| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| Finish Bonus Bath | ||||
| Expanded Deck 12 x 18 | ||||
| 10 x 10 patio under deck | ||||
| Painted white kitchen cabinetry | ||||
| Painted white bath cabinetry | ||||
| French Model Refrigerator | ||||
| Level 3 Quartz Countertops in Kitchen | ||||
| Roll Out Trays B 36, B18 | ||||
| Three drawer stack | ||||
| Double Waste Basket in Island | ||||
| Added cost for a GE French model fridge | ||||
| Amendment to increase price by $33,050 | ||||
| CRITICAL PATH | ||||
| Tue | Feb 3 | Inspection (Plumbing Under Slab) (1) 08.08.2022 | ||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus Room | ||||
| Expanded Driveway | ||||
| Main Level Crown Moulding | ||||
| Heavy Glass shower door with black trim | ||||
| Oak Stair to bedroom level | ||||
| Cabinet Crown Moulding | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.14.2025 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 09.15.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.08.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 10.17.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 10.17.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 10.22.2022 | ||
| -- | -- | Inspection (Framing) (1) * 10.22.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 11.10.2022 | ||
| -- | -- | Inspection (Insulation) (1) 10.29.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 12.14.2025 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 12.19.2022 | ||
| -- | -- | Inspection (Main Water Line) (0) 12.19.2022 | ||
| -- | -- | Inspection (Final HVAC) (0) 01.18.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 01.18.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 01.18.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 01.18.2023 | Tue, Jan 17 | |