Water leaks |
In all bathrooms |
|
-- |
-- |
Deck boards |
|
|
|
-- |
-- |
Can 104 be accelerated? |
|
|
-- |
-- |
Needs correct thermostat |
HVAC |
|
-- |
-- |
bath light needed basement |
Electricians and bathtub light |
|
-- |
-- |
Cable cover needed basement |
Electricians |
|
-- |
-- |
trash can drawer ok? Disassembled in pantry. |
|
|
-- |
-- |
Push oven against wall |
|
|
-- |
-- |
Bent metal on awning |
Davenport - Jeremy (dent) |
|
-- |
-- |
Garage door trim |
Davenport |
|
-- |
-- |
Electric cover needed near back patio doors |
Electrician |
|
-- |
-- |
Patio board to d3ck |
Tom |
|
-- |
-- |
Repair landscaping on sides from electrical repairs |
Pettit |
|
-- |
-- |
FHA financing documents? |
signed by Jerry? |
|
-- |
-- |
Drywall repair basement closet |
Painter |
|
-- |
-- |
Drywall repair above light powder bath |
Painter |
|
-- |
-- |
Laundry outlet needed |
Electrician - cover |
|
-- |
-- |
Outside electric trim out needed |
Electrician - cover |
|
-- |
-- |
Lots of glue on the back patio door |
Painter - on inside jamb |
|
-- |
-- |
Beauty place back faucet |
Davenport |
|
-- |
-- |
Interior garage trim needed all units |
Edgar |
|
-- |
-- |
Plugs for screw holes in bonus |
Jill |
|
-- |
-- |
Painters to clean off kickplate bonus vanity |
Painter |
|
-- |
-- |
Painters to clean off kickplate bonus vanity |
|
|
-- |
-- |
Plugs for screw holes at front door |
Jill |
|
-- |
-- |
Screw holes French doors |
Jill |
|
-- |
-- |
Several areas of orange mud on bonus room carpet |
Jill - cleaner |
|
-- |
-- |
Adjust closet doors upstairs |
Jill |
|
-- |
-- |
Towel holders at different levels-fix or not? |
Joe. The towel holder has been moved over but it’s still not level. |
|
-- |
-- |
Attic cover |
|
|
-- |
-- |
Install patio door |
Screen |
|
-- |
-- |
CODED LOCKBOX 0107 |
1107 |
|
-- |
-- |
Paint touch up at master bathroom |
Painter |
|
-- |
-- |
Power wash patios |
|
|
-- |
-- |
Painters need to clean off paint on all vanities |
Painter |
|
-- |
-- |
Likely delayed closing (Apr 24?) |
|
|
-- |
-- |
Remove a few items from the garage |
|
|
-- |
-- |
Clean garage floor |
|
|
-- |
-- |
Paint touchup throughout |
|
|
-- |
-- |
Bonus bath clean paint off kickplate |
|
|
-- |
-- |
Bonus bath fill nail holes at shoe around vanity |
|
|
-- |
-- |
Ratified Contract? (0) 05.11.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 05.13.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 05.11.2022 |
|
|
-- |
-- |
Association Packet Received (0) 05.13.2022 |
|
|
-- |
-- |
Selections Meeting (0) 05.24.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 06.16.2022 |
6/14/2022: sent to Pete Hill for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 07.03.2022 |
6/16/2022: sent to Pete for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 07.02.2022 |
|
|
-- |
-- |
Building Permit (30) 07.20.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 09.08.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 09.08.2022 |
|
|
-- |
-- |
Stake Out Home (1) 07.28.2022 |
|
|
-- |
-- |
Excavate (2) 07.28.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 07.28.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 09.07.2022 |
|
|
-- |
-- |
Pour Footers (1) 07.28.2022 |
|
|
-- |
-- |
Set Forms (2) 07.28.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 09.07.2022 |
|
|
-- |
-- |
Plumb Slab (2) 09.08.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 09.08.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 09.08.2022 |
|
|
-- |
-- |
Prepare Slab (1) 09.19.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 09.22.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 09.22.2022 |
|
|
-- |
-- |
Pour Slab (1) * 09.22.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 05.25.2022 |
|
|
-- |
-- |
Framing I (9) 10.03.2022 |
|
|
-- |
-- |
Order Steps (0) 10.10.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0) 10.10.2022 |
|
|
-- |
-- |
Framing II (8) 10.09.2022 |
|
|
-- |
-- |
Framing III (8) * 10.20.2022 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 07.17.2024 |
|
|
-- |
-- |
Install Stairs (0) 11.26.2022 |
|
|
-- |
-- |
Windows & Doors (0) 11.26.2022 |
|
|
-- |
-- |
House Number and Status in Window (0) 01.02.2023 |
|
|
-- |
-- |
Roofing (0) 11.27.2022 |
|
|
-- |
-- |
Order Cabinets (0) 10.20.2022 |
|
|
-- |
-- |
Order Appliances (0) 08.30.2022 |
French Upgrade |
|
-- |
-- |
