Fri |
Sep 20 |
Verify Window & Roof Structure (0)
|
|
|
Fri |
Sep 20 |
Rough In Microwave Vent (0)
|
|
|
Fri |
Sep 20 |
Blower Door Test (1)
|
|
|
|
-- |
-- |
Rate expires mid February |
|
|
-- |
-- |
Large blemish front door |
Tom |
|
-- |
-- |
Black shower drain needed |
Plumber |
|
-- |
-- |
Remove extra drywall from basement bonus room |
Drywaller |
|
-- |
-- |
Remove remote control for master ceiling fan |
Jill |
|
-- |
-- |
Buried front gutter |
Tom |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Install handrails and final touch up paint needed |
Trim |
|
-- |
-- |
Door plugs needed in front and patio door |
Jill |
|
-- |
-- |
CODED LOCKBOX 0103 |
|
|
-- |
-- |
Dishwasher needs anchored into cabinets |
CJ |
|
-- |
-- |
House needs all shelving installed |
Mon, Apr 24 |
|
-- |
-- |
Repair landscaping between driveways from water meter repair |
Pettit |
|
-- |
-- |
Attic cover needed 4/26 |
Push back in place |
|
-- |
-- |
Glue in master bathroom shower |
Jill |
|
-- |
-- |
Sand and paint spot on kitchen ceiling |
Painter |
|
-- |
-- |
Clean out garge |
|
|
-- |
-- |
Clean out garage |
Jill. They are going to be two electric meters sitting on top of the trashcan. |
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
Microwave vented to exterior |
Cabinets need installed 5/17 |
|
-- |
-- |
Install screens |
Jill |
|
-- |
-- |
Paint touch up throughout |
Painter |
|
-- |
-- |
Replace white aluminum over front door |
Jeremy, Davenport |
|
-- |
-- |
Plus screw holes |
|
|
-- |
-- |
Adjust upstairs closet doors |
Jill |
|
-- |
-- |
Leave paint for buyers |
Painter. I don’t see any on site. 5/3 |
|
-- |
-- |
Remove ladder from up closet |
|
|
-- |
-- |
Tom to look at deck. Are boards too far apart??? |
Tom |
|
-- |
-- |
Owners have applied more blue tape? |
|
|
-- |
-- |
Paint touch up |
Painter |
|
-- |
-- |
New amendment to include upgrade cost for LVP upstairs |
5/16: sent to Kozhin |
|
-- |
-- |
put cabinets back up |
Tom |
|
-- |
-- |
Landscaping needed around recent repairs near electric meter |
Pettit |
|
-- |
-- |
Hang microwave |
CJ |
|
-- |
-- |
Adjust HVAC register on LVP so it goes down |
Jill |
|
-- |
-- |
Clean scuff off of siding on side of townhouse |
Jill |
|
-- |
-- |
Sand and paint top of half wall in living room at blemish |
Painter |
|
-- |
-- |
Remove ditch witch |
|
|
-- |
-- |
Missing stone on the side of the town |
|
|
-- |
-- |
Missing a stone on the end of the townhouse |
Grizzly Stone |
|
-- |
-- |
Ratified Contract? (0)
05.21.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0)
05.21.2022 |
|
|
-- |
-- |
Association Packet Requested (0)
05.21.2022 |
|
|
-- |
-- |
Association Packet Received (0)
05.25.2022 |
|
|
-- |
-- |
Selections Meeting (0)
06.08.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0)
06.14.2022 |
6/8/2022: sent to Kozhin for signatures; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
07.17.2022 |
7/11/2022: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0)
07.11.2022 |
|
|
-- |
-- |
Building Permit (30)
08.15.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0)
11.03.2022 |
|
|
-- |
-- |
Stake Out Home (1)
09.22.2022 |
|
|
-- |
-- |
Excavate (2)
09.29.2022 |
|
|
-- |
-- |
Inspection (Footers) (1)
09.29.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
10.31.2022 |
|
|
-- |
-- |
Pour Footers (1)
09.29.2022 |
|
|
-- |
-- |
Set Forms (2)
10.31.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1)
10.31.2022 |
|
|
-- |
-- |
Plumb Slab (2)
10.31.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
10.31.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
10.31.2022 |
|
|
-- |
-- |
Prepare Slab (1)
10.31.2022 |
|
|
-- |
-- |
Inspection (Slab) (1)
10.31.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
10.10.2022 |
|
|
-- |
-- |
Pour Slab (1)
11.03.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
03.21.2023 |
|
|
-- |
-- |
Framing I (9)
11.17.2022 |
|
|
-- |
-- |
Order Steps (0)
12.08.2022 |
|
|
-- |
-- |
Order Tubs / Showers (0)
10.10.2022 |
|
|
-- |
-- |
Framing II (8)
12.05.2022 |
|
|
-- |
-- |
Framing III (8)
12.07.2022 |
|
|
-- |
-- |
Install Stairs (0)
12.28.2022 |
|
|
-- |
-- |
Windows & Doors (0)
12.28.2022 |
|
|
-- |
-- |
House Number and Status in Window (0)
01.02.2023 |
