| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Painted White Kitchen Cabinetry | ||||
| Level III Granite | ||||
| Double Waste Basket | ||||
| Three Drawer Stack | ||||
| Cabinet Crown Moulding | ||||
| LVP Upstairs Hall & Bedrooms | ||||
| Oak Treads to bedroom Level | ||||
| GRAY subway tile panel walls Master Shower | ||||
| Shower Door with Black Trim | ||||
| Expanded 10 x 18 patio | ||||
| Expanded Driveway | ||||
| Microwave vented to exterior | ||||
| three additional ceiling fans ( BR 2, 3 and FR) | ||||
| Eggshell Paint | ||||
| Amendment to increase price by $17,520 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 03.24.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 04.28.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 06.02.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.07.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 08.28.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 09.07.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.07.2022 | ||
| -- | -- | Inspection (Framing) (1) * 09.07.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 09.07.2022 | ||
| -- | -- | Inspection (Insulation) (1) 09.01.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 10.27.2022 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 05.12.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 09.08.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 12.08.2022 | ||
| -- | -- | Inspection (Final Plumbing) (0) 12.08.2022 | ||
| -- | -- | Inspection (Final Electric) (0) 12.08.2022 | ||
| -- | -- | Inspection (Final Building) (4) * 12.08.2022 | Tues Dec. 6 | |