Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Step coverings coming off. Trip hazard |
|
|
-- |
-- |
Cultured marble tops needed |
In living room 11/16 |
|
-- |
-- |
Missing closet door. Up bedroom |
Needs door knob 1/21 - Jill |
|
-- |
-- |
Extra cabinet in kitchen-move before flooring |
Maybe it is gone now - Tom |
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Master toilet looks crooked |
Plumber |
|
-- |
-- |
Trim garage |
Edgar or Henry |
|
-- |
-- |
Cable/electric covers needed |
|
|
-- |
-- |
Patch holes base bath |
Painter |
|
-- |
-- |
C can’t find keys? 1/7 |
|
|
-- |
-- |
Put attic cover in place |
|
|
-- |
-- |
Finish master bedroom shelving |
|
|
-- |
-- |
Drywall repair- hole on stair wall |
|
|
-- |
-- |
Pop at top of stairs in nook |
|
|
-- |
-- |
Install thermostat |
|
|
-- |
-- |
Install cable covers |
|
|
-- |
-- |
Install vanity light and upstairs hallway |
|
|
-- |
-- |
Install fan in master bathroom |
|
|
-- |
-- |
Lightbulbs needed basement |
Few missing 1/14 |
|
-- |
-- |
Black shower drain needed |
Plumber |
|
-- |
-- |
CODED LOCKBOX 2323 |
|
|
-- |
-- |
Fill in a Little Rock to front left side at ground? |
|
|
-- |
-- |
Completely uncalled-for amount of mud in bonus room |
|
|
-- |
-- |
Screens |
|
|
-- |
-- |
Closet door in bedroom |
|
|
-- |
-- |
Dented freezer door |
|
|
-- |
-- |
Clean patio and out front |
Bridges |
|
-- |
-- |
Paint touch up through our |
|
|
-- |
-- |
Paint touch up throughout |
|
|
-- |
-- |
Spice rack doesn’t close or open smoothly |
|
|
-- |
-- |
Transition strip going into bonus room isn’t secure |
|
|
-- |
-- |
Transition strip at the top of the first set of stairs isn’t secure |
|
|
-- |
-- |
Remove extra screens under stairs in basement closet |
|
|
-- |
-- |
Front door latch needs adjusted so it latches better |
|
|
-- |
-- |
Crack in the frame of the LR window |
|
|
-- |
-- |
Hole in the back of the coffee bar (on inside of cabinet) |
|
|
-- |
-- |
Cabinet to the right of the fridge don’t open all the way and the drawer hits the door when you open it |
|
|
-- |
-- |
Key fiasco- two different keys for deadbolt/main door |
|
|
-- |
-- |
Key Issue- two different keys/locks |
Joe |
|
-- |
-- |
Light bulb powder bath |
|
|
-- |
-- |
Scratched cultured marble tops |
delivered 2/9, installed 2/10 |
|
-- |
-- |
caulk inside master shower and outside trim |
|
|
-- |
-- |
fix squeak in master floor |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
black drain master |
|
|
-- |
-- |
fadd trim under pantry |
Painter |
|
-- |
-- |
replace all cultured marble. |
|
|
-- |
-- |
sink stain in farm sink? |
|
|
-- |
-- |
driveway discoloration |
Tom |
|
-- |
-- |
Crack in tub |
fixing 2/2 and 2/3 |
|
-- |
-- |
Drywall repair above master shower |
Painter |
|
-- |
-- |
Dirty base bath fan |
Jill |
|
-- |
-- |
Paint smudges MB near light switch |
Painter |
|
-- |
-- |
Crack in caulk of countertop |
Fenco will be scheduling - kitchen |
|
-- |
-- |
Mark 540-834-7659 |
|
|
-- |
-- |
Leaking dishwasher |
Appliance is leaking (CJ) gasket issue (on order) |
|
-- |
-- |
Cabinet Blemishes |
Jill to view upon return |
|
-- |
-- |
Flooring Scratches |
Jill to view upon return |
|
-- |
-- |
Grading to fix drainage issue |
Tom |
|
-- |
-- |
French drain |
Tom, Bub |
|
-- |
-- |
Ratified Contract? (0) 02.24.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 03.02.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 02.24.2022 |
|
|
-- |
-- |
Association Packet Received (0) 03.04.2022 |
|
|
-- |
-- |
Selections Meeting (0) 03.23.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 04.02.2022 |
3/23/2022: sent to Luke for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 04.14.2022 |
4/12/2022: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 04.13.2022 |
|
|
-- |
-- |
Building Permit (30) 03.06.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 08.04.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.03.2022 |
|
|
-- |
-- |
Stake Out Home (1) 03.24.2022 |
|
|
-- |
-- |
Excavate (2) 03.24.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 03.24.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 03.24.2022 |
|
|
-- |
-- |
Set Forms (2) 04.07.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 04.07.2022 |
|
|
-- |
-- |
Plumb Slab (2) 06.27.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 06.27.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 07.25.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 08.04.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.07.2022 |
|
|
-- |
-- |
Pour Slab (1) * 08.04.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 02.24.2022 |
|
|
-- |
-- |
Framing I (9) 08.22.2022 |
|
|
-- |
-- |
