37 ADDR
CONGERS-2 - 19  ::  1394 Palomino Trail
[ BUILD: 20220407 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Painted White Kitchen Cabinetry  
    Level III Granite  
    Double Waste Basket  
    Three Drawer Stack  
    Cabinet Crown Moulding  
    LVP Upstairs Hall & Bedrooms  
    Oak Treads to bedroom Level  
    GRAY subway tile panel walls Master Shower  
    Shower Door with Black Trim  
    Expanded 10 x 18 patio  
    Expanded Driveway  
    Microwave vented to exterior  
    three additional ceiling fans ( BR 2, 3 and FR)  
    Eggshell Paint  
    Amendment to increase price by $17,520  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  03.24.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  04.28.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Inspection (Slab) (1)  06.02.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Inspection (Rough In HVAC) (1)  08.28.2022    
-- -- Inspection (Rough In Plumbing) (1)  09.07.2022    
-- -- Inspection (Rough In Electric) (1)  09.07.2022    
-- -- Inspection (Framing) (1) *   09.07.2022    
-- -- Inspection (Deck Piers) (0)  09.07.2022    
-- -- Inspection (Insulation) (1)  09.01.2022    
-- -- Inspection (Electric Service) (0)  10.27.2022    
-- -- Inspection (Main Sewer Line) (0)  05.12.2022    
-- -- Inspection (Main Water Line) (0)  09.08.2022    
-- -- Inspection (Final HVAC) (0)  12.08.2022    
-- -- Inspection (Final Plumbing) (0)  12.08.2022    
-- -- Inspection (Final Electric) (0)  12.08.2022    
-- -- Inspection (Final Building) (4) *   12.08.2022     Tues Dec. 6