| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| LVP in Upstairs Hall and Bedrooms | ||||
| LVP Bonus Room | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Finished Bathroom | ||||
| Expanded 12 x 18 deck | ||||
| Expanded 10 x 10 Patio below deck | ||||
| White Kitchen Perimeter Cabinets | ||||
| Level III Granite Kitchen | ||||
| Cabinet Crown Moulding | ||||
| Three Drawer Base | ||||
| Double Waste Basket Island | ||||
| White Bathroom Cabinets | ||||
| Granite Level III Bathroom Countertops | ||||
| Oak Treads to Bedroom Level | ||||
| Eggshell Paint | ||||
| Expanded Driveway | ||||
| Garage Door keypad | ||||
| Amendment to increase price by $33,220 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 04.19.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 08.08.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 08.22.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.08.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 10.17.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 10.17.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 10.26.2022 | ||
| -- | -- | Inspection (Framing) (1) * 10.29.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 11.10.2022 | ||
| -- | -- | Inspection (Insulation) (1) 11.03.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 01.10.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 12.19.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 12.19.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 01.23.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 01.23.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 01.23.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 01.26.2023 | Mon, Jan 23 | |