1 28 33 37 45 46 47 48 71 52 70 69 67 53 54 55 56 59 58 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 107  ::  1445 Palomino Trail
[ BUILD: 20221342 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Water leaks In all bathrooms
--   --   Deck boards
--   --   Can 104 be accelerated?
--   --   Needs correct thermostat HVAC
--   --   bath light needed basement Electricians and bathtub light
--   --   Cable cover needed basement Electricians
--   --   trash can drawer ok? Disassembled in pantry.
--   --   Push oven against wall
--   --   Bent metal on awning Davenport - Jeremy (dent)
--   --   Garage door trim Davenport
--   --   Electric cover needed near back patio doors Electrician
--   --   Patio board to d3ck Tom
--   --   Repair landscaping on sides from electrical repairs Pettit
--   --   FHA financing documents? signed by Jerry?
--   --   Drywall repair basement closet Painter
--   --   Drywall repair above light powder bath Painter
--   --   Laundry outlet needed Electrician - cover
--   --   Outside electric trim out needed Electrician - cover
--   --   Lots of glue on the back patio door Painter - on inside jamb
--   --   Beauty place back faucet Davenport
--   --   Interior garage trim needed all units Edgar
--   --   Plugs for screw holes in bonus Jill
--   --   Painters to clean off kickplate bonus vanity Painter
--   --   Painters to clean off kickplate bonus vanity
--   --   Plugs for screw holes at front door Jill
--   --   Screw holes French doors Jill
--   --   Several areas of orange mud on bonus room carpet Jill - cleaner
--   --   Adjust closet doors upstairs Jill
--   --   Towel holders at different levels-fix or not? Joe. The towel holder has been moved over but it’s still not level.
--   --   Attic cover
--   --   Install patio door Screen
--   --   CODED LOCKBOX 0107 1107
--   --   Paint touch up at master bathroom Painter
--   --   Power wash patios
--   --   Painters need to clean off paint on all vanities Painter
--   --   Likely delayed closing (Apr 24?)
--   --   Remove a few items from the garage
--   --   Clean garage floor
--   --   Paint touchup throughout
--   --   Bonus bath clean paint off kickplate
--   --   Bonus bath fill nail holes at shoe around vanity
-- -- Ratified Contract? (0)  05.11.2022    
-- -- $2500 Deposit Received (0)  05.13.2022    
-- -- Association Packet Requested (0)  05.11.2022    
-- -- Association Packet Received (0)  05.13.2022    
-- -- Selections Meeting (0)  05.24.2022    
-- -- Selections Sheet Signed (0)  06.16.2022     6/14/2022: sent to Pete Hill for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.03.2022     6/16/2022: sent to Pete for signatures
-- -- Deposit For Upgrades Received (0)  07.02.2022    
-- -- Building Permit (30)  07.20.2022    
-- -- Order Roof & Floor Trusses (1)  09.08.2022    
-- -- Order Windows & Doors (0)  09.08.2022    
-- -- Stake Out Home (1)  07.28.2022    
-- -- Excavate (2)  07.28.2022    
-- -- Inspection (Footers) (1)  07.28.2022    
-- -- Inspection (Concrete Wall) (1)  09.07.2022    
-- -- Pour Footers (1)  07.28.2022    
-- -- Set Forms (2)  07.28.2022    
-- -- Pour Foundation Walls (1)  09.07.2022    
-- -- Plumb Slab (2)  09.08.2022    
-- -- Inspection (Plumbing Under Slab) (1)  09.08.2022    
-- -- Inspection (Conduit Under Slab) (1)  09.08.2022    
-- -- Prepare Slab (1)  09.19.2022    
-- -- Inspection (Slab) (1)  09.22.2022    
-- -- Inspection (Drain Tile) (0)  09.22.2022    
-- -- Pour Slab (1)  09.22.2022    
-- -- Settlement Agent Confirmed (0)  05.25.2022    
-- -- Framing I (9)  10.03.2022    
-- -- Order Steps (0)  10.10.2022    
-- -- Order Tubs / Showers (0)  10.10.2022    
-- -- Framing II (8)  10.09.2022    
-- -- Framing III (8)  10.20.2022    
-- -- Verify Window & Roof Structure (0)  07.17.2024    
-- -- Install Stairs (0)  11.26.2022    
-- -- Windows & Doors (0)  11.26.2022    
-- -- House Number and Status in Window (0)  01.02.2023    
