Buyer is asking if he can fence his yard |
|
|
-- |
-- |
USDA loan - closing approx 20 days after completion |
|
|
-- |
-- |
H/w treadsto 2nd level |
|
|
-- |
-- |
Vented microwave |
|
|
-- |
-- |
Replacesoaked insulation (kitchen) |
|
|
-- |
-- |
Patio larger..I think? |
|
|
-- |
-- |
Paint 1 closet door |
Painter |
|
-- |
-- |
Wants to know if the expanded driveway can be expanded further |
Kozhin emailed Scott |
|
-- |
-- |
Drywall repair near thermostat |
Painter |
|
-- |
-- |
Possibly broken light over k island |
Electrician - on order |
|
-- |
-- |
Outlet cover needed master bath |
Electrician. And hall bath |
|
-- |
-- |
Hall bath cover needed |
Master bedroom also |
|
-- |
-- |
Outdoor front outlet needed |
|
|
-- |
-- |
Mirrors needed |
Joe |
|
-- |
-- |
Trim all garages |
Trim |
|
-- |
-- |
CODED LOCKBOX 2424 |
|
|
-- |
-- |
Drain needed in hall bath? Covered in green plastic. |
Plumber |
|
-- |
-- |
Drywall repair needed powder bath |
Painter |
|
-- |
-- |
White boards needed on all back patios |
Tom |
|
-- |
-- |
Garage door trim needed |
Davenport |
|
-- |
-- |
Missing snap light living room |
Electrician |
|
-- |
-- |
Thermostat |
HVAC |
|
-- |
-- |
Loose front shingles |
Davenport |
|
-- |
-- |
Needs mailboxes- post is set |
Tom |
|
-- |
-- |
Broken snap light in kitchen |
Electrician |
|
-- |
-- |
|
|
|
-- |
-- |
HVAC cover needed in kitchen |
Jill |
|
-- |
-- |
Mailbox numbers needed |
Jill |
|
-- |
-- |
Plugs for screw holes needed |
Jill |
|
-- |
-- |
Adjust closet doors |
Jill |
|
-- |
-- |
Plug all screw holes in doors |
|
|
-- |
-- |
Adjust closet doors |
|
|
-- |
-- |
A hand rail to upper level needs to be bracketed at the very bottom |
|
|
-- |
-- |
Attic access needed |
Painter or Jill |
|
-- |
-- |
Clean off vertical trim on island- ( Can we clean or does it need to be replaced) |
|
|
-- |
-- |
Escutcheon behind pedestal sink to be adjusted or looked at something is wonky |
|
|
-- |
-- |
Shelving needed |
Joe |
|
-- |
-- |
Test |
Jill |
|
-- |
-- |
Jill, this is where the ceiling fan is in the garage. |
|
|
-- |
-- |
Push attic cover into place |
Jill |
|
-- |
-- |
Push powder bath fan into place |
Jill or Tom |
|
-- |
-- |
Microwave vent not working |
Tom or CJ |
|
-- |
-- |
This laundry room needs a cover for the hot and cold water spouts as well |
Trim drywall, Tom |
|
-- |
-- |
|
|
|
-- |
-- |
HVAC cover needed in dining room |
Register |
|
-- |
-- |
Dining chandelier to be raised 6 inches to match the height of the pendant lights |
Electrician |
|
-- |
-- |
Plugs for screw hole covers in all doors |
Jill |
|
-- |
-- |
Powder bath mirror crooked and to be adjusted |
Joe |
|
-- |
-- |
Adjust closet doors upstairs |
Jill |
|
-- |
-- |
Put insulation back and attic and place attic cover |
Painter |
|
-- |
-- |
Remove large sticker from shower drain |
Jill |
|
-- |
-- |
Remove final items from garage |
Jill |
|
-- |
-- |
Paint touch up |
Painter |
|
-- |
-- |
Dented microwave |
CJ and Leisa |
|
-- |
-- |
Plus’s in French doors |
Jill |
|
-- |
-- |
Clean garage |
Jill |
|
-- |
-- |
Sweep back patio |
Jill |
|
-- |
-- |
Weather stripping garage door |
Jill |
|
-- |
-- |
missing a towel ring in the guest bathroom |
Joe is aware and bringing one to put up on 4/10 |
|
-- |
-- |
Ceiling Cracks There is a noticeable crack between the drywall and the ceiling that has emerged, posing concerns for the structural integrity of the property. I have reported this issue to Tim for further assessment |
