| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| White kitchen cabinets | ||||
| Five piece drawer front | ||||
| Drawer stacks in base 36 and Island | ||||
| Double pull out trashcan | ||||
| Roll out trays and base 36 and pantry | ||||
| White bathroom cabinetry | ||||
| Master vanity - [2] VSD3035 | ||||
| French model refrigerator | ||||
| White fire clay farmhouse sink | ||||
| Level 3 Quartz kitchen countertops | ||||
| Oak treads to bedroom level | ||||
| Luxury vinyl plank on bedroom level | ||||
| Expanding patio 10 x 18 | ||||
| Expanded driveway | ||||
| Delete- master bath pantry nook wall (outlet on alternate wall TBD) | ||||
| Spice Rack in Base 9 | ||||
| Bonus Room Egress Window | ||||
| Amendment to increase price by $17,825 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 10.09.2022 | ||
| -- | -- | Inspection (Concrete Wall) (1) 10.09.2022 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 12.05.2022 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 12.08.2022 | ||
| -- | -- | Inspection (Slab) (1) 12.27.2022 | ||
| -- | -- | Inspection (Drain Tile) (0) 12.27.2022 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.15.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 03.15.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.15.2023 | ||
| -- | -- | Inspection (Framing) (1) * 03.15.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.18.2023 | ||
| -- | -- | Inspection (Insulation) (1) 03.16.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 06.12.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 03.20.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 03.20.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 06.16.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 06.16.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 06.16.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 06.16.2023 | ||