| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| LVP Upstairs Hall & Bedrooms | ||||
| LVP Bonus Room | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room behind Garage | ||||
| Finished Full Bathroom in Bonus Room | ||||
| Expanded 12x12 deck | ||||
| White Kitchen Cabinetry | ||||
| Level III Quartz Countertops | ||||
| Three Drawer Base in place of 36 inch base cabinet | ||||
| French Model Refrigerator | ||||
| Farmhouse Plumbing Package | ||||
| Shower Door Black Trim | ||||
| Stained hardwood Treads to Bedroom Level | ||||
| Expanded Driveway | ||||
| White subway tile walls with white pan | ||||
| Amendment to increase price by $31,425 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 01.31.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 03.31.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 03.31.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.07.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 06.25.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 09.07.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.07.2022 | ||
| -- | -- | Inspection (Framing) (1) * 09.07.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.07.2022 | ||
| -- | -- | Inspection (Insulation) (1) 06.30.2022 | Mon, Jun 27 | |
| -- | -- | Inspection (Electric Service) (0) 09.12.2022 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 05.12.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 09.07.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 09.26.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 09.28.2022 | Mon, Sep 26 | |