CONGERS-2 - 98  ::  1493 Palomino Trail
[ BUILD: 20221354 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
    Verify Window & Roof Structure (0)      
    Rough In Microwave Vent (0)      
Tue    Feb 3      Blower Door Test (1)      
TO DO - COMPLETED OR DELETED
Kate task notes have flipped cabinet colors but selections sheet has correct ones. Please confirm all is correct.
Countertops needed for the hall and master bathroom
Garage door Davenport
Kitchen faucet needs installed after counters
Large crack in kitchen ware granite was installed. Well, the oven cover it?
Cover carpet Jill
Missing hvac cover living room And in kitchen
Lightbulbs needed in dining chandelier Electrician
PAUSE CONSTRUCTION / REMOVE UPGRADES Buyer has not made deposit upgrade
Missing receptacle cover in the hall bathroom Electrician
Remove remote control that is hanging from ceiling fan Electrician
Trim, needed in garage Edgar, Trim
Mirrors needed Monday, May 8
CODED LOCKBOX 9898
Please cut down dead tree trunk in backyard Tom
Plug Screw holes in all doors Jill
Missing floor vent living room HVAC
That’s quick second to last carpeted stair to the third-floor
All mirrors to be installed Monday, May 8
Bedroom three closet doors to be adjusted Jill
Bad squeak in second to last step to third floor Denny
Carpet - is the color correct?
HVAC cover needed kitchen HVAC
Needs electric covers in garage Electrician
Needs electric covers in garage
Touchup needed in Selene living room
Touchup needed in ceiling of living room Painter
Touch up wood at bottom of staircase Painter
Weatherstripping needed Jill or Painter
Replacing ALL carpet Incorrect color installed- on order. Installing Thursday, June 8
Needs a lot of electrical covers Basically the entire house, electrician
Outdoor electric trim out needed Electrician - back deck outlet
Push bathroom fan into place Jill
Lots of paint on the steps from the basement to main level Painters-Jill following up
Buyer hesitancy to proceed to closing Scott is following up
Need bulbs in chandelier
Fridge to be hooked up Plug in
Sweep off deck
Install fire extinguisher
A few shallow scratches on the surface of island countertop behind sink Jill is coordinating a repair with Greg
Master shower has a small crack in the shower wall Jill
Pressure wash the bottom of house at patio and the patio too Jill
Paint touch up throughout home Painter
Missing hinge pin in the bedroom door to the left Tom
Missing hinge pin in the closet door in the bedroom to the right Tom
Guest bathroom has a crack in the shower wall In process 7/5
Guest bathroom has a crack in the shower wall
Touch up paint cans in here. Do they need to be distributed? Big box
Push attic cover into place Jill
Few paint touchups
Scratch on ceiling Painter
Scratch on ceiling
Lots of dead bugs in these lights
UPGRADES - COMPLETED
    12 x 18 Deck  
    Painted Cabinets ( White perimeter- Light Gray Island)  
    White Farmhouse sink  
    Double Trashcan  
    Expanded Driveway  
    Spice Rack in Base 9  
    Amendment to increase price by $6,630  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  12.13.2022    
-- -- $2500 Deposit Received (0)  12.20.2022    
-- -- Association Packet Requested (0)  12.13.2022     Requested 12/13
-- -- Association Packet Received (0)  12.15.2022    
-- -- Selections Meeting (0)  01.25.2023    
-- -- Selections Sheet Signed (0)  02.16.2023     2/7/2023: sent revised version to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  05.10.2023     2/16: buyer has signed, waiting on upgrade deposit
-- -- Deposit For Upgrades Received (0)  05.10.2023    
-- -- Building Permit (30) *   10.08.2022    
-- -- Order Roof & Floor Trusses (1)  11.03.2022    
-- -- Order Windows & Doors (0)  11.03.2022    
-- -- Stake Out Home (1)  10.06.2022    
-- -- Excavate (2)  10.06.2022    
-- -- Inspection (Footers) (1)  10.06.2022    
-- -- Inspection (Concrete Wall) (1)  11.10.2022    
-- -- Pour Footers (1) *   10.06.2022    
-- -- Set Forms (2)  11.10.2022    
-- -- Pour Foundation Walls (1)  11.10.2022    
-- -- Plumb Slab (2)  11.10.2022    
-- -- Inspection (Plumbing Under Slab) (1)  11.10.2022    
-- -- Inspection (Conduit Under Slab) (1)  11.10.2022    
-- -- Prepare Slab (1)  11.17.2022    
