Thu |
Nov 28 |
Verify Window & Roof Structure