-- -- Roofing (0)  11.27.2022    
-- -- Order Cabinets (0)  10.20.2022    
-- -- Order Appliances (0)  08.30.2022     French Upgrade
-- -- Deck (0)  11.16.2022     Expanded 12 x 18 Deck
-- -- Gutters (0)  03.15.2023    
-- -- Driveway (0)  01.25.2023     Expanded Driveway
-- -- Patio (0)  12.07.2022     Standard
-- -- Privacy Divider / Fence (0)  03.22.2023    
-- -- Sod / Seed / Landscaping (0)  03.01.2023    
-- -- HVAC Rough In (4)  11.19.2022     In process 11/16
-- -- Inspection (Rough In HVAC) (1)  12.12.2022    
-- -- Rough In Microwave Vent (0)  07.17.2024    
-- -- Plumbing Rough In (4)  11.30.2022     In process 11/26
-- -- Inspection (Rough In Plumbing) (1)  12.12.2022    
-- -- Electric Rough In (4)  12.07.2022    
-- -- Inspection (Rough In Electric) (1)  12.12.2022    
-- -- Inspection (Deck Piers) (0)  12.12.2022    
-- -- Inspection (Framing) (1)  12.12.2022    
-- -- Exterior Vinyl (0)  03.01.2023     in process 2/25
-- -- Exterior Stone (0)  03.15.2023    
-- -- Insulation (2)  12.14.2022    
-- -- Inspection (Insulation) (1)  12.15.2022    
-- -- Inspection (Electric Service) (0)  04.05.2023    
-- -- Set Electric Meter (0)  04.06.2023    
-- -- Inspection (Main Sewer Line) (0)  03.16.2023    
-- -- Inspection (Main Water Line) (0)  03.16.2023    
-- -- Order Interior Doors & Trim (0)  02.15.2023    
-- -- Drywall (Hang) (4)  12.27.2022     Finish Bonus Room, Bonus Bath
-- -- Loan Approval (0)  03.05.2023    
-- -- Deed Preparation (0)  03.05.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6)  01.14.2023     In process 1/11
-- -- Paint 1 (1)  01.18.2023    
-- -- Garage Door (0)  02.01.2023    
-- -- House Numbers (0)  03.16.2023    
-- -- Mailbox (0)  03.02.2023    
-- -- Cabinet Installation (2)  01.14.2023     Jan 13. On site 1/11
-- -- Granite Installation (1)  01.28.2023     Jan 24
-- -- Interior Trim - Install (3)  02.04.2023     In process 2/1
-- -- Order Plumbing / Lighting Fixtures (0)  07.17.2024    
-- -- Interior Trim - Paint (1)  02.04.2023    
-- -- Luxury Vinyl Plank (3)  02.15.2023    
-- -- Luxury Vinyl Tile (0)  02.15.2023    
-- -- Paint 2 (3)  02.08.2023    
-- -- Cover Floors (1)  02.18.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  03.01.2023    
-- -- Shoe Moulding (0)  02.22.2023     In process 2/18
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  03.29.2023    
-- -- Install Coded Lockbox (add extra keys) (0)  04.05.2023    
-- -- Pay Water / Sewer Taps (0)  02.16.2023    
-- -- Set Water Meter (0)  03.16.2023    
-- -- Electric Trim Out (3)  03.05.2023     Black standard. In process 3/1
-- -- Ceiling Fans (0)  03.01.2023    
-- -- HVAC Trim Out (1)  02.25.2023    
-- -- Blower Door Test (1)  07.17.2024    
-- -- Plumbing Trim Out (2)  02.25.2023     Black standard. In process 2/22
-- -- Install Appliances (0)  03.05.2023     Delivery 10/31- Schedule install with CJ
-- -- Paint 3 (2)  02.08.2023    
-- -- Carpet (2)  02.18.2023     In process 2/15
-- -- Appraiser Confirms Construction Completion (0)  04.27.2023    
-- -- Inspection (Final HVAC) (1)  04.08.2023    
-- -- Inspection (Final Plumbing) (1)  04.08.2023    
-- -- Inspection (Final Electric) (1)  04.08.2023    
-- -- Inspection (Final Building) (2)  04.08.2023    
-- -- Pre Walk Through (0)  03.27.2023    
-- -- Stain Hardwood Stairs (1)  03.15.2023    
-- -- Cleaning (1)  04.12.2023     in process 4/10
-- -- Certificate of Occupancy (1)  04.10.2023    
-- -- C.O. to Lender (0)  04.10.2023    
-- -- Schedule Closing (0)  04.27.2023    
-- -- Buyer Walk Through (1)  04.25.2023     Mon, Apr 24 at 11AM
-- -- Payment for Upgrades (0)  03.05.2023    
-- -- Keys to Settlement Agent (0)  04.10.2023    
-- -- Review Settlement Statement (0)  04.27.2023    
-- -- Jerry Signs Closing Documents (0)  03.10.2023    
-- -- Request Trash Tote From POA Manager (0)  04.10.2023    
-- -- Closing (1)  04.27.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  04.27.2023