37 ADDR
CONGERS-2 - 33  ::  1504 Palomino Trail
[ BUILD: 29221535 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Finish Bonus Room  
    Finish Bonus Bath  
    Expanded Driveway  
    Painted kitchen cabinetry ( White perimeter dark gray island)  
    Banquette seating (White)  
    White Farmhouse sink  
    Three Drawer Stack B36  
    Three Drawer Stack B18  
    Double Waste Basket  
    French Model Refrigerator  
    LVP Bonus Room  
    Painted Steps to Bedroom Level  
    Upgraded Carpet Pad  
    Added ceiling fan- larger spare bedroom  
    LVP in upstairs Hallway  
    Level 1 Quartz  
    Master Bath Vanity Upgrade wiht center drawer stack  
    Amendment to increase price by $29,405  
    Credit for 18” 3 drawer stack  
    Check payable to buyers  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  10.17.2022    
-- -- Inspection (Concrete Wall) (1)  11.10.2022     11/4/22
-- -- Inspection (Plumbing Under Slab) (1)  12.08.2022    
-- -- Inspection (Conduit Under Slab) (1)  12.08.2022    
-- -- Inspection (Slab) (1)  01.31.2023    
-- -- Inspection (Drain Tile) (0)  01.31.2023    
-- -- Inspection (Rough In HVAC) (1)  04.06.2023    
-- -- Inspection (Rough In Plumbing) (1)  04.06.2023    
-- -- Inspection (Rough In Electric) (1)  04.13.2023    
-- -- Inspection (Framing) (1) *   04.13.2023    
-- -- Inspection (Deck Piers) (0)  06.12.2023    
-- -- Inspection (Insulation) (1)  04.23.2023    
-- -- Inspection (Electric Service) (0)  06.28.2023    
-- -- Inspection (Main Sewer Line) (0)  03.20.2023    
-- -- Inspection (Main Water Line) (0)  03.20.2023    
-- -- Inspection (Final HVAC) (0)  07.19.2023    
-- -- Inspection (Final Plumbing) (0)  07.19.2023    
-- -- Inspection (Final Electric) (0)  07.19.2023    
-- -- Inspection (Final Building) (4) *   07.19.2023     Tuesday, July 18