37 ADDR
CONGERS-2 - 110  ::  1427 Palomino Trail
[ BUILD: 20221347 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
    LVP Up hallway ($1100) and Bonus Room ($1520)  
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
    Order Plumbing / Lighting Fixtures (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Paint 1 i process 12/7
Patch concrete hole in base bath
Waiting on farmhouse sink Fred. In kitchen floor
Awning looks slightly bent? Tom, Jeremy, Davenport
Patch holes in all garage trim PVC Board, Davenport
Garage keypad Davenport-after garage trim is repaired
Cover carpet Need to cover carpet
CODED LOCKBOX 0110
Push oven in place Tom
Dent in Refrigerator Kate has alerted Leisa
Replace deadbolt as paint has been rubbed off? Joe
Bonus bath light fixture needed Electrician
Receptacles needed in island Electrician
Needs all lightbulbs Electrician
Drywall repair in bonus bath Drywall. Needs painting 2/22
Receptacles not centered
Powder bath receptacle needed Electrician
Small holes to patch powder bath Painter
Wall touch up paint needed Painter
Cable box covers needed in all units Low voltage panels in garage - Tom
Fill screw holes at French door Jill
Pantry support missing on support rod Joe
Upstairs closet doors to be adjusted Jill
Floor squeak at the top of first set of steps in hallway between kitchen and living room Denny
Fill screw holes at front door Jill
Remove construction debris off bonus room door Jill
Range in garage unprotected??? Yikes Kate will talk to CJ
Range in garage unprotected??? Yikes
Weatherstripping back patio Jill
Electric cover needed in garage Jill
Weatherstripping back door Jill
Cabinet chip back of cabinet next to microwave Tom? Fred?
Trim on either side of farm sink Tom?
Clea paint off handles, knobs, etc.
Clean paint off handles, knobs, etc Painter
Hall bath fan to be fixed to ceiling with paint touch up Electrician
nick in master shower Jill. Likely fixed 3/22
Bonus Bath- clean paint off kicjkplate
Bonus Bath- clean paint off kickplate Painter
Paint Touch Up Throughout Painter. In process 3/22
Repaint garage Painter
Several outlets to be straigtened- marked wiht blue tape Electrician
Moulding on both sides of farm sink Fred is aware and has the owners contact info
Drywall patch and paint 3/30 - waiting to get in, coordinating with owner
UPGRADES - COMPLETED
    Finished Bonus Room  
    Finished Bonus Bath  
    Expanded Driveway  
    Expanded Deck 12 x 18  
    White Kitchen Cabinets  
    Double Waste Basket Island  
    Roll Out Trays Pantry  
    Cabinet Crown Moulding  
    Three Drawer Stack  
    Farmhouse Sink  
    Shower Door with black trim  
    Garage Keypad  
    Oak Treads to Bedroom Level  
    Farmhouse Plumbing Package  
    Amendment to increase price by $29,770  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  03.27.2022    
-- -- $2500 Deposit Received (0)  03.30.2022    
-- -- Association Packet Requested (0)  03.27.2022    
-- -- Association Packet Received (0)  04.02.2022    
-- -- Selections Meeting (0)  04.05.2022    
-- -- Selections Sheet Signed (0)  04.29.2022    
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  06.07.2022     6/7/2022: sent to Jerry for signatures
-- -- Deposit For Upgrades Received (0)  06.07.2022    
-- -- Building Permit (30) *   07.20.2022    
-- -- Order Roof & Floor Trusses (1)  08.29.2022    
-- -- Order Windows & Doors (0)  09.08.2022    
-- -- Stake Out Home (1)  07.28.2022    
-- -- Excavate (2)  09.01.2022    
-- -- Inspection (Footers) (1)  09.01.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1) *   09.01.2022    
-- -- Set Forms (2)  09.06.2022    
-- -- Pour Foundation Walls (1)  09.06.2022    
-- -- Plumb Slab (2)  09.01.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.06.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.07.2022    
-- -- Prepare Slab (1)  09.06.2022    
-- -- Inspection (Slab) (1)  09.06.2022    
-- -- Inspection (Drain Tile) (0)  09.08.2022    
-- -- Pour Slab (1) *   09.06.2022    
-- -- Settlement Agent Confirmed (0)  04.02.2022    
-- -- Framing I (9)  09.29.2022    
-- -- Order Steps (0)  10.10.2022    
-- -- Order Tubs / Showers (0)  10.10.2022    
