CONGERS-2 - 24  ::  1436 Palomino Trail
[ BUILD: 20221384 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
Patio larger..I think?
Paint 1 closet door Painter
UPGRADES
    Trash Pull Out ($470) Three Drawer Stack ($390) Spice Rack ($310)  
    Gray Shower Panel Walls- Master Shower  
    Oak Stair system to bedroom level  
    LVP Up hallway  
    Level III Quartz- like model  
    Amendment to increase price by $15,600  
CRITICAL PATH
Tue    Feb 3      Pour Slab (1) *   09.12.2022    
    Windows & Doors (0) *   11.19.2022    
    Sod / Seed / Landscaping (0)  04.23.2023     In process 4/12
Wed    Feb 4      Luxury Vinyl Plank (3) *   02.11.2023     In process 2/8
TO DO - COMPLETED OR DELETED
Buyer is asking if he can fence his yard
USDA loan - closing approx 20 days after completion
H/w treadsto 2nd level
Vented microwave
Replacesoaked insulation (kitchen)
Wants to know if the expanded driveway can be expanded further Kozhin emailed Scott
Drywall repair near thermostat Painter
Possibly broken light over k island Electrician - on order
Outlet cover needed master bath Electrician. And hall bath
Hall bath cover needed Master bedroom also
Outdoor front outlet needed
Mirrors needed Joe
Trim all garages Trim
CODED LOCKBOX 2424
Drain needed in hall bath? Covered in green plastic. Plumber
Drywall repair needed powder bath Painter
White boards needed on all back patios Tom
Garage door trim needed Davenport
Missing snap light living room Electrician
Thermostat HVAC
Loose front shingles Davenport
Needs mailboxes- post is set Tom
Broken snap light in kitchen Electrician
HVAC cover needed in kitchen Jill
Mailbox numbers needed Jill
Plugs for screw holes needed Jill
Adjust closet doors Jill
Plug all screw holes in doors
Adjust closet doors
A hand rail to upper level needs to be bracketed at the very bottom
Attic access needed Painter or Jill
Clean off vertical trim on island- ( Can we clean or does it need to be replaced)
Escutcheon behind pedestal sink to be adjusted or looked at something is wonky
Shelving needed Joe
Test Jill
Jill, this is where the ceiling fan is in the garage.
Push attic cover into place Jill
Push powder bath fan into place Jill or Tom
Microwave vent not working Tom or CJ
This laundry room needs a cover for the hot and cold water spouts as well Trim drywall, Tom
HVAC cover needed in dining room Register
Dining chandelier to be raised 6 inches to match the height of the pendant lights Electrician
Plugs for screw hole covers in all doors Jill
Powder bath mirror crooked and to be adjusted Joe
Adjust closet doors upstairs Jill
Put insulation back and attic and place attic cover Painter
Remove large sticker from shower drain Jill
Remove final items from garage Jill
Paint touch up Painter
Dented microwave CJ and Leisa
Plus’s in French doors Jill
Clean garage Jill
Sweep back patio Jill
Weather stripping garage door Jill
missing a towel ring in the guest bathroom Joe is aware and bringing one to put up on 4/10
Ceiling Cracks There is a noticeable crack between the drywall and the ceiling that has emerged, posing concerns for the structural integrity of the property. I have reported this issue to Tim for further assessment Drywaller
Shower Wall Stability, Additionally, I have discovered an issue with the stability of the shower wall. Upon pressing, the bricks appear to move, indicating a potential structural Problem??? Jill
Flooring issues waiting on Eric Eric / Denny
UPGRADES - COMPLETED
    White painted cabinetry in kitchen  
    Shower Door with Brushed Nickel Trim  
    Eggshell Paint  
    Expanded Driveway  
    Microwave Vented to Exterior  
    French Model Fridge  
    Digital Deadbolt, front door  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  03.31.2022    
-- -- $2500 Deposit Received (0)  04.01.2022    
-- -- Association Packet Requested (0)  03.31.2022    
-- -- Association Packet Received (0)  04.02.2022    
-- -- Selections Meeting (0)  05.24.2022    
-- -- Selections Sheet Signed (0)  06.27.2022     6/16/2022: sent to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.24.2022     6/26/2022: sent to Kozhin for signatures
-- -- Deposit For Upgrades Received (0)  07.24.2022    
-- -- Building Permit (30) *   07.22.2022    
-- -- Order Roof & Floor Trusses (1)  09.08.2022    
-- -- Order Windows & Doors (0)  09.08.2022    
-- -- Stake Out Home (1)  07.28.2022    
-- -- Excavate (2)  08.08.2022    
-- -- Inspection (Footers) (1)  12.14.2025    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1) *   08.08.2022    
-- -- Set Forms (2)  08.15.2022    
-- -- Pour Foundation Walls (1)  08.15.2022    
-- -- Plumb Slab (2)  09.06.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.06.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.08.2022    
-- -- Prepare Slab (1)  09.06.2022    
-- -- Inspection (Slab) (1)  09.08.2022    
-- -- Inspection (Drain Tile) (0)  10.10.2022    
-- -- Settlement Agent Confirmed (0)  01.31.2023    
-- -- Framing I (9)  09.29.2022    
-- -- Order Steps (0)  10.10.2022    
-- -- Order Tubs / Showers (0)  10.10.2022     Gray Shower Panel Walls
-- -- Framing II (8)  10.09.2022    
-- -- Framing III (8) *   10.17.2022    
-- -- Verify Window & Roof Structure (0)  04.08.2024     Flooring issues waiting on Eric?
