| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| White kitchen cabinetry | ||||
| Level III Quartz Countertop in Kitchen | ||||
| Farmhouse Sink | ||||
| French Model Refrigerator | ||||
| Farmhouse Plumbing Package | ||||
| Vent Microwave to exterior | ||||
| Amendment to increase price by $5,630 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 08.08.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 09.06.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.08.2022 | ||
| -- | -- | Inspection (Slab) (1) 09.08.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 10.10.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 12.03.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 12.03.2022 | 11/17 | |
| -- | -- | Inspection (Rough In Electric) (1) 12.03.2022 | ||
| -- | -- | Inspection (Framing) (1) * 12.03.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 02.13.2023 | ||
| -- | -- | Inspection (Insulation) (1) 12.08.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 04.06.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 02.13.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 02.13.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 04.22.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 04.22.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 04.22.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 04.22.2023 | ||