Deck (0) 11.16.2022 |
Expanded 12 x 18 Deck |
|
-- |
-- |
Gutters (0) 03.15.2023 |
|
|
-- |
-- |
Driveway (0) 01.25.2023 |
Expanded Driveway |
|
-- |
-- |
Patio (0) 12.07.2022 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0) 03.22.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 03.01.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 11.19.2022 |
In process 11/16 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 12.12.2022 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 07.17.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 11.30.2022 |
In process 11/26 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 12.12.2022 |
|
|
-- |
-- |
Electric Rough In (4) 12.07.2022 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 12.12.2022 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 12.12.2022 |
|
|
-- |
-- |
Inspection (Framing) (1) 12.12.2022 |
|
|
-- |
-- |
Exterior Vinyl (0) * 03.01.2023 |
in process 2/25 |
|
-- |
-- |
Exterior Stone (0) 03.15.2023 |
|
|
-- |
-- |
Insulation (2) 12.14.2022 |
|
|
-- |
-- |
Inspection (Insulation) (1) 12.15.2022 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 04.05.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 04.06.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.16.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 03.16.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 02.15.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 12.27.2022 |
Finish Bonus Room, Bonus Bath |
|
-- |
-- |
Loan Approval (0) 03.05.2023 |
|
|
-- |
-- |
Deed Preparation (0) 03.05.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 01.14.2023 |
In process 1/11 |
|
-- |
-- |
Paint 1 (1) 01.18.2023 |
|
|
-- |
-- |
Garage Door (0) 02.01.2023 |
|
|
-- |
-- |
House Numbers (0) 03.16.2023 |
|
|
-- |
-- |
Mailbox (0) 03.02.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 01.14.2023 |
Jan 13. On site 1/11 |
|
-- |
-- |
Granite Installation (1) * 01.28.2023 |
Jan 24 |
|
-- |
-- |
Interior Trim - Install (3) 02.04.2023 |
In process 2/1 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 07.17.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1) 02.04.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 02.15.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 02.15.2023 |
|
|
-- |
-- |
Paint 2 (3) 02.08.2023 |
|
|
-- |
-- |
Cover Floors (1) 02.18.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 03.01.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 02.22.2023 |
In process 2/18 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 03.29.2023 |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 04.05.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 02.16.2023 |
|
|
-- |
-- |
Set Water Meter (0) 03.16.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 03.05.2023 |
Black standard. In process 3/1 |
|
-- |
-- |
Ceiling Fans (0) 03.01.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 02.25.2023 |
|
|
-- |
-- |
Blower Door Test (1) 07.17.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2) 02.25.2023 |
Black standard. In process 2/22 |
|
-- |
-- |
Install Appliances (0) * 03.05.2023 |
Delivery 10/31- Schedule install with CJ |
|
-- |
-- |
Paint 3 (2) * 02.08.2023 |
|
|
-- |
-- |
Carpet (2) 02.18.2023 |
In process 2/15 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 04.27.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 04.08.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 04.08.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 04.08.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 04.08.2023 |
|
|
-- |
-- |
Pre Walk Through (0) 03.27.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 03.15.2023 |
|
|
-- |
-- |
Cleaning (1) 04.12.2023 |
in process 4/10 |
|
-- |
-- |
Certificate of Occupancy (1) * 04.10.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 04.10.2023 |
|
|
-- |
-- |
Schedule Closing (0) 04.27.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 04.25.2023 |
Mon, Apr 24 at 11AM |
|
-- |
-- |
Payment for Upgrades (0) 03.05.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 04.10.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 04.27.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 03.10.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 04.10.2023 |
|
|
-- |
-- |
Closing (1) 04.27.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 04.27.2023 |
|
|