-- -- Framing II (8)  10.09.2022    
-- -- Framing III (8) *   10.20.2022    
-- -- Install Stairs (0) *   10.29.2022    
-- -- Windows & Doors (0) *   10.29.2022    
-- -- House Number and Status in Window (0)  12.10.2022    
-- -- Roofing (0) *   10.29.2022    
-- -- Order Cabinets (0)  10.11.2022    
-- -- Order Appliances (0)  08.30.2022     Standard
-- -- Deck (0)  10.29.2022     Expanded 12 x 18 Deck
-- -- Gutters (0)  02.06.2023    
-- -- Driveway (0) *   12.28.2022     Expanded Driveway
-- -- Patio (0)  12.07.2022     Standard
-- -- Privacy Divider / Fence (0) *   02.04.2023     privacy panel up-needs deck railings
-- -- Sod / Seed / Landscaping (0)  03.01.2023    
-- -- HVAC Rough In (4)  11.02.2022     In process10/29
-- -- Plumbing Rough In (4)  11.02.2022    
-- -- Electric Rough In (4)  11.09.2022     In process 11/5
-- -- Inspection (Rough In HVAC) (1)  11.07.2022    
-- -- Inspection (Rough In Plumbing) (1)  11.10.2022    
-- -- Inspection (Rough In Electric) (1)  11.10.2022    
-- -- Inspection (Framing) (1) *   11.10.2022    
-- -- Inspection (Deck Piers) (0)  11.10.2022    
-- -- Exterior Vinyl (0) *   01.28.2023    
-- -- Exterior Stone (0)  04.14.2022    
-- -- Insulation (2) *   11.12.2022    
-- -- Inspection (Insulation) (1)  11.17.2022    
-- -- Inspection (Electric Service) (0)  03.08.2023    
-- -- Set Electric Meter (0) *   04.06.2023    
-- -- Inspection (Main Sewer Line) (0)  01.23.2023    
-- -- Inspection (Main Water Line) (0)  01.23.2023    
-- -- Order Interior Doors & Trim (0)  12.08.2022    
-- -- Drywall (Hang) (4) *   11.27.2022     Bonus Room, Bath. Stocked 11/19
-- -- Loan Approval (0)  01.31.2023    
-- -- Deed Preparation (0)  01.31.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   12.07.2022     In process11/27
-- -- Paint 1 (1)  12.10.2022    
-- -- Garage Door (0)  01.28.2023    
-- -- House Numbers (0)  02.15.2023     Jill
-- -- Mailbox (0)  02.09.2023    
-- -- Cabinet Installation (2) *   12.17.2022     Dec 14. In process 12/14
-- -- Granite Installation (1) *   01.28.2023     Jan 27
-- -- Interior Trim - Install (3) *   01.07.2023     In process 1/1
-- -- Interior Trim - Paint (1)  01.07.2023    
-- -- Luxury Vinyl Plank (3) *   01.21.2023     In process 1/18
-- -- Luxury Vinyl Tile (0)  01.14.2023    
-- -- Paint 2 (3)  01.07.2023    
-- -- Cover Floors (0)  01.28.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  01.16.2023    
-- -- Shoe Moulding (0)  01.25.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   02.08.2023     Few knobs needed in basement. In process 2/4
-- -- Install Coded Lockbox (add extra keys) (0)  02.01.2023    
-- -- Pay Water / Sewer Taps (0)  01.10.2023    
-- -- Set Water Meter (1) *   01.23.2023    
-- -- Electric Trim Out (3) *   02.11.2023     Black Standard. In process 2/8
-- -- Ceiling Fans (0)  02.08.2023    
-- -- HVAC Trim Out (1) *   02.18.2023    
-- -- Plumbing Trim Out (2) *   01.28.2023     Farmhouse Plumbing Black. In process 1/25
-- -- Install Appliances (0) *   02.08.2023     Delivery 10/31- Schedule install with CJ
-- -- Paint 3 (2) *   01.11.2023    
-- -- Carpet (2)  01.21.2023     In process 1/14
-- -- Appraiser Confirms Construction Completion (0)  03.23.2023     Joe Chadwell, 3/15
-- -- Inspection (Final HVAC) (0)  03.22.2023    
-- -- Inspection (Final Plumbing) (0)  03.22.2023    
-- -- Inspection (Final Electric) (0)  03.22.2023    
-- -- Inspection (Final Building) (4) *   03.22.2023    
-- -- Pre Walk Through (0)  03.18.2023    
-- -- Stain Hardwood Stairs (1) *   02.11.2023     In process 2/8
-- -- Cleaning (1)  03.22.2023     In process 3/1
-- -- Certificate of Occupancy (1) *   03.22.2023    
-- -- C.O. to Lender (0)  03.22.2023    
-- -- Schedule Closing (0)  03.23.2023    
-- -- Buyer Walk Through (1) *   03.22.2023     Monday, Mar 20, 4 PM
-- -- Payment for Upgrades (0)  03.05.2023    
-- -- Keys to Settlement Agent (0)  03.03.2023    
-- -- Review Settlement Statement (0)  03.23.2023    
-- -- Jerry Signs Closing Documents (0)  03.10.2023    
-- -- Request Trash Tote From POA Manager (0)  03.18.2023    
-- -- Closing (1)  03.27.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  03.27.2023