37 ADDR
CONGERS-2 - 27  ::  1464 Palomino Trail
[ BUILD: 20221529 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
    Order Plumbing / Lighting Fixtures (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Few window missing 2/11
Need vanity tops Will arrive soon
Few missing hardware in kitchen
Bow in wall by master bathroom vanity Tom
Cabinet crack under countertop, Jill, can you fix? Fred?
Drywall repair in master bath Drywaller
Drywall hole on upper stairwell Drywaller
Cover carpet
Needs receptacle cover near kitchen Electrician
Buyer out of town June 20 - July 6
Touch up paint near light switch in master bed Painter
Mirrors needed 5/20
Master shelving needs installed 5/20
Damaged refrigerator in garage CJ
Wrong color transition strip at main level stairs Denny
CODED LOCKBOX 2727
Trim, needed at exterior bonus room window Davenport
Drywall hole near stairwell Painter
Install patio doors and screens Kenny/Jill
Solution for gutter drain on back patio. Tom
Install patio door Tom
Railings needed all units Painter
Garage cable cover Jill or Tom
Install weatherstripping on doors Jill
Touch up paint In process
Paint touch up throughout home
Water pressure needs adjusted some Jill
Turn the sconces on the landing around to be facing down instead of up Electrician
Touch up paint needed Painter
Few cabinet Touchups
Finish touch up paint 7/12
Stain on granite Jill
Fix the corner of the kitchen window Jill
Fix the corner of the kitchen window
UPGRADES - COMPLETED
    Expanded Driveway  
    Expanded Patio 10 x 18  
    Garage Door Keypad  
    8 lb carpet pad  
    Shower Door with black Trim  
    Window in basement  
    Ceiling Fan in Living Room  
    Three Drawer Stack  
    Amendment to increase price by $6,620  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  09.20.2022    
-- -- $2500 Deposit Received (0)  09.25.2022    
-- -- Association Packet Requested (0)  09.20.2022    
-- -- Association Packet Received (0)  09.21.2022    
-- -- Selections Meeting (0)  10.01.2022    
-- -- Selections Sheet Signed (0)  10.04.2022     10/1/2022: sent to Pete for review;
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  10.12.2022     10/11: sent to Jerry for signatures
-- -- Deposit For Upgrades Received (0)  10.11.2022    
-- -- Building Permit (30) *   08.15.2022    
-- -- Order Roof & Floor Trusses (1)  11.03.2022    
-- -- Order Windows & Doors (0)  11.03.2022    
-- -- Stake Out Home (1)  09.26.2022    
-- -- Excavate (2)  09.29.2022    
-- -- Inspection (Footers) (1)  10.09.2022    
-- -- Inspection (Concrete Wall) (1)  10.09.2022    
-- -- Pour Footers (1) *   10.09.2022    
-- -- Set Forms (2)  10.31.2022    
-- -- Pour Foundation Walls (1)  11.03.2022    
-- -- Plumb Slab (2)  12.01.2022    
-- -- Inspection (Plumbing Under Slab) (1)  12.05.2022    
-- -- Inspection (Conduit Under Slab) (1)  12.08.2022    
-- -- Prepare Slab (1)  12.08.2022    
-- -- Inspection (Slab) (1)  12.27.2022    
-- -- Inspection (Drain Tile) (0)  12.27.2022    
-- -- Pour Slab (1) *   12.27.2022    
-- -- Settlement Agent Confirmed (0)  05.04.2023    
-- -- Framing I (9)  01.05.2023    
-- -- Order Steps (0)  02.02.2023    
-- -- Order Tubs / Showers (0)  02.02.2023    
-- -- Framing II (8)  01.12.2023    
-- -- Framing III (8) *   01.30.2023    
-- -- Install Stairs (0) *   02.02.2023    
-- -- Windows & Doors (0) *   02.18.2023    
-- -- House Number and Status in Window (0)  02.22.2023    
-- -- Roofing (0) *   02.18.2023    
-- -- Order Cabinets (0)  03.02.2023    
-- -- Order Appliances (0)  05.06.2023     Standard SS
-- -- Deck (0)  02.23.2023     NONE
-- -- Gutters (0)  04.11.2023    
-- -- Driveway (0) *   04.26.2023     Expanded Driveway
-- -- Patio (0)  03.08.2023     Expanded 10 x 18 Patio
-- -- Privacy Divider / Fence (0) *   06.11.2023    
-- -- Sod / Seed / Landscaping (0)  07.16.2023     Front and side yard need landscaping
-- -- HVAC Rough In (4)  02.15.2023     In process 2/11
-- -- Plumbing Rough In (4)  02.18.2023     In process 2/15. Almost complete.
