37 ADDR
CONGERS-2 - 119  ::  1373 Palomino Trail
[ BUILD: 20220068 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
    LVP Up Hallway and Bedrooms  
    LVP Bonus Room  
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room  
    Finished Bonus Bath  
    Kitchen accessories- 18" roll outs $375, 36" roll outs $475, three stack drawer $375, double trash $450  
    Farmhouse Sink  
    Paint- eggshell $1000 and add third color $300  
    Farmhouse Plumbing Package  
    Oak Stair system  
    Expanded Driveway  
    Expanded Deck 12 x 12  
    Expanded Patio 10x10  
    Main Level Crown Moulding  
    digital deadbolt  
    Level II Quartz (Classique) Kitchen Countertops  
    Amendment to increase price by $32,110  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  01.31.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  03.31.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Inspection (Slab) (1)  03.31.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Inspection (Rough In HVAC) (1)  07.06.2022    
-- -- Inspection (Rough In Plumbing) (1)  09.07.2022    
-- -- Inspection (Rough In Electric) (1)  09.07.2022    
-- -- Inspection (Framing) (1) *   09.07.2022    
-- -- Inspection (Deck Piers) (0)  09.07.2022    
-- -- Inspection (Insulation) (1)  07.10.2022    
-- -- Inspection (Electric Service) (0)  09.12.2022    
-- -- Inspection (Main Sewer Line) (0)  05.12.2022    
-- -- Inspection (Main Water Line) (0)  09.07.2022    
-- -- Inspection (Final HVAC) (0)  10.12.2022    
-- -- Inspection (Final Plumbing) (0)  10.14.2022    
-- -- Inspection (Final Electric) (0)  10.14.2022    
-- -- Inspection (Final Building) (4) *   10.14.2022     Wed, Oct 12