1 28 33 37 45 46 47 48 71 52 70 69 67 53 54 55 56 59 58 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 109  ::  1431 Palomino Trail
[ BUILD: 20221348 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
Fri    Sep 20      Verify Window & Roof Structure (0)      
Fri    Sep 20      Rough In Microwave Vent (0)      
Fri    Sep 20      Blower Door Test (1)      
--   --   Dimmer Switch LR Lights- Because we Love Suzanne Trow!!!
--   --   Home Sale Contingency Settlement Deadline = Sept 30
--   --   Master bath vanity not installed 12/17
--   --   Broken master bath vanity 12/28 Cultured marble top is broken - Kate will order it again
--   --   FLOORING AND PAINT COLOR TBD BY BUYER
--   --   broken vanity still on site-as well as a few single cultured marble tops in kitchen
--   --   Extra ceiling fans on site? I don’t see them 2/4 Electrician
--   --   Powder mirror needed Joe
--   --   Black shower drain needed Plumber
--   --   All ceiling fans needed-3 Electrician. Living room done
--   --   All bulbs needed Electrician
--   --   CODED LOCKBOX 0109 Attach a vinyl ring to deck post
--   --   Siding/awning needs attention Trim house wrap - Tom. Needs done 3/5
--   --   Damaged transition strip Landing at 2nd level hallway still needs replacing
--   --   Why was a shower door installed? Please let Scott know
--   --   Should the floors be covered?
--   --   Weatherstripping needed on exterior doors? Courtney - please confirm. All doors need it.
--   --   Tub repair Jill. In process 3/1
--   --   Weatherstripping needed front door
--   --   Clean out garage. This one is most packed Tom
--   --   Transition strip needed replaced on upper stairs too 3/20- looks good to Kate
--   --   Attic cover needed Painter
--   --   Owners on site mentioning small bedroom fans are reall large
--   --   Touch up spot bath fan Painter
--   --   Flip fans blades living room Electrician
--   --   Flip fans blades living room
--   --   Garage trim needed Weatherstripping - Jeff, Davenport
--   --   Pressure wash all patios Bridges
--   --   Interest Rate Lock expires March 19 Can we close before that time?
--   --   Patio door needs weatherstripping Jill
--   --   Garage door trim PVC board, Davenport
--   --   Remove broken hot water heater Tom, Northeastern
--   --   Ceiling in garage needs patched (near where wire hangs) I think this was repaired (see pic)
--   --   Flooring is chipped near transition strips? Jill
--   --   Spicket casing needs installed (exterior)
--   --   Crack in drywall of master bedroom ceiling Painter
--   --   Screens Jill
--   --   Put patio transition board in place Tom
--   --   Clean off back patio Court
--   --   Several nail holes in shoe to be filled In island - Jill
--   --   Push range in place
--   --   Missing vent cover living room floor Jill
--   --   Is there poly on stairs??? Painter
--   --   Closet doors in upstairs bedrooms to be adjusted Jill
--   --   Drywall glue on master shower wall to be removed Court
--   --   Master bedroom light not coming on
--   --   Clean off deck Court
--   --   Clean out garage Court
--   --   Clean dust off kitchen handles Court
--   --   Remove paint from all hinges handles and brackets Painter
--   --   Sand and repaint the tray ceiling Painter
--   --   Install master shower rod Joe- Tuesday morning
--   --   Adjust water pressure Jill
--   --   Fill nail holes at shoe for master and hall vanities Jill
--   --   Several vinyl issues at bump out window Greg
--   --   Adjust garage door Greg
--   --   Front door 1/4 inch off Tom, Domingo
--   --   Repaint closet under stairs Painter
--   --   Crack on handrail at the top of the steps Painter
--   --   Repaint garage Painter
--   --   Mop out garage floor Court
--   --   Raise pendant lights 8 inches Electrician
--   --   Move electric outlet installed on floor of cabinet to the side of the cabinet under the kitchen sink Electrician
--   --   Replace stair transition going up stairs
--   --   Remove hot water heater Tom
--   --   Attach a vinyl ring to deck post
--   --   Attach a vinyl ring to deck post
--   --   School bus will not come down to Palomino until VDOT signs off on the road 8/23: RCPS Transportation will call VDOT to ask if the road is approved
--   --   Grass issue out back, turning black due to no sunlight back there (owner wants stones instead) Kate will take a look
--   --   The placement of her bedroom closet light switch, can we have electricians move it for her? Jill will coordinate
--   --   Board on deck needs replaced
--   --   Move receptacle under kitchen sink
--   --   Adjust the water pressure some more
--   --   PVC on both sides of the garage door is bowing
--   --   Transition strip on first landing needs replaced Denny
--   --   Screen door needs replaced
--   --   Siding on master bump out needs fixed in the corners
--   --   Black aluminum needs replaced at the front door Davenport. Repairing 10/18
--   --   Front door needs fixed and painted
-- -- Ratified Contract? (0)  07.29.2022    
-- -- $2500 Deposit Received (0)  08.08.2022    
-- -- Association Packet Requested (0)  07.29.2022    
-- -- Association Packet Received (0)  07.30.2022    
-- -- Selections Meeting (0)  08.29.2022    