-- -- Electric Rough In (4)  02.27.2023     In process 2/22
-- -- Inspection (Rough In HVAC) (1)  02.27.2023    
-- -- Inspection (Rough In Plumbing) (1)  02.27.2023    
-- -- Inspection (Rough In Electric) (1)  02.27.2023    
-- -- Inspection (Framing) (1) *   02.27.2023    
-- -- Inspection (Deck Piers) (0)  02.27.2023    
-- -- Exterior Vinyl (0) *   03.15.2023    
-- -- Exterior Stone (0)  04.19.2023    
-- -- Insulation (2) *   02.27.2023    
-- -- Inspection (Insulation) (1)  03.06.2023    
-- -- Inspection (Electric Service) (0)  06.12.2023     Fri, June 2
-- -- Set Electric Meter (0) *   06.16.2023    
-- -- Inspection (Main Sewer Line) (0)  03.20.2023    
-- -- Inspection (Main Water Line) (0)  03.20.2023    
-- -- Order Interior Doors & Trim (0)  04.12.2023    
-- -- Drywall (Hang) (4) *   03.08.2023     NONE. Stocked 3/5
-- -- Loan Approval (0)  04.27.2023    
-- -- Deed Preparation (0)  05.04.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.29.2023     In process 3/18
-- -- Paint 1 (1)  04.01.2023    
-- -- Garage Door (0)  04.23.2023    
-- -- House Numbers (0)  05.06.2023    
-- -- Mailbox (0)  05.20.2023    
-- -- Cabinet Installation (2) *   03.29.2023     Sat, April 1
-- -- Granite Installation (1) *   04.12.2023    
-- -- Interior Trim - Install (3) *   04.19.2023     In process 4/15
-- -- Interior Trim - Paint (1)  04.23.2023    
-- -- Luxury Vinyl Plank (3) *   04.26.2023    
-- -- Luxury Vinyl Tile (0)  04.29.2023    
-- -- Paint 2 (3)  04.05.2023    
-- -- Cover Floors (0)  05.06.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  04.27.2023    
-- -- Shoe Moulding (0)  05.03.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   05.20.2023     Still need shelving and mirrors 5/17
-- -- Install Coded Lockbox (add extra keys) (0)  05.17.2023    
-- -- Pay Water / Sewer Taps (0)  05.01.2023    
-- -- Set Water Meter (1) *   05.11.2023    
-- -- Electric Trim Out (3) *   05.10.2023     Black Lighting
-- -- Ceiling Fans (0)  05.10.2023    
-- -- HVAC Trim Out (1) *   05.10.2023    
-- -- Plumbing Trim Out (2) *   05.06.2023     Black Plumbing. In process 5/3
-- -- Install Appliances (0) *   05.10.2023    
-- -- Paint 3 (2) *   05.06.2023    
-- -- Carpet (2)  04.29.2023     In process 4/26
-- -- Appraiser Confirms Construction Completion (0)  06.26.2023    
-- -- Inspection (Final HVAC) (0)  06.26.2023    
-- -- Inspection (Final Plumbing) (0)  06.26.2023    
-- -- Inspection (Final Electric) (0)  06.26.2023    
-- -- Inspection (Final Building) (4) *   06.29.2023     Reinspect Tuesday June 27
-- -- Pre Walk Through (0)  06.26.2023    
-- -- Stain Hardwood Stairs (1) *   05.20.2023     In process 5/17
-- -- Cleaning (1)  07.01.2023    
-- -- Certificate of Occupancy (1) *   06.29.2023    
-- -- C.O. to Lender (0)  06.29.2023    
-- -- Schedule Closing (0)  07.13.2023    
-- -- Buyer Walk Through (1) *   07.01.2023     Fri, June 30, 10:00 AM
-- -- Payment for Upgrades (0)  06.26.2023    
-- -- Keys to Settlement Agent (0)  06.29.2023    
-- -- Review Settlement Statement (0)  07.13.2023    
-- -- Jerry Signs Closing Documents (0)  05.11.2023    
-- -- Request Trash Tote From POA Manager (0)  06.22.2023    
-- -- Closing (1)  07.17.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  07.17.2023