-- -- Inspection (Slab) (1)  11.19.2022    
-- -- Inspection (Drain Tile) (0)  12.27.2022    
-- -- Pour Slab (1) *   11.19.2022    
-- -- Settlement Agent Confirmed (0)  05.04.2023    
-- -- Framing I (9)  12.05.2022    
-- -- Order Steps (0)  01.12.2023    
-- -- Order Tubs / Showers (0)  01.12.2023    
-- -- Framing II (8)  12.27.2022    
-- -- Framing III (8) *   01.02.2023    
-- -- Install Stairs (0) *   01.12.2023    
-- -- Windows & Doors (0) *   01.12.2023    
-- -- House Number and Status in Window (0)  02.23.2023    
-- -- Roofing (0) *   01.12.2023    
-- -- Order Cabinets (0)  02.17.2023    
-- -- Order Appliances (0)  05.08.2023     Standard SS
-- -- Deck (0)  04.12.2023     In process 4/10
-- -- Gutters (0)  03.22.2023    
-- -- Driveway (0) *   04.05.2023    
-- -- Patio (0)  04.05.2023    
-- -- Privacy Divider / Fence (0) *   05.06.2023    
-- -- Sod / Seed / Landscaping (0)  06.03.2023    
-- -- HVAC Rough In (4)  01.07.2023    
-- -- Plumbing Rough In (4)  01.21.2023     In process 1/18
-- -- Electric Rough In (4)  02.01.2023    
-- -- Inspection (Rough In HVAC) (1)  02.10.2023    
-- -- Inspection (Rough In Plumbing) (1)  02.10.2023    
-- -- Inspection (Rough In Electric) (1)  02.10.2023    
-- -- Inspection (Framing) (1) *   02.10.2023    
-- -- Inspection (Deck Piers) (0)  04.11.2023    
-- -- Exterior Vinyl (0) *   03.22.2023    
-- -- Exterior Stone (0)  03.22.2023    
-- -- Insulation (2) *   02.13.2023     In process 2/11
-- -- Inspection (Insulation) (1)  02.13.2023    
-- -- Inspection (Electric Service) (0)  06.01.2023    
-- -- Set Electric Meter (0) *   06.16.2023    
-- -- Inspection (Main Sewer Line) (0)  03.20.2023    
-- -- Inspection (Main Water Line) (0)  03.20.2023    
-- -- Order Interior Doors & Trim (0)  04.10.2023    
-- -- Drywall (Hang) (4) *   02.18.2023    
-- -- Loan Approval (0)  06.01.2023    
-- -- Deed Preparation (0)  05.22.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.05.2023     In process 3/1
-- -- Paint 1 (1)  03.05.2023    
-- -- Garage Door (0)  04.23.2023    
-- -- House Numbers (0)  05.06.2023    
-- -- Mailbox (0)  05.06.2023    
-- -- Cabinet Installation (2) *   03.15.2023    
-- -- Granite Installation (1) *   04.19.2023    
-- -- Interior Trim - Install (3) *   04.01.2023     In process 3/31
-- -- Order Plumbing / Lighting Fixtures (0)  07.26.2023    
-- -- Interior Trim - Paint (1)  04.01.2023    
-- -- Luxury Vinyl Plank (3) *   04.12.2023     In process 4/10
-- -- Luxury Vinyl Tile (0)  04.15.2023    
-- -- Paint 2 (3)  03.22.2023     In process 3/15
-- -- Cover Floors (0)  05.20.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  04.11.2023    
-- -- Shoe Moulding (0)  04.23.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   05.06.2023     In process 5/6
-- -- Install Coded Lockbox (add extra keys) (0)  05.06.2023    
-- -- Pay Water / Sewer Taps (0)  05.01.2023    
-- -- Set Water Meter (1) *   05.11.2023    
-- -- Electric Trim Out (3) *   04.26.2023    
-- -- Ceiling Fans (0)  04.26.2023    
-- -- HVAC Trim Out (1) *   04.26.2023    
-- -- Plumbing Trim Out (2) *   04.15.2023    
-- -- Install Appliances (0) *   05.10.2023     Standard SS
-- -- Paint 3 (2) *   04.05.2023    
-- -- Carpet (2)  04.15.2023     In process 4/12
-- -- Appraiser Confirms Construction Completion (0)  06.29.2023    
-- -- Inspection (Final HVAC) (0)  06.21.2023    
-- -- Inspection (Final Plumbing) (0)  06.21.2023    
-- -- Inspection (Final Electric) (0)  06.21.2023    
-- -- Inspection (Final Building) (4) *   06.21.2023     June 21
-- -- Pre Walk Through (0)  05.22.2023    
-- -- Stain Hardwood Stairs (1) *   04.26.2023    
-- -- Cleaning (1)  06.28.2023    
-- -- Certificate of Occupancy (1) *   06.28.2023    
-- -- C.O. to Lender (0)  06.28.2023    
-- -- Schedule Closing (0)  07.27.2023    
-- -- Buyer Walk Through (1) *   07.01.2023     Friday, June 30, 1:00 PM
-- -- Payment for Upgrades (0)  06.26.2023    
-- -- Keys to Settlement Agent (0)  06.29.2023    
-- -- Review Settlement Statement (0)  07.27.2023    
-- -- Jerry Signs Closing Documents (0)  07.19.2023    
-- -- Request Trash Tote From POA Manager (0)  06.22.2023    
-- -- Closing (1)  07.27.2023     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  08.07.2023