| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| White Kitchen Cabinetry-perimeter | ||||
| Eggshell Paint | ||||
| LVP Entire Upstairs | ||||
| Stained hardwood Treads to Bedroom Level | ||||
| Expanded Deck 12 x 18 | ||||
| Expanded Driveway | ||||
| Add ceiling fans in up 2 bedrooms and LR | ||||
| Digital Deadbolt | ||||
| Garage Door Opener Keypad | ||||
| Amendment to increase price by $11,060 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 09.01.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 09.06.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.07.2022 | ||
| -- | -- | Inspection (Slab) (1) 09.06.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.08.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 11.07.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 11.10.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 11.16.2022 | ||
| -- | -- | Inspection (Framing) (1) * 11.16.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 11.10.2022 | ||
| -- | -- | Inspection (Insulation) (1) 11.21.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 03.08.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 01.23.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 01.23.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 03.21.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 03.21.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 03.21.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 03.21.2023 | ||