Fri |
Sep 20 |
Verify Window & Roof Structure (0)
|
|
|
Fri |
Sep 20 |
Rough In Microwave Vent (0)
|
|
|
Fri |
Sep 20 |
Order Plumbing / Lighting Fixtures (0)
|
|
|
Fri |
Sep 20 |
Blower Door Test (1)
|
|
|
|
-- |
-- |
Wants to pay for upgrades ahead of time |
|
|
-- |
-- |
Crooked cripple stud under double window in master bedroom |
|
|
-- |
-- |
Patio doors needed 103-100 |
|
|
-- |
-- |
Missing black handle kitchen cabinet |
|
|
-- |
-- |
MB cabinet front panel looks odd 2/15 |
|
|
-- |
-- |
Peeling paint on garage wall |
|
|
-- |
-- |
Holes in wall on landing between second and third floor |
|
|
-- |
-- |
Missing master bathroom vanity handle |
Fred |
|
-- |
-- |
Garage trim issue |
Davenport |
|
-- |
-- |
Garage trim |
|
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Microwave venting is behind drywall, right? |
tell Scott |
|
-- |
-- |
Broken corner of kitchen window when viewed from outside |
Just the corner is broken. Got pics 3/22 |
|
-- |
-- |
Shower Walls |
Mast & Brunk |
|
-- |
-- |
Garage trim needed |
Davenport |
|
-- |
-- |
Drywall hole in ceiling |
Painter |
|
-- |
-- |
Closing May 8? |
|
|
-- |
-- |
Call needs patching and powder bath light |
|
|
-- |
-- |
Hole needs patching in powder bath light |
Drywaller |
|
-- |
-- |
Light switch cover needed in hall bath |
Electric |
|
-- |
-- |
Black shower drain needed |
Plumber |
|
-- |
-- |
Electric outlet needed on the back deck |
Electrician |
|
-- |
-- |
Remote control attached to this fan as well |
Electrician |
|
-- |
-- |
Outlets needed on the kitchen island |
Electrician |
|
-- |
-- |
Drywall gap at switch plate cover in primary bathroom |
Painter? |
|
-- |
-- |
There appears to be a patio screen, door track and 102 in the basement bonus room |
|
|
-- |
-- |
CODED LOCKBOX 0102 |
|
|
-- |
-- |
Remove extra screens and patio doors |
Jill |
|
-- |
-- |
Needs quite a bit of touchup painting |
Painter. In process 4/29 |
|
-- |
-- |
Remove extra cabinet items from living room |
Jill |
|
-- |
-- |
Anchor dishwasher-is cj supposed to do this? |
CJ |
|
-- |
-- |
Anchor dishwasher-is cj supposed to do this? |
|
|
-- |
-- |
Repair hole in hall bathroom bathtub |
Repair guy scheduled for Monday 5-1-23 |
|
-- |
-- |
Lots of glue in hall shower |
|
|
-- |
-- |
Cabinet nicks and scratches in kitchen perimeter cabinets |
|
|
-- |
-- |
Empty garage |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Missing weatherstripping at the front door |
|
|
-- |
-- |
Push down door pins |
Jill |
|
-- |
-- |
Extra filter needed |
Jill |
|
-- |
-- |
Screen door latches is not working |
|
|
-- |
-- |
Deadbolt and patio door of the bonus room not lined up |
|
|
-- |
-- |
Replace white island outlets with gray |
Electrician |
|
-- |
-- |
Missing bracket for top shelf in cabinet pantry |
Jill |
|
-- |
-- |
Touch up paint |
In process 5/3 |
|
-- |
-- |
Install bottom part of dishwasher |
CJ/Tom |
|
-- |
-- |
Change pendant bulbs to warm white |
Jill |
|
-- |
-- |
missing weatherstripping at front door |
Jill |
|
-- |
-- |
Push down door pins |
|
|
-- |
-- |
Screen door latches not working |
Tom |
|
-- |
-- |
Patio door lack out of line |
Joe |
|
-- |
-- |
Replace White Island outlets to gray |
|
|
-- |
-- |
Missing bracket in cabinet pantry for shelf |
Jill |
|
-- |
-- |
Replace master closet door handle |
Joe |
|
-- |
-- |
Replace attic access door |
Tom |
|
-- |
-- |
Receptacle cover needed on garage ceiling |
Electrician |
|
-- |
-- |
garage door not working |
Davenport |
|
-- |
-- |
Left bottom corner kitchen exterior window ( builder discussion) |
|
|
-- |
-- |
Adjust water pressure |
Jill |
|
-- |
-- |
CODED LOCKBOX 1102 |
|
|
-- |
-- |
Water leak |
|
|
-- |
-- |
Police Parking Only Sign |
|
|
-- |
-- |
Ratified Contract? (0)
05.26.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0)
05.31.2022 |
|
|
-- |
-- |
Association Packet Requested (0)
05.26.2022 |
|
|
-- |
-- |
Association Packet Received (0)
06.03.2022 |
|
|
-- |
-- |
Selections Meeting (0)
07.16.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0)
07.27.2022 |
7/16: sent to Carolyn for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
08.06.2022 |
7/27: sent to Carolyn |
|
-- |
-- |
Deposit For Upgrades Received (0)
08.06.2022 |
|
|
-- |
-- |
Building Permit (30)
08.15.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0)
11.03.2022 |
|
|
-- |
-- |
Stake Out Home (1)
09.22.2022 |
|
|
-- |
-- |
Excavate (2)
09.29.2022 |
|
|
-- |
-- |
Inspection (Footers) (1)
09.29.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
10.31.2022 |
|
|
-- |
-- |
Pour Footers (1)
09.29.2022 |
|
|
-- |
-- |
Set Forms (2)
10.31.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1)
10.31.2022 |
|
|
-- |
-- |
Plumb Slab (2)
10.31.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
10.31.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
10.31.2022 |
|
|