|
|
-- |
-- |
Roofing (0)
12.28.2022 |
|
|
-- |
-- |
Order Cabinets (0)
12.30.2022 |
|
|
-- |
-- |
Order Appliances (0)
08.30.2022 |
Standard SS |
|
-- |
-- |
Deck (0)
01.07.2023 |
Expanded 12 x 18 Deck |
|
-- |
-- |
Gutters (0)
03.15.2023 |
|
|
-- |
-- |
Driveway (0)
03.18.2023 |
Expanded Driveway |
|
-- |
-- |
Patio (0)
02.25.2023 |
Standard |
|
-- |
-- |
Privacy Divider / Fence (0)
05.06.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
04.23.2023 |
Needs sod 4/15 |
|
-- |
-- |
HVAC Rough In (4)
12.28.2022 |
In process 12/17 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
01.05.2023 |
|
|
-- |
-- |
Plumbing Rough In (4)
01.04.2023 |
In process 1/1 Almost completed |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
01.05.2023 |
|
|
-- |
-- |
Electric Rough In (4)
01.07.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
01.12.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
03.16.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
01.12.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
03.15.2023 |
in process 2/25 |
|
-- |
-- |
Exterior Stone (0)
03.29.2023 |
In process 3/25 |
|
-- |
-- |
Insulation (2)
01.14.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1)
01.16.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
04.06.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
04.20.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
02.25.2023 |
|
|
-- |
-- |
Drywall (Hang) (4)
01.21.2023 |
NONE. In process 1/18 |
|
-- |
-- |
Loan Approval (0)
04.03.2023 |
|
|
-- |
-- |
Deed Preparation (0)
04.03.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
02.01.2023 |
In process 1/28 |
|
-- |
-- |
Paint 1 (1)
02.04.2023 |
|
|
-- |
-- |
Garage Door (0)
03.15.2023 |
|
|
-- |
-- |
House Numbers (0)
04.05.2023 |
|
|
-- |
-- |
Mailbox (0)
04.03.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
02.15.2023 |
Sat, Feb 11. On site 2/11 |
|
-- |
-- |
Granite Installation (1)
03.22.2023 |
Wed, Mar 22 |
|
-- |
-- |
Interior Trim - Install (3)
02.25.2023 |
In process 2/22. Almost completed. |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
07.26.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1)
02.25.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
03.15.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0)
03.15.2023 |
|
|
-- |
-- |
Paint 2 (3)
03.01.2023 |
|
|
-- |
-- |
Cover Floors (1)
03.22.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
03.15.2023 |
|
|
-- |
-- |
Shoe Moulding (0)
03.18.2023 |
In process 3/15 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
04.23.2023 |
In process 4/19 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
04.20.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
03.16.2023 |
|
|
-- |
-- |
Set Water Meter (0)
04.27.2023 |
|
|
-- |
-- |
Electric Trim Out (3)
04.01.2023 |
Black Standard |
|
-- |
-- |
Ceiling Fans (0)
04.01.2023 |
|
|
-- |
-- |
HVAC Trim Out (1)
03.25.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2)
03.25.2023 |
Black Standard. In process 3/22 |
|
-- |
-- |
Install Appliances (0)
04.23.2023 |
In process 4/19 |
|
-- |
-- |
Paint 3 (2)
03.05.2023 |
|
|
-- |
-- |
Carpet (2)
03.15.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
06.22.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
04.26.2023 |
Tue, Apr 25 |
|
-- |
-- |
Inspection (Final Plumbing) (1)
04.26.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
04.26.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
04.26.2023 |
|
|
-- |
-- |
Pre Walk Through (0)
04.27.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
03.25.2023 |
In process 3/22 |
|
-- |
-- |
Cleaning (1)
04.27.2023 |
In process 4/26 |
|
-- |
-- |
Certificate of Occupancy (1)
05.07.2023 |
|
|
-- |
-- |
C.O. to Lender (0)
05.07.2023 |
|
|
-- |
-- |
Schedule Closing (0)
06.29.2023 |
|
|
-- |
-- |
Buyer Walk Through (1)
05.03.2023 |
|
|
-- |
-- |
Payment for Upgrades (0)
04.27.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
05.22.2023 |
|
|
-- |
-- |
Review Settlement Statement (0)
06.29.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
07.06.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
04.21.2023 |
|
|
-- |
-- |
Closing (1)
07.06.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
07.10.2023 |
|
|