| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Bonus Room | ||||
| Bonus Bath | ||||
| Expanded Driveway | ||||
| Expanded 12 x 18 Deck | ||||
| White Kitchen Cabinetry | ||||
| French Model Refrigerator | ||||
| Eggshell Paint | ||||
| Vent Microwave to Exterior | ||||
| Double Waste Basket ($470) Spice Rack ($310) Three Drawer Stack ($390) | ||||
| Garage Keypad | ||||
| EcoBee Thermostat | ||||
| Amendment to increase price by $24,620 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 07.28.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 09.07.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 09.08.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 09.08.2022 | ||
| -- | -- | Inspection (Slab) (1) 09.22.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 09.22.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 12.12.2022 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 12.12.2022 | ||
| -- | -- | Inspection (Rough In Electric) (1) 12.12.2022 | ||
| -- | -- | Inspection (Framing) (1) * 12.12.2022 | ||
| -- | -- | Inspection (Deck Piers) (0) 12.12.2022 | ||
| -- | -- | Inspection (Insulation) (1) 12.15.2022 | ||
| -- | -- | Inspection (Electric Service) (0) 04.05.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.16.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.16.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 04.08.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 04.08.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 04.08.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 04.08.2023 | ||