Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
Thu |
Nov 28 |
Order Plumbing / Lighting Fixtures (0) |
|
|
Thu |
Nov 28 |
Blower Door Test (1) |
|
|
|
-- |
-- |
Pile of insulation in master bedroom-ok to inspect? |
|
|
-- |
-- |
This garage back wall has a bump out. Does it matter? |
|
|
-- |
-- |
Master bath plumbing repair |
|
|
-- |
-- |
Appliances delivered April 19 |
|
|
-- |
-- |
Missing nickel hardware on master vanity |
Jill |
|
-- |
-- |
Drywall finishing needed on edge of banister to main level |
Needs sanding 5/17 |
|
-- |
-- |
Odd line on banister railing |
|
|
-- |
-- |
Would like to close by June 7 |
|
|
-- |
-- |
Trim needed side of kitchen island |
Tom |
|
-- |
-- |
Add trim on main level banister after drywall repairs completed |
|
|
-- |
-- |
Trim needed around basement window |
Exterior, Jeremy, Davenport |
|
-- |
-- |
Remove all black light fixtures that are supposed to be nickel |
|
|
-- |
-- |
Do not install toilet paper, hand towel or bath towel holders |
Leave them sitting in the bathrooms |
|
-- |
-- |
Needs dining chandelier |
Electrician |
|
-- |
-- |
Let cover laundry room needed |
Electrician |
|
-- |
-- |
Scratch on fridge-can we touch up |
6/19 - CJ will try the other color of touch up paint |
|
-- |
-- |
Missing dining chandelier, and electric cover in master bath |
Electrician |
|
-- |
-- |
Leave bathroom accessories in bathroom |
|
|
-- |
-- |
All electric covers need installed after touch up paint |
Electrician |
|
-- |
-- |
Lots of paint on upstairs flooring. Perhaps painters can clean up large spots? |
Painter |
|
-- |
-- |
CODED LOCKBOX 3030 |
|
|
-- |
-- |
Cover extra outlets installed by buyer |
|
|
-- |
-- |
Garage needs trim |
|
|
-- |
-- |
Needs silver tub drain |
Plumber |
|
-- |
-- |
screen door to patio is wonkie |
Tom |
|
-- |
-- |
one of the shelves in the fridge has a scratch on the bottom |
6/19 - Leisa will order a replacement shelf |
|
-- |
-- |
paint around the electrical panel in garage |
Painter |
|
-- |
-- |
the closet on the 1st level has a place that the painters missed |
Painter |
|
-- |
-- |
paint touch ups needed on the 1st stairwell |
Painter |
|
-- |
-- |
caulk both sides of the farmhouse sink |
Painter or Fred (Tom will look at it) |
|
-- |
-- |
is the spice rack supposed to be soft close like the other cabinets in the kitchen?? |
|
|
-- |
-- |
try to touch up the side of fridge where the tape pulled the paint off |
Jill will custom mix appliance repair paint |
|
-- |
-- |
touch up 2 of the cabinets in the kitchen |
Fred to order one (bottom pantry), Jill to touch up other |
|
-- |
-- |
push attic access panel down into place |
Jill |
|
-- |
-- |
sand place on the wall below the mirror in the master bathroom |
Painter |
|
-- |
-- |
caulk around the vent in the wall at the top of the second set of stairs. |
Painter |
|
-- |
-- |
touch up the paint in the bedroom closet (left room) |
Painter |
|
-- |
-- |
the piece of rubber/foam along the bottom of the garage door is messed up, it seems to be flat on one end of it. |
Davenport, Jeremy |
|
-- |
-- |
Two chips in the countertop in the kitchen |
Greg. One repair made-coming back for more repairs 7/6 |
|
-- |
-- |
|
|
|
-- |
-- |
trim moulding at sides of farmhouse sink |
Fred |
|
-- |
-- |
Replace kitchen drawer that is damaged above trash can |
Fred |
|
-- |
-- |
Replace door panel with damage |
Fred |
|
-- |
-- |
Ratified Contract? (0) 10.07.2022 |
|
|
-- |
-- |
$2500 Deposit Received (0) 10.12.2022 |
|
|
-- |
-- |
Association Packet Requested (0) 10.07.2022 |
|
|
-- |
-- |
Association Packet Received (0) 10.08.2022 |
|
|
-- |
-- |
Selections Meeting (0) 12.30.2022 |
|
|
-- |
-- |
Selections Sheet Signed (0) 02.03.2023 |
Sent to Brad on 12/30/2022 |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 02.11.2023 |
2/11: sent to Jerry for signature |
|
-- |
-- |
Deposit For Upgrades Received (0) 02.11.2023 |
|
|
-- |
-- |
Building Permit (30) 08.15.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 11.03.2022 |
|
|
-- |
-- |
Order Windows & Doors (0) 11.03.2022 |
|
|
-- |
-- |
Stake Out Home (1) 09.26.2022 |
|
|
-- |
-- |
Excavate (2) 09.29.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 10.09.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 10.09.2022 |
|
|
-- |
-- |
Pour Footers (1) 10.09.2022 |
|
|
-- |
-- |
Set Forms (2) 10.31.2022 |
|
|
-- |
-- |
Pour Foundation Walls (1) 11.03.2022 |
|
|
-- |
-- |
Plumb Slab (2) 12.01.2022 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 12.05.2022 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 12.08.2022 |
|
|
-- |
-- |
Prepare Slab (1) 12.08.2022 |
|
|
-- |
-- |
Inspection (Slab) (1) 12.27.2022 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.27.2022 |
|
|
-- |