-- -- Selections Sheet Signed (0)  09.11.2022     8/29/2022: sent to Nicole for review
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  10.01.2022     9/30/2022: sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  09.30.2022    
-- -- Building Permit (30)  07.20.2022    
-- -- Order Roof & Floor Trusses (1)  08.29.2022    
-- -- Order Windows & Doors (0)  09.08.2022    
-- -- Stake Out Home (1)  07.28.2022    
-- -- Excavate (2)  09.01.2022    
-- -- Inspection (Footers) (1)  09.01.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1)  09.01.2022    
-- -- Set Forms (2)  09.06.2022    
-- -- Pour Foundation Walls (1)  09.06.2022    
-- -- Plumb Slab (2)  09.01.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.06.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  09.06.2022    
-- -- Inspection (Slab) (1)  09.06.2022    
-- -- Inspection (Drain Tile) (0)  09.08.2022    
-- -- Pour Slab (1)  09.06.2022    
-- -- Settlement Agent Confirmed (0)  10.08.2022    
-- -- Framing I (9)  09.29.2022    
-- -- Order Steps (0)  10.10.2022    
-- -- Order Tubs / Showers (0)  10.10.2022    
-- -- Framing II (8)  10.09.2022    
-- -- Framing III (8)  10.20.2022    
-- -- Install Stairs (0)  10.29.2022    
-- -- Windows & Doors (0)  10.29.2022    
-- -- House Number and Status in Window (0)  12.10.2022    
-- -- Roofing (0)  10.29.2022    
-- -- Order Cabinets (0)  10.07.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  10.29.2022     Expanded 12 x 18 Deck
-- -- Gutters (0)  02.06.2023    
-- -- Driveway (0)  12.28.2022     Expanded Driveway
-- -- Patio (0)  12.07.2022     Expanded 10 x 10 Patio Below Deck
-- -- Privacy Divider / Fence (0)  02.04.2023     privacy panel up-needs deck railings
-- -- Sod / Seed / Landscaping (0)  03.01.2023    
-- -- HVAC Rough In (4)  10.29.2022     In process 10/26
-- -- Inspection (Rough In HVAC) (1)  11.07.2022    
-- -- Plumbing Rough In (4)  11.09.2022     In process 11/2
-- -- Inspection (Rough In Plumbing) (1)  11.10.2022    
-- -- Electric Rough In (4)  11.16.2022     In process (almost complete) 11/12
-- -- Inspection (Rough In Electric) (1)  11.16.2022    
-- -- Inspection (Deck Piers) (0)  11.10.2022    
-- -- Inspection (Framing) (1)  11.16.2022    
-- -- Exterior Vinyl (0)  01.28.2023    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2)  11.16.2022    
-- -- Inspection (Insulation) (1)  11.21.2022    
-- -- Inspection (Electric Service) (0)  03.08.2023    
-- -- Set Electric Meter (0)  04.06.2023    
-- -- Inspection (Main Sewer Line) (0)  01.23.2023    
-- -- Inspection (Main Water Line) (0)  01.23.2023    
-- -- Order Interior Doors & Trim (0)  12.08.2022    
-- -- Drywall (Hang) (4)  11.27.2022     NONE
-- -- Loan Approval (0)  02.06.2023    
-- -- Deed Preparation (0)  01.31.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6)  12.10.2022     In process 12/7
-- -- Paint 1 (1)  12.10.2022    
-- -- Garage Door (0)  02.22.2023    
-- -- House Numbers (0)  02.22.2023     Missing 1 number
-- -- Mailbox (0)  02.09.2023    
-- -- Cabinet Installation (2)  12.17.2022     Dec 15. On site 12/14
-- -- Granite Installation (1)  12.27.2022    
-- -- Interior Trim - Install (3)  01.07.2023     In process 1/1
-- -- Order Plumbing / Lighting Fixtures (0)  08.10.2023    
-- -- Interior Trim - Paint (1)  01.14.2023    
-- -- Luxury Vinyl Plank (3)  01.28.2023     In process 1/25
-- -- Luxury Vinyl Tile (0)  01.25.2023    
-- -- Paint 2 (3)  01.28.2023     In process 1/11
-- -- Cover Floors (1)  02.01.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  01.16.2023    
-- -- Shoe Moulding (0)  02.01.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  02.08.2023     Black accessories, Bonus bath. Mirrors are up 2/4
-- -- Install Coded Lockbox (add extra keys) (0)  02.15.2023    
-- -- Pay Water / Sewer Taps (0)  01.10.2023    
-- -- Set Water Meter (0)  01.23.2023    
-- -- Electric Trim Out (3)  02.11.2023     Black Standard. Just need ceiling fans 2/8
-- -- Ceiling Fans (0)  02.04.2023    
-- -- HVAC Trim Out (1)  02.18.2023    
-- -- Plumbing Trim Out (2)  02.04.2023     Black Standard. In process 2/1
-- -- Install Appliances (0)  02.04.2023     Delivery 10/31- Schedule install with CJ
-- -- Paint 3 (2)  01.28.2023    
-- -- Carpet (2)  11.14.2022    
-- -- Appraiser Confirms Construction Completion (0)  03.23.2023     Randy, Colonial
-- -- Inspection (Final HVAC) (1)  03.21.2023    
-- -- Inspection (Final Plumbing) (1)  03.21.2023    
-- -- Inspection (Final Electric) (1)  03.21.2023    
-- -- Inspection (Final Building) (2)  03.21.2023    
-- -- Pre Walk Through (0)  03.18.2023    
-- -- Stain Hardwood Stairs (1)  02.15.2023    
-- -- Cleaning (1)  03.21.2023    
-- -- Certificate of Occupancy (1)  03.21.2023    
-- -- C.O. to Lender (0)  03.21.2023    
-- -- Schedule Closing (0)  03.23.2023    
-- -- Buyer Walk Through (1)  03.21.2023    
-- -- Payment for Upgrades (0)  03.05.2023    
-- -- Keys to Settlement Agent (0)  03.05.2023    
-- -- Review Settlement Statement (0)  03.23.2023    
-- -- Jerry Signs Closing Documents (0)  03.10.2023    
-- -- Request Trash Tote From POA Manager (0)  03.18.2023    
-- -- Closing (1)  03.24.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  03.27.2023