Order Steps (0) 08.29.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.20.2022 |
|
|
-- |
-- |
Framing II (8) 09.01.2022 |
|
|
-- |
-- |
Framing III (8) * 09.06.2022 |
|
|
-- |
-- |
Install Stairs (0) 10.03.2022 |
|
|
-- |
-- |
Windows & Doors (0) 10.03.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 10.24.2022 |
|
|
-- |
-- |
Roofing (0) 10.03.2022 |
|
|
-- |
-- |
Order Cabinets (0) 09.06.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
French Upgrade |
|
-- |
-- |
Deck (0) 11.02.2022 |
Standard |
|
-- |
-- |
Gutters (0) 12.28.2022 |
|
|
-- |
-- |
Driveway (0) 11.12.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 10.16.2022 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 12.17.2022 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 12.31.2022 |
|
|
-- |
-- |
HVAC Rough In (4) 09.24.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 09.22.2022 |
|
|
-- |
-- |
Plumbing Rough In (4) 09.24.2022 |
In process 9/21 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 10.05.2022 |
|
|
-- |
-- |
Electric Rough In (4) 10.05.2022 |
In process10/2 |
|
-- |
-- |
Inspection (Rough In Electric) (1) 10.05.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 10.05.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 10.05.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 12.10.2022 |
In process 11/27 |
|
-- |
-- |
Exterior Stone (0) 12.31.2022 |
In process 12/28 |
|
-- |
-- |
Insulation (2) 10.16.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 10.19.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 01.10.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 12.08.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 12.08.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 12.08.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 10.16.2022 |
Finish Bonus Room, Bath |
|
-- |
-- |
Loan Approval (0) 03.15.2022 |
|
|
-- |
-- |
Deed Preparation (0) 11.08.2022 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 11.02.2022 |
In process 10/29 |
|
-- |
-- |
Paint 1 (1) 11.05.2022 |
|
|
-- |
-- |
Garage Door (0) 12.31.2022 |
week of 12/5 |
|
-- |
-- |
House Numbers (0) 12.27.2022 |
|
|
-- |
-- |
Mailbox (0) 01.07.2023 |
Post up, needs mailbox |
|
-- |
-- |
Cabinet Installation (2) * 11.09.2022 |
In process 11/5 |
|
-- |
-- |
Granite Installation (1) * 11.27.2022 |
Monday 11/23 |
|
-- |
-- |
Interior Trim - Install (3) 12.07.2022 |
In process 12/3 |
|
-- |
-- |
Interior Trim - Paint (1) 12.10.2022 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 12.27.2022 |
Almost complete 12/17 |
|
-- |
-- |
Luxury Vinyl Tile (0) 12.27.2022 |
In process 12/17 |
|
-- |
-- |
Paint 2 (3) 12.10.2022 |
|
|
-- |
-- |
Cover Floors (1) 12.31.2022 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 12.08.2022 |
Farmhouse Plumbing Black |
|
-- |
-- |
Shoe Moulding (0) 12.28.2022 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 01.07.2023 |
shelving needs completed in master closet 1/4 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 01.12.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.12.2022 |
|
|
-- |
-- |
Set Water Meter (0) 01.05.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 01.16.2023 |
Black Lighting. In process 1/11 |
|
-- |
-- |
Ceiling Fans (0) 01.04.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 01.11.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 12.28.2022 |
Black farmhouse upgrade |
|
-- |
-- |
Install Appliances (0) * 01.04.2023 |
Delivery 10/17, Install 10/27 ( confirm with CJ). On site 12/31 |
|
-- |
-- |
Paint 3 (2) * 12.14.2022 |
|
|
-- |
-- |
Carpet (2) 12.28.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 01.16.2023 |
Robbie Miller, Sun, Jan 15 |
|
-- |
-- |
Inspection (Final HVAC) (1) 01.16.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 01.16.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 01.16.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 01.18.2023 |
Reinspect, Jan 18 |
|
-- |
-- |
Pre Walk Through (0) 01.16.2023 |
Sat/Sun, Jan 14-15 |
|
-- |
-- |
Stain Hardwood Stairs (1) 01.07.2023 |
|
|
-- |
-- |
Cleaning (1) 01.18.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 01.20.2023 |
Final was approved 1/18 |
|
-- |
-- |
C.O. to Lender (0) 01.20.2023 |
|
|
-- |
-- |
Schedule Closing (0) 01.25.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 01.19.2023 |
Mon, Jan 16 |
|
-- |
-- |
Payment for Upgrades (0) 01.04.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 01.23.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 01.26.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 12.20.2022 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 01.10.2023 |
|
|
-- |
-- |
Closing (1) 01.26.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 01.26.2023 |
|
|