-- -- Install Stairs (0) *   11.19.2022    
-- -- House Number and Status in Window (0)  11.30.2022    
-- -- Roofing (0) *   11.19.2022    
-- -- Order Cabinets (0)  11.22.2022    
-- -- Order Appliances (0)  08.30.2022     French Upgrade
-- -- Deck (0)  11.19.2022     Standard
-- -- Gutters (0)  03.05.2023    
-- -- Driveway (0) *   02.08.2023     Expanded Driveway
-- -- Patio (0)  01.01.2023     Standard
-- -- Privacy Divider / Fence (0) *   02.04.2023    
-- -- HVAC Rough In (4)  03.01.2023     In process 11/2
-- -- Rough In Microwave Vent (0)  04.08.2024    
-- -- Plumbing Rough In (4)  11.16.2022     In process 11/12. Almost completed
-- -- Electric Rough In (4)  11.19.2022    
-- -- Inspection (Rough In HVAC) (1)  12.03.2022    
-- -- Inspection (Rough In Plumbing) (1)  12.03.2022    
-- -- Inspection (Rough In Electric) (1)  12.03.2022    
-- -- Inspection (Framing) (1) *   12.03.2022    
-- -- Inspection (Deck Piers) (0)  11.30.2022    
-- -- Exterior Vinyl (0) *   02.11.2023    
-- -- Exterior Stone (0)  02.22.2023     In process 2/18
-- -- Insulation (2) *   12.08.2022    
-- -- Inspection (Insulation) (1)  12.03.2022    
-- -- Inspection (Electric Service) (0)  04.06.2023    
-- -- Set Electric Meter (0) *   04.20.2023    
-- -- Inspection (Main Sewer Line) (0)  02.13.2023    
-- -- Inspection (Main Water Line) (0)  02.13.2023    
-- -- Order Interior Doors & Trim (0)  12.08.2022    
-- -- Drywall (Hang) (4) *   12.10.2022     NONE
-- -- Loan Approval (0)  03.05.2023    
-- -- Deed Preparation (0)  03.05.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   01.04.2023     In process 1/1
-- -- Paint 1 (1)  01.04.2023    
-- -- Garage Door (0)  02.22.2023    
-- -- House Numbers (0)  03.01.2023    
-- -- Mailbox (0)  02.20.2023    
-- -- Cabinet Installation (2) *   01.07.2023     Jan 6
-- -- Granite Installation (1) *   01.14.2023    
-- -- Interior Trim - Install (3) *   01.25.2023     In process 1/21
-- -- Order Plumbing / Lighting Fixtures (0)  04.08.2024    
-- -- Interior Trim - Paint (1)  01.28.2023    
-- -- Luxury Vinyl Tile (0)  02.11.2023    
-- -- Paint 2 (3)  01.18.2023    
-- -- Cover Floors (0)  02.11.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  02.13.2023    
-- -- Shoe Moulding (0)  02.22.2023     In process 2/11
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   04.05.2023     Needs shelving 4/1
-- -- Install Coded Lockbox (add extra keys) (0)  03.01.2023    
-- -- Pay Water / Sewer Taps (0)  02.16.2023    
-- -- Set Water Meter (1) *   03.16.2023    
-- -- Electric Trim Out (3) *   02.18.2023     Standard Brushed Nickel in process 2/15
-- -- Ceiling Fans (0)  02.25.2023    
-- -- HVAC Trim Out (1) *   03.05.2023     Needed 3/1
-- -- Blower Door Test (1)  04.08.2024    
-- -- Plumbing Trim Out (2) *   02.22.2023     Standard Brushed Nickel. In process 2/18
-- -- Install Appliances (0) *   03.05.2023     Delivery 10/31- Schedule install with CJ
-- -- Paint 3 (2) *   01.28.2023    
-- -- Carpet (2)  02.11.2023    
-- -- Appraiser Confirms Construction Completion (0)  06.21.2023    
-- -- Inspection (Final HVAC) (0)  04.25.2023     Mon, Apr 24
-- -- Inspection (Final Plumbing) (0)  04.25.2023    
-- -- Inspection (Final Electric) (0)  04.25.2023    
-- -- Inspection (Final Building) (4) *   04.25.2023    
-- -- Pre Walk Through (0)  04.24.2023    
-- -- Stain Hardwood Stairs (1) *   02.25.2023     In process 2/22
-- -- Cleaning (1)  04.26.2023    
-- -- Certificate of Occupancy (1) *   04.25.2023    
-- -- C.O. to Lender (0)  04.25.2023    
-- -- Schedule Closing (0)  06.21.2023    
-- -- Buyer Walk Through (1) *   04.27.2023     Wed, Apr 26 at 2:00 PM
-- -- Payment for Upgrades (0)  03.05.2023    
-- -- Keys to Settlement Agent (0)  04.20.2023    
-- -- Review Settlement Statement (0)  06.21.2023    
-- -- Jerry Signs Closing Documents (0)  06.22.2023     Amar, Fri, June 23
-- -- Request Trash Tote From POA Manager (0)  04.20.2023    
-- -- Closing (1)  06.29.2023     Brittany @ West View Title, Friday, June 23
-- -- Remove Coded Lockbox (0)  06.29.2023