-- |
-- |
Prepare Slab (1)
10.31.2022 |
|
|
-- |
-- |
Inspection (Slab) (1)
10.31.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
10.10.2022 |
|
|
-- |
-- |
Pour Slab (1)
11.03.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
03.20.2023 |
|
|
-- |
-- |
Framing I (9)
11.17.2022 |
|
|
-- |
-- |
Order Steps (0)
12.08.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0)
10.10.2022 |
|
|
-- |
-- |
Framing II (8)
12.05.2022 |
|
|
-- |
-- |
Framing III (8)
12.07.2022 |
|
|
-- |
-- |
Install Stairs (0)
12.28.2022 |
|
|
-- |
-- |
Windows & Doors (0)
12.28.2022 |
|
|
-- |
-- |
House Number and Status in Window (0)
01.02.2023 |
|
|
-- |
-- |
Roofing (0)
12.28.2022 |
|
|
-- |
-- |
Order Cabinets (0)
12.30.2022 |
|
|
-- |
-- |
Order Appliances (0)
08.30.2022 |
French Model Upgrade |
|
-- |
-- |
Deck (0)
01.07.2023 |
Expanded 12 x 18 Deck |
|
-- |
-- |
Gutters (0)
03.01.2023 |
|
|
-- |
-- |
Driveway (0)
03.18.2023 |
Expanded Driveway |
|
-- |
-- |
Patio (0)
02.25.2023 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0)
03.05.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
04.23.2023 |
|
|
-- |
-- |
HVAC Rough In (4)
12.28.2022 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
01.05.2023 |
|
|
-- |
-- |
Plumbing Rough In (4)
01.04.2023 |
In process 1/1 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
01.05.2023 |
|
|
-- |
-- |
Electric Rough In (4)
01.14.2023 |
In process 1/11 |
|
-- |
-- |
Inspection (Rough In Electric) (1)
01.16.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
01.16.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
01.16.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
03.01.2023 |
in process 2/25 |
|
-- |
-- |
Exterior Stone (0)
03.20.2023 |
|
|
-- |
-- |
Insulation (2)
01.18.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1)
01.26.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
04.06.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
04.20.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
03.16.2023 |
|
|
-- |
-- |
Drywall (Hang) (4)
01.28.2023 |
BONUS ROOM ONLY |
|
-- |
-- |
Loan Approval (0)
07.03.2022 |
|
|
-- |
-- |
Deed Preparation (0)
04.03.2023 |
send to Cheryl at Clark & Bradshaw |
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
02.08.2023 |
In process 2/1. Be done Monday 2/5 |
|
-- |
-- |
Paint 1 (1)
02.08.2023 |
|
|
-- |
-- |
Garage Door (0)
03.15.2023 |
|
|
-- |
-- |
House Numbers (0)
04.05.2023 |
|
|
-- |
-- |
Mailbox (0)
04.03.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
02.15.2023 |
Feb. 11 |
|
-- |
-- |
Granite Installation (1)
02.15.2023 |
|
|
-- |
-- |
Interior Trim - Install (3)
03.01.2023 |
In process 2/25 |
|
-- |
-- |
Interior Trim - Paint (1)
03.05.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
03.18.2023 |
In process 3/15 |
|
-- |
-- |
Luxury Vinyl Tile (0)
03.18.2023 |
|
|
-- |
-- |
Paint 2 (3)
03.08.2023 |
|
|
-- |
-- |
Cover Floors (1)
04.01.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
03.20.2023 |
Black lighting |
|
-- |
-- |
Shoe Moulding (0)
03.25.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
04.24.2023 |
In process 4/19 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
04.20.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
03.16.2023 |
|
|
-- |
-- |
Set Water Meter (0)
05.01.2023 |
|
|
-- |
-- |
Electric Trim Out (3)
04.05.2023 |
Black lighting |
|
-- |
-- |
Ceiling Fans (0)
04.05.2023 |
|
|
-- |
-- |
HVAC Trim Out (1)
03.22.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2)
04.01.2023 |
Black Plumbing. In process 3/25 |
|
-- |
-- |
Install Appliances (0)
04.19.2023 |
Delivery 10/31- Schedule install with CJ |
|
-- |
-- |
Paint 3 (2)
03.22.2023 |
|
|
-- |
-- |
Carpet (2)
03.18.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
05.08.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
04.29.2023 |
Tue, Apr 25 |
|
-- |
-- |
Inspection (Final Plumbing) (1)
04.29.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
04.29.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
04.29.2023 |
|
|
-- |
-- |
Pre Walk Through (0)
04.29.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
04.23.2023 |
In process 3/29 |
|
-- |
-- |
Cleaning (1)
05.01.2023 |
In process 4/29 |
|
-- |
-- |
Certificate of Occupancy (1)
04.29.2023 |
|
|
-- |
-- |
C.O. to Lender (0)
04.29.2023 |
|
|
-- |
-- |
Schedule Closing (0)
05.08.2023 |
|
|
-- |
-- |
Buyer Walk Through (1)
05.03.2023 |
Monday, May 1, 4:00 PM |
|
-- |
-- |
Payment for Upgrades (0)
05.04.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
05.01.2023 |
|
|
-- |
-- |
Review Settlement Statement (0)
05.08.2023 |
Four deposits |
|
-- |
-- |
Jerry Signs Closing Documents (0)
05.09.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
04.21.2023 |
|
|
-- |
-- |
Closing (1)
05.09.2023 |
Cheryl Payne, Clark & Bradshaw |
|
-- |
-- |
Remove Coded Lockbox (0)
05.08.2023 |
|
|