Leave dining chandelier with extra chain so buyer can swag if need be. |
Tom will leave extra |
|
-- |
-- |
Soggy insulation |
|
|
-- |
-- |
|
|
|
-- |
-- |
Drywall on deck mildews the deck boards |
|
|
-- |
-- |
No shelving in master linen nook |
Joe |
|
-- |
-- |
O washer pan by buyer request |
|
|
-- |
-- |
No washer pan by buyer request |
Washer pan is in…. 1/11 |
|
-- |
-- |
Closet door near steps needed 12/28 |
Needs painted 1/1 |
|
-- |
-- |
Hoping to close by 1/31 at the latest |
|
|
-- |
-- |
fallen tree |
Tom |
|
-- |
-- |
No towel hanger behind toilet |
Joe. It’s installed 1/11 |
|
-- |
-- |
Must close by 1/31 at the latest! |
1/27 at 10:00 AM |
|
-- |
-- |
Paint closet door under steps |
Painter |
|
-- |
-- |
Oven may not fit? |
|
|
-- |
-- |
Needs mirrors |
All baths |
|
-- |
-- |
Lightbulbs needed basement |
|
|
-- |
-- |
Hole needs patching powder bath |
Painter |
|
-- |
-- |
Missing light in living room |
Electrician |
|
-- |
-- |
Pressure wash patio |
Bridges |
|
-- |
-- |
Missing snap lights upstairs hallway |
Electrician |
|
-- |
-- |
Trim needs patching outside of upstairs bedroom closest to banister |
Painter |
|
-- |
-- |
Handle into garage isn’t functional |
Joe |
|
-- |
-- |
Powder bath receptacle missing |
Electrician |
|
-- |
-- |
CODED LOCKBOX 0112 |
|
|
-- |
-- |
Door plugs |
Jill |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Paint front door |
Painter |
|
-- |
-- |
Few damaged doors 9blue tape) |
Painter |
|
-- |
-- |
Few cabinet blemishes (blue tape) |
Jill - touch up pen |
|
-- |
-- |
Paint on kitchen ceiling |
Painter |
|
-- |
-- |
Towel Bar to be secured in Bonus Bath |
Joe |
|
-- |
-- |
Paint Garage |
Painter |
|
-- |
-- |
HVAC closet- drywall hole |
Drywall |
|
-- |
-- |
Missing drywall Up Hallway |
Drywall. In process 1/28 |
|
-- |
-- |
Finish Final Clean |
Courtney |
|
-- |
-- |
Paint Touch Up Throughout |
Painter |
|
-- |
-- |
Paint bubble front door |
Painter |
|
-- |
-- |
Bonus window screen doesn’t fit |
Jill |
|
-- |
-- |
Clean all floors before Tuesday move-in |
Courtney |
|
-- |
-- |
Tenant: Devin, 540-233-7777 |
|
|
-- |
-- |
Leak above kitchen light |
|
|
-- |
-- |
Basement: Pop nail above the double door Several pop nails on the ceiling. |
Painter |
|
-- |
-- |
Basement:Dark line from around 4 feet of the ceiling light plus seam around 1.5 feet from this light. These are on the side further from the door. |
Painter |
|
-- |
-- |
n the hallway coming from the basement steps near the light switch is an odd spot in the drywall. |
Painter |
|
-- |
-- |
iving room: As you get to the top of the basement steps near the doorbell on the ceiling it needs to be sanded and painted. Someone painted a good size area but did not sand first. |
Painter |
|
-- |
-- |
Living Room:By the smoke detector at steps there is a seam showing. |
Painter |
|
-- |
-- |
Living Room: By the recessed light by the window there is a half dollar bad spot. |
Painter |
|
-- |
-- |
Living Room: At the steps there is a bad spot by the ceiling but on the wall. |
Painter |
|
-- |
-- |
Living Room:Recessed wall near window on the right looks black. Is this construction dirt or is it burning plastic? |
Painter |
|
-- |
-- |
Living Rom:Around 2 feet from the smoke detector there is a bad spot in drywall |
Painter |
|
-- |
-- |
Half Bath: Faucet is dripping and there is a pop nail behind the faucet. |
Painter, Plumber |
|
-- |
-- |
Kitchen lights – center recessed and pendant light on ceiling needs to be sanded and painted. |
Painter |
|
-- |
-- |
Trim leading in to half bath on outside has a nail coming through on right side. |
Painter |
|
-- |
-- |
Steps to top floor: Pop nail at base of steps on the ceiling |
Painter |
|
-- |
-- |
Bedroom 1 (Left): Walk across the floor and it creaks. |
Denny, Eric, Eagle |
|
-- |
-- |
Bedroom 1 left:Pop nail by light |
Painter |
|
-- |
-- |
Bedroom 1 left:Ceiling above window small crack and couple nail and bad spots |
Painter |
|
-- |
-- |
Bedroom 2: Floor is separating and has caused another bad spot in the board where it is sticking up. |
Denny |
|
-- |
-- |
Bedroom 2:Several popped nails in the ceiling |
Painter |
|
-- |
-- |
Bath 1 – Hallway Crack in ceiling above the vanity |
Painter |
|
-- |
-- |
Hall Bath-Spots of running paint above tub on wall and ceiling |
Painter |
|
-- |
-- |
Master Bedroom: Remote on wall fell out off. Can we use a better anchor or something to hold this on? Tenant has remote. |
Jill/Tom |
|
-- |
-- |
3rd floor f |
|
|
-- |
-- |
3rd floor has some squeaks in smaller rooms and master bedrooms |
Denny |
|
-- |
-- |
Ratified Contract? (0) 03.09.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 03.11.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 03.09.2022 |
|
|
-- |
-- |
Association Packet Received (0) 03.11.2022 |
|
|
-- |
-- |
Selections Meeting (0) 04.05.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 04.09.2022 |
4/8/2022: sent to Julie for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 04.21.2022 |
4/20/2022: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 04.20.2022 |
|
|
-- |
-- |
Building Permit (30) 07.05.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 08.04.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 05.03.2022 |
|
|
-- |
-- |
Stake Out Home (1) 03.24.2022 |
|
|
-- |
-- |
Excavate (2) 04.19.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 04.19.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 04.19.2022 |
|
|
-- |
-- |
Set Forms (2) 04.19.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 04.21.2022 |
