37 ADDR
CONGERS-2 - 103  ::  1467 Palomino Trail
[ BUILD: 20221537 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Rate expires mid February
Large blemish front door Tom
Black shower drain needed Plumber
Remove extra drywall from basement bonus room Drywaller
Remove remote control for master ceiling fan Jill
Buried front gutter Tom
Clean out garage Jill
Install handrails and final touch up paint needed Trim
Door plugs needed in front and patio door Jill
CODED LOCKBOX 0103
Dishwasher needs anchored into cabinets CJ
House needs all shelving installed Mon, Apr 24
Repair landscaping between driveways from water meter repair Pettit
Attic cover needed 4/26 Push back in place
Glue in master bathroom shower Jill
Sand and paint spot on kitchen ceiling Painter
Clean out garge
Clean out garage Jill. They are going to be two electric meters sitting on top of the trashcan.
Touch up paint Painter
Microwave vented to exterior Cabinets need installed 5/17
Install screens Jill
Paint touch up throughout Painter
Replace white aluminum over front door Jeremy, Davenport
Plus screw holes
Adjust upstairs closet doors Jill
Leave paint for buyers Painter. I don’t see any on site. 5/3
Remove ladder from up closet
Tom to look at deck. Are boards too far apart??? Tom
Owners have applied more blue tape?
Paint touch up Painter
New amendment to include upgrade cost for LVP upstairs 5/16: sent to Kozhin
put cabinets back up Tom
Landscaping needed around recent repairs near electric meter Pettit
Hang microwave CJ
Adjust HVAC register on LVP so it goes down Jill
Clean scuff off of siding on side of townhouse Jill
Sand and paint top of half wall in living room at blemish Painter
Remove ditch witch
Missing stone on the side of the town
Missing a stone on the end of the townhouse Grizzly Stone
UPGRADES - COMPLETED
    White Kitchen Cabinetry  
    Level III Quartz Countertop in Kitchen  
    Farmhouse Sink  
    Three Drawer Stack Kitchen  
    White Bath vanity- up hallway only  
    Painted Steps to bedroom level  
    12 x 18 Deck  
    Digital Deadbolt, front door  
    Ship Lap Living Room Wall  
    Expanded Driveway  
    Microwave Vented to Exterior  
    LVP in up hallway and landing  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  05.21.2022    
-- -- $2500 Deposit Received (0)  05.21.2022    
-- -- Association Packet Requested (0)  05.21.2022    
-- -- Association Packet Received (0)  05.25.2022    
-- -- Selections Meeting (0)  06.08.2022    
-- -- Selections Sheet Signed (0)  06.14.2022     6/8/2022: sent to Kozhin for signatures;
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  07.17.2022     7/11/2022: sent to Jerry for signatures
-- -- Deposit For Upgrades Received (0)  07.11.2022    
-- -- Building Permit (30) *   08.15.2022    
-- -- Order Roof & Floor Trusses (1)  11.03.2022    
-- -- Order Windows & Doors (0)  11.03.2022    
-- -- Stake Out Home (1)  09.22.2022    
-- -- Excavate (2)  09.29.2022    
-- -- Inspection (Footers) (1)  09.29.2022    
-- -- Inspection (Concrete Wall) (1)  10.31.2022    
-- -- Pour Footers (1) *   09.29.2022    
-- -- Set Forms (2)  10.31.2022    
-- -- Pour Foundation Walls (1)  10.31.2022    
-- -- Plumb Slab (2)  10.31.2022    
-- -- Inspection (Plumbing Under Slab) (1)  10.31.2022    
-- -- Inspection (Conduit Under Slab) (1)  10.31.2022    
-- -- Prepare Slab (1)  10.31.2022    
-- -- Inspection (Slab) (1)  10.31.2022    
-- -- Inspection (Drain Tile) (0)  10.10.2022    
-- -- Pour Slab (1) *   11.03.2022    
-- -- Settlement Agent Confirmed (0)  03.21.2023    
-- -- Framing I (9)  11.17.2022    
-- -- Order Steps (0)  12.08.2022    
-- -- Order Tubs / Showers (0)  10.10.2022    
-- -- Framing II (8)  12.05.2022    
-- -- Framing III (8) *   12.07.2022    
-- -- Install Stairs (0) *   12.28.2022    
-- -- Windows & Doors (0) *   12.28.2022    
-- -- House Number and Status in Window (0)  01.02.2023    
-- -- Roofing (0) *   12.28.2022    