-- |
Pour Slab (1) * 12.27.2022 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 05.16.2023 |
|
|
-- |
-- |
Framing I (9) 01.05.2023 |
|
|
-- |
-- |
Order Steps (0) 02.02.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 02.20.2023 |
|
|
-- |
-- |
Framing II (8) 01.12.2023 |
|
|
-- |
-- |
Framing III (8) * 01.31.2023 |
|
|
-- |
-- |
Install Stairs (0) 02.02.2023 |
|
|
-- |
-- |
Windows & Doors (0) 02.18.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 02.22.2023 |
|
|
-- |
-- |
Roofing (0) 02.20.2023 |
|
|
-- |
-- |
Order Cabinets (0) 03.02.2023 |
|
|
-- |
-- |
Order Appliances (0) 05.22.2023 |
French Upgrade |
|
-- |
-- |
Deck (0) 02.23.2023 |
|
|
-- |
-- |
Gutters (0) 04.03.2023 |
|
|
-- |
-- |
Driveway (0) 04.26.2023 |
|
|
-- |
-- |
Patio (0) 03.15.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 06.11.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 07.20.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 02.22.2023 |
In process 2/18 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 03.15.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 02.22.2023 |
In process 2/18 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 03.15.2023 |
|
|
-- |
-- |
Electric Rough In (4) 03.05.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 03.15.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 05.18.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 03.15.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 04.10.2023 |
|
|
-- |
-- |
Exterior Stone (0) 05.18.2023 |
In process 4/29 |
|
-- |
-- |
Insulation (2) 03.15.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 03.16.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 06.12.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 06.14.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 03.20.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 04.12.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 03.25.2023 |
Stocked 3/18 |
|
-- |
-- |
Loan Approval (0) 05.25.2023 |
|
|
-- |
-- |
Deed Preparation (0) 06.01.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 04.10.2023 |
In process 3/29 |
|
-- |
-- |
Paint 1 (1) 04.10.2023 |
|
|
-- |
-- |
Garage Door (0) 04.23.2023 |
|
|
-- |
-- |
House Numbers (0) 05.06.2023 |
|
|
-- |
-- |
Mailbox (0) 05.20.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 04.10.2023 |
Wed, Apr 5. In process 4/5 drywall doesn’t appear finished… |
|
-- |
-- |
Granite Installation (1) * 05.03.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 05.06.2023 |
In process 5/3 |
|
-- |
-- |
Interior Trim - Paint (1) 05.06.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 05.13.2023 |
In process 5/10 |
|
-- |
-- |
Luxury Vinyl Tile (0) 05.13.2023 |
|
|
-- |
-- |
Paint 2 (3) 04.23.2023 |
In process 4/19 |
|
-- |
-- |
Cover Floors (1) 05.28.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 04.27.2023 |
BN Standard |
|
-- |
-- |
Shoe Moulding (0) 05.20.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 06.03.2023 |
BN Accessories, in process 5/31 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 06.12.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 05.01.2023 |
|
|
-- |
-- |
Set Water Meter (0) 05.11.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 05.31.2023 |
BN Standard. In process 5/28 |
|
-- |
-- |
Ceiling Fans (0) 05.28.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 06.11.2023 |
Needs hvac covers |
|
-- |
-- |
Plumbing Trim Out (2) 05.20.2023 |
In process 5/17 |
|
-- |
-- |
Install Appliances (0) * 06.03.2023 |
French Delivery 5/11 |
|
-- |
-- |
Paint 3 (2) * 05.17.2023 |
|
|
-- |
-- |
Carpet (2) 05.20.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 06.21.2023 |
Jeff Eye |
|
-- |
-- |
Inspection (Final HVAC) (1) 06.16.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 06.16.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 06.16.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 06.16.2023 |
|
|
-- |
-- |
Pre Walk Through (0) 06.19.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 06.03.2023 |
In process 5/28 |
|
-- |
-- |
Cleaning (1) 06.21.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 06.20.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 06.20.2023 |
|
|
-- |
-- |
Schedule Closing (0) 06.21.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 06.19.2023 |
|
|
-- |
-- |
Payment for Upgrades (0) 06.19.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 06.21.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 06.22.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 06.23.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 06.22.2023 |
|
|
-- |
-- |
Closing (1) 06.26.2023 |
Cheryl Payne, Clark & Bradshaw |
|
-- |
-- |
Remove Coded Lockbox (0) 07.10.2023 |
|
|