|
|
-- |
-- |
Plumb Slab (2) 08.08.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 08.08.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.07.2022 |
|
|
-- |
-- |
Prepare Slab (1) 08.22.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 08.22.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.08.2022 |
|
|
-- |
-- |
Pour Slab (1) * 08.22.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 10.08.2022 |
|
|
-- |
-- |
Framing I (9) 08.22.2022 |
|
|
-- |
-- |
Order Steps (0) 09.01.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 06.20.2022 |
|
|
-- |
-- |
Framing II (8) 09.06.2022 |
|
|
-- |
-- |
Framing III (8) * 09.29.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 01.11.2024 |
|
|
-- |
-- |
Install Stairs (0) 10.03.2022 |
|
|
-- |
-- |
Windows & Doors (0) 10.03.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 10.24.2022 |
|
|
-- |
-- |
Roofing (0) 10.02.2022 |
|
|
-- |
-- |
Order Cabinets (0) 09.09.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
Standard |
|
-- |
-- |
Deck (0) 10.29.2022 |
Expanded 12 x 18 Deck |
|
-- |
-- |
Gutters (0) 01.21.2023 |
|
|
-- |
-- |
Driveway (0) 12.07.2022 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 10.29.2022 |
Expanded 10 x 10 Patio Below Deck |
|
-- |
-- |
Privacy Divider / Fence (0) 01.07.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 01.11.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 10.02.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1) 10.17.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.11.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 10.16.2022 |
In process 10/5 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 10.17.2022 |
|
|
-- |
-- |
Electric Rough In (4) 10.19.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 10.26.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.10.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 10.29.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 01.01.2023 |
|
|
-- |
-- |
Exterior Stone (0) 01.19.2023 |
Almost completed 11/18 |
|
-- |
-- |
Insulation (2) 10.26.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 11.03.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 01.10.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 04.11.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 12.19.2022 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 12.19.2022 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 12.08.2022 |
|
|
-- |
-- |
Drywall (Hang) (4) * 11.05.2022 |
Finish Bonus Room, Bath |
|
-- |
-- |
Loan Approval (0) 01.04.2023 |
|
|
-- |
-- |
Deed Preparation (0) 01.04.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 11.27.2022 |
In process11/19. Needs final sanding |
|
-- |
-- |
Paint 1 (1) 11.27.2022 |
|
|
-- |
-- |
Garage Door (0) 01.07.2023 |
|
|
-- |
-- |
House Numbers (0) 01.07.2023 |
|
|
-- |
-- |
Mailbox (0) 01.16.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 11.30.2022 |
11/28 |
|
-- |
-- |
Granite Installation (1) * 11.30.2022 |
11/29? |
|
-- |
-- |
Interior Trim - Install (3) 12.17.2022 |
In process 12/14 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 11.06.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 01.01.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 01.11.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 01.11.2023 |
In process. Base bath needs installed 1/7 |
|
-- |
-- |
Paint 2 (3) 01.01.2023 |
|
|
-- |
-- |
Cover Floors (1) 01.13.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 12.29.2022 |
|
|
-- |
-- |
Shoe Moulding (0) 01.14.2023 |
In process 1/11 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 01.18.2023 |
Black accessories, Bonus bath In process 1/11 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 01.18.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.29.2022 |
|
|
-- |
-- |
Set Water Meter (0) 01.16.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 01.18.2023 |
Black lighting. In process 1/14 |
|
-- |
-- |
Ceiling Fans (0) 01.18.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 01.14.2023 |
|
|
-- |
-- |
Blower Door Test (1) 11.06.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 01.14.2023 |
Black standard plumbing. In process 1/11 |
|
-- |
-- |
Install Appliances (0) * 01.14.2023 |
Delivery 10/24, Install 11/1 ( confirm with CJ) |
|
-- |
-- |
Paint 3 (2) * 01.01.2023 |
|
|
-- |
-- |
Carpet (2) 10.26.2022 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 01.26.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 01.23.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 01.23.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 01.23.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 01.26.2023 |
Mon, Jan 23 |
|
-- |
-- |
Pre Walk Through (0) 01.25.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 01.23.2023 |
In process 1/21 |
|
-- |
-- |
Cleaning (1) 01.26.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 01.26.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 01.26.2023 |
|
|
-- |
-- |
Schedule Closing (0) 01.26.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 01.26.2023 |
|
|
-- |
-- |
Payment for Upgrades (0) 01.26.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 01.23.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 01.26.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 01.26.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 01.24.2023 |
|
|
-- |
-- |
Closing (1) 01.28.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 02.06.2023 |
|
|