.2022 |
|
|
-- |
-- |
Insulation (2) 07.27.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 08.03.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 10.03.2022 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 05.12.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 09.08.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 08.04.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 08.03.2022 |
Stocked 7/31 |
|
-- |
-- |
Loan Approval (0) 09.20.2022 |
|
|
-- |
-- |
Deed Preparation (0) 04.27.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 08.10.2022 |
In process 8/3 |
|
-- |
-- |
Paint 1 (1) 08.17.2022 |
|
|
-- |
-- |
Garage Door (0) 09.28.2022 |
|
|
-- |
-- |
House Numbers (0) 10.02.2022 |
|
|
-- |
-- |
Mailbox (0) 09.29.2022 |
|
|
-- |
-- |
Cabinet Installation (2) * 08.28.2022 |
Thu, Aug 25 |
|
-- |
-- |
Granite Installation (1) * 09.24.2022 |
templated 9/7, by 9/23 |
|
-- |
-- |
Interior Trim - Install (3) 09.14.2022 |
Needs painting 9/11 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 09.20.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 10.26.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 09.21.2022 |
main level completed 9/17 |
|
-- |
-- |
Luxury Vinyl Tile (0) 09.21.2022 |
In process |
|
-- |
-- |
Paint 2 (3) 09.17.2022 |
|
|
-- |
-- |
Cover Floors (1) 09.28.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 09.19.2022 |
Black Plumbing, Black Lighting |
|
-- |
-- |
Shoe Moulding (0) 09.24.2022 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 10.08.2022 |
Black accessories, shower door black trim. In process 10/5. Interior Handles are completed. |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 10.02.2022 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 09.19.2022 |
|
|
-- |
-- |
Set Water Meter (0) 09.29.2022 |
|
|
-- |
-- |
Electric Trim Out (3) 10.02.2022 |
Black Standard. Started 9/28 |
|
-- |
-- |
Ceiling Fans (0) 10.03.2022 |
|
|
-- |
-- |
HVAC Trim Out (1) 09.28.2022 |
In process 9/14 |
|
-- |
-- |
Blower Door Test (1) 10.27.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 10.02.2022 |
Black Standard. In process 9/24. Only hall bath needs completing. |
|
-- |
-- |
Install Appliances (0) * 10.05.2022 |
|
|
-- |
-- |
Paint 3 (2) * 09.17.2022 |
|
|
-- |
-- |
Carpet (2) 09.19.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 10.11.2022 |
Jeff Eye, Monday, Oct 10 |
|
-- |
-- |
Inspection (Final HVAC) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 10.06.2022 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 10.10.2022 |
Re-inspect, Thursday, Oct 6 |
|
-- |
-- |
Pre Walk Through (0) 10.10.2022 |
Thu, Oct 6 |
|
-- |
-- |
Stain Hardwood Stairs (1) 10.14.2022 |
Jill will coordinate with painter. In process 10/12 |
|
-- |
-- |
Cleaning (1) 10.10.2022 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 10.11.2022 |
|
|
-- |
-- |
C.O. to Lender (0) 10.11.2022 |
|
|
-- |
-- |
Schedule Closing (0) 10.10.2022 |
Oct 14? |
|
-- |
-- |
Buyer Walk Through (1) 10.11.2022 |
Monday, Oct 10 at 12PM |
|
-- |
-- |
Payment for Upgrades (0) 10.10.2022 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 10.10.2022 |
|
|
-- |
-- |
Review Settlement Statement (0) 10.13.2022 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 10.13.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 10.11.2022 |
|
|
-- |
-- |
Closing (1) 10.17.2022 |
Brittany @ West View Title, Oct 14 |
|
-- |
-- |
Remove Coded Lockbox (0) 11.10.2022 |
|
|