37 ADDR
CONGERS-2 - 23  ::  1416 Palomino Trail
[ BUILD: 20220411 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
    Upgraded Carpet Pad in Bonus Room  
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finished Bonus Room  
    Finished Bonus Bath  
    Level 1 Quartz  
    Farmhouse Sink  
    Three Drawer Stack  
    Pantry Roll out trays  
    Double Waste Basket in Island  
    white subway tile shower walls  
    Shower Door with black trim  
    Expanded Driveway  
    Egress Window in Bonus Room  
    Farmhouse Plumbing Package  
    Garage Keypad  
    French Model Refrigerator  
    Amendment to increase price by $28,240  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  03.24.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  06.27.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Inspection (Slab) (1)  08.04.2022    
-- -- Inspection (Drain Tile) (0)  09.07.2022    
-- -- Inspection (Rough In HVAC) (1)  09.22.2022    
-- -- Inspection (Rough In Plumbing) (1)  10.05.2022    
-- -- Inspection (Rough In Electric) (1)  10.05.2022    
-- -- Inspection (Framing) (1) *   10.05.2022    
-- -- Inspection (Deck Piers) (0)  10.05.2022    
-- -- Inspection (Insulation) (1)  10.19.2022    
-- -- Inspection (Electric Service) (0)  01.10.2023    
-- -- Inspection (Main Sewer Line) (0)  12.08.2022    
-- -- Inspection (Main Water Line) (0)  12.08.2022    
-- -- Inspection (Final HVAC) (0)  01.16.2023    
-- -- Inspection (Final Plumbing) (0)  01.16.2023    
-- -- Inspection (Final Electric) (0)  01.16.2023    
-- -- Inspection (Final Building) (4) *   01.18.2023     Reinspect, Jan 18