Drywaller |
|
-- |
-- |
Shower Wall Stability, Additionally, I have discovered an issue with the stability of the shower wall. Upon pressing, the bricks appear to move, indicating a potential structural Problem??? |
Jill |
|
-- |
-- |
Flooring issues waiting on Eric |
Eric / Denny |
|
-- |
-- |
Ratified Contract? (0)
03.31.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0)
04.01.2022 |
|
|
-- |
-- |
Association Packet Requested (0)
03.31.2022 |
|
|
-- |
-- |
Association Packet Received (0)
04.02.2022 |
|
|
-- |
-- |
Selections Meeting (0)
05.24.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0)
06.27.2022 |
6/16/2022: sent to Kozhin |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
07.24.2022 |
6/26/2022: sent to Kozhin for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0)
07.24.2022 |
|
|
-- |
-- |
Building Permit (30)
07.22.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
09.08.2022 |
|
|
-- |
-- |
Order Windows & Doors (0)
09.08.2022 |
|
|
-- |
-- |
Stake Out Home (1)
07.28.2022 |
|
|
-- |
-- |
Excavate (2)
08.08.2022 |
|
|
-- |
-- |
Inspection (Footers) (1)
08.08.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
09.07.2022 |
|
|
-- |
-- |
Pour Footers (1)
08.08.2022 |
|
|
-- |
-- |
Set Forms (2)
08.15.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1)
08.15.2022 |
|
|
-- |
-- |
Plumb Slab (2)
09.06.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
09.06.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
09.08.2022 |
|
|
-- |
-- |
Prepare Slab (1)
09.06.2022 |
|
|
-- |
-- |
Inspection (Slab) (1)
09.08.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
10.10.2022 |
|
|
-- |
-- |
Pour Slab (1)
09.12.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
01.31.2023 |
|
|
-- |
-- |
Framing I (9)
09.29.2022 |
|
|
-- |
-- |
Order Steps (0)
10.10.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0)
10.10.2022 |
Gray Shower Panel Walls |
|
-- |
-- |
Framing II (8)
10.09.2022 |
|
|
-- |
-- |
Framing III (8)
10.17.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
04.08.2024 |
Flooring issues waiting on Eric? |
|
-- |
-- |
Install Stairs (0)
11.19.2022 |
|
|
-- |
-- |
Windows & Doors (0)
11.19.2022 |
|
|
-- |
-- |
House Number and Status in Window (0)
11.30.2022 |
|
|
-- |
-- |
Roofing (0)
11.19.2022 |
|
|
-- |
-- |
Order Cabinets (0)
11.22.2022 |
|
|
-- |
-- |
Order Appliances (0)
08.30.2022 |
French Upgrade |
|
-- |
-- |
Deck (0)
11.19.2022 |
Standard |
|
-- |
-- |
Gutters (0)
03.05.2023 |
|
|
-- |
-- |
Driveway (0)
02.08.2023 |
Expanded Driveway |
|
-- |
-- |
Patio (0)
01.01.2023 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0)
02.04.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
04.23.2023 |
In process 4/12 |
|
-- |
-- |
HVAC Rough In (4)
03.01.2023 |
In process 11/2 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
12.03.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
04.08.2024 |
|
|
-- |
-- |
Plumbing Rough In (4)
11.16.2022 |
In process 11/12. Almost completed |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
12.03.2022 |
|
|
-- |
-- |
Electric Rough In (4)
11.19.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
12.03.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
11.30.2022 |
|
|
-- |
-- |
Inspection (Framing) (1)
12.03.2022 |
|
|
-- |
-- |
Exterior Vinyl (0)
02.11.2023 |
|
|
-- |
-- |
