102 ADDR
CONGERS-2 - 24  ::  1436 Palomino Trail
[ BUILD: 20221384 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
UPGRADES
    Trash Pull Out ($470) Three Drawer Stack ($390) Spice Rack ($310)  
    Gray Shower Panel Walls- Master Shower  
    Oak Stair system to bedroom level  
    Level III Quartz- like model  
    Amendment to increase price by $15,600  
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    White painted cabinetry in kitchen  
    Shower Door with Brushed Nickel Trim  
    LVP Up hallway  
    Eggshell Paint  
    Expanded Driveway  
    Microwave Vented to Exterior  
    French Model Fridge  
    Digital Deadbolt, front door  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  12.14.2025    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.06.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.08.2022    
-- -- Inspection (Slab) (1)  09.08.2022    
-- -- Inspection (Drain Tile) (0)  10.10.2022    
-- -- Inspection (Rough In HVAC) (1)  12.03.2022    
-- -- Inspection (Rough In Plumbing) (1)  12.03.2022    
-- -- Inspection (Rough In Electric) (1)  12.03.2022    
-- -- Inspection (Framing) (1) *   12.03.2022    
-- -- Inspection (Deck Piers) (0)  11.30.2022    
-- -- Inspection (Insulation) (1)  12.03.2022    
-- -- Inspection (Electric Service) (0)  04.06.2023    
-- -- Inspection (Main Sewer Line) (0)  02.13.2023    
-- -- Inspection (Main Water Line) (0)  02.13.2023    
-- -- Inspection (Final HVAC) (0)  04.25.2023     Mon, Apr 24
-- -- Inspection (Final Plumbing) (0)  04.25.2023    
-- -- Inspection (Final Electric) (0)  04.25.2023    
-- -- Inspection (Final Building) (4) *   04.25.2023