-- -- Order Cabinets (0)  12.30.2022    
-- -- Order Appliances (0)  08.30.2022     Standard SS
-- -- Deck (0)  01.07.2023     Expanded 12 x 18 Deck
-- -- Gutters (0)  03.15.2023    
-- -- Driveway (0) *   03.18.2023     Expanded Driveway
-- -- Patio (0)  02.25.2023     Standard
-- -- Privacy Divider / Fence (0) *   05.06.2023    
-- -- Sod / Seed / Landscaping (0)  04.23.2023     Needs sod 4/15
-- -- HVAC Rough In (4)  12.28.2022     In process 12/17
-- -- Plumbing Rough In (4)  01.04.2023     In process 1/1 Almost completed
-- -- Electric Rough In (4)  01.07.2023    
-- -- Inspection (Rough In HVAC) (1)  01.05.2023    
-- -- Inspection (Rough In Plumbing) (1)  01.05.2023    
-- -- Inspection (Rough In Electric) (1)  01.12.2023    
-- -- Inspection (Framing) (1) *   01.12.2023    
-- -- Inspection (Deck Piers) (0)  03.16.2023    
-- -- Exterior Vinyl (0) *   03.15.2023     in process 2/25
-- -- Exterior Stone (0)  03.29.2023     In process 3/25
-- -- Insulation (2) *   01.14.2023    
-- -- Inspection (Insulation) (1)  01.16.2023    
-- -- Inspection (Electric Service) (0)  04.06.2023    
-- -- Set Electric Meter (0) *   04.20.2023    
-- -- Inspection (Main Sewer Line) (0)  03.20.2023    
-- -- Inspection (Main Water Line) (0)  03.20.2023    
-- -- Order Interior Doors & Trim (0)  02.25.2023    
-- -- Drywall (Hang) (4) *   01.21.2023     NONE. In process 1/18
-- -- Loan Approval (0)  04.03.2023    
-- -- Deed Preparation (0)  04.03.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   02.01.2023     In process 1/28
-- -- Paint 1 (1)  02.04.2023    
-- -- Garage Door (0)  03.15.2023    
-- -- House Numbers (0)  04.05.2023    
-- -- Mailbox (0)  04.03.2023    
-- -- Cabinet Installation (2) *   02.15.2023     Sat, Feb 11. On site 2/11
-- -- Granite Installation (1) *   03.22.2023     Wed, Mar 22
-- -- Interior Trim - Install (3) *   02.25.2023     In process 2/22. Almost completed.
-- -- Order Plumbing / Lighting Fixtures (0)  07.26.2023    
-- -- Interior Trim - Paint (1)  02.25.2023    
-- -- Luxury Vinyl Plank (3) *   03.15.2023    
-- -- Luxury Vinyl Tile (0)  03.15.2023    
-- -- Paint 2 (3)  03.01.2023    
-- -- Cover Floors (0)  03.22.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  03.15.2023    
-- -- Shoe Moulding (0)  03.18.2023     In process 3/15
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   04.23.2023     In process 4/19
-- -- Install Coded Lockbox (add extra keys) (0)  04.20.2023    
-- -- Pay Water / Sewer Taps (0)  03.16.2023    
-- -- Set Water Meter (1) *   04.27.2023    
-- -- Electric Trim Out (3) *   04.01.2023     Black Standard
-- -- Ceiling Fans (0)  04.01.2023    
-- -- HVAC Trim Out (1) *   03.25.2023    
-- -- Plumbing Trim Out (2) *   03.25.2023     Black Standard. In process 3/22
-- -- Install Appliances (0) *   04.23.2023     In process 4/19
-- -- Paint 3 (2) *   03.05.2023    
-- -- Carpet (2)  03.15.2023    
-- -- Appraiser Confirms Construction Completion (0)  06.22.2023    
-- -- Inspection (Final HVAC) (0)  04.26.2023     Tue, Apr 25
-- -- Inspection (Final Plumbing) (0)  04.26.2023    
-- -- Inspection (Final Electric) (0)  04.26.2023    
-- -- Inspection (Final Building) (4) *   04.26.2023    
-- -- Pre Walk Through (0)  04.27.2023    
-- -- Stain Hardwood Stairs (1) *   03.25.2023     In process 3/22
-- -- Cleaning (1)  04.27.2023     In process 4/26
-- -- Certificate of Occupancy (1) *   05.07.2023    
-- -- C.O. to Lender (0)  05.07.2023    
-- -- Schedule Closing (0)  06.29.2023    
-- -- Buyer Walk Through (1) *   05.03.2023    
-- -- Payment for Upgrades (0)  04.27.2023    
-- -- Keys to Settlement Agent (0)  05.22.2023    
-- -- Review Settlement Statement (0)  06.29.2023    
-- -- Jerry Signs Closing Documents (0)  07.06.2023    
-- -- Request Trash Tote From POA Manager (0)  04.21.2023    
-- -- Closing (1)  07.06.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  07.10.2023