Exterior Stone (0)
02.22.2023 |
In process 2/18 |
|
-- |
-- |
Insulation (2)
12.08.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1)
12.03.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
04.06.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
04.20.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
02.13.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
02.13.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
12.08.2022 |
|
|
-- |
-- |
Drywall (Hang) (4)
12.10.2022 |
NONE |
|
-- |
-- |
Loan Approval (0)
03.05.2023 |
|
|
-- |
-- |
Deed Preparation (0)
03.05.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
01.04.2023 |
In process 1/1 |
|
-- |
-- |
Paint 1 (1)
01.04.2023 |
|
|
-- |
-- |
Garage Door (0)
02.22.2023 |
|
|
-- |
-- |
House Numbers (0)
03.01.2023 |
|
|
-- |
-- |
Mailbox (0)
02.20.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
01.07.2023 |
Jan 6 |
|
-- |
-- |
Granite Installation (1)
01.14.2023 |
|
|
-- |
-- |
Interior Trim - Install (3)
01.25.2023 |
In process 1/21 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
04.08.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1)
01.28.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
02.11.2023 |
In process 2/8 |
|
-- |
-- |
Luxury Vinyl Tile (0)
02.11.2023 |
|
|
-- |
-- |
Paint 2 (3)
01.18.2023 |
|
|
-- |
-- |
Cover Floors (1)
02.11.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
02.13.2023 |
|
|
-- |
-- |
Shoe Moulding (0)
02.22.2023 |
In process 2/11 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
04.05.2023 |
Needs shelving 4/1 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
03.01.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
02.16.2023 |
|
|
-- |
-- |
Set Water Meter (0)
03.16.2023 |
|
|
-- |
-- |
Electric Trim Out (3)
02.18.2023 |
Standard Brushed Nickel in process 2/15 |
|
-- |
-- |
Ceiling Fans (0)
02.25.2023 |
|
|
-- |
-- |
HVAC Trim Out (1)
03.05.2023 |
Needed 3/1 |
|
-- |
-- |
Blower Door Test (1)
04.08.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2)
02.22.2023 |
Standard Brushed Nickel. In process 2/18 |
|
-- |
-- |
Install Appliances (0)
03.05.2023 |
Delivery 10/31- Schedule install with CJ |
|
-- |
-- |
Paint 3 (2)
01.28.2023 |
|
|
-- |
-- |
Carpet (2)
02.11.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
06.21.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
04.25.2023 |
Mon, Apr 24 |
|
-- |
-- |
Inspection (Final Plumbing) (1)
04.25.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
04.25.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
04.25.2023 |
|
|
-- |
-- |
Pre Walk Through (0)
04.24.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
02.25.2023 |
In process 2/22 |
|
-- |
-- |
Cleaning (1)
04.26.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1)
04.25.2023 |
|
|
-- |
-- |
C.O. to Lender (0)
04.25.2023 |
|
|
-- |
-- |
Schedule Closing (0)
06.21.2023 |
|
|
-- |
-- |
Buyer Walk Through (1)
04.27.2023 |
Wed, Apr 26 at 2:00 PM |
|
-- |
-- |
Payment for Upgrades (0)
03.05.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
04.20.2023 |
|
|
-- |
-- |
Review Settlement Statement (0)
06.21.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
06.22.2023 |
Amar, Fri, June 23 |
|
-- |
-- |
Request Trash Tote From POA Manager (0)
04.20.2023 |
|
|
-- |
-- |
Closing (1)
06.29.2023 |
Brittany @ West View Title, Friday, June 23 |
|
-- |
-- |
Remove Coded Lockbox (0)
06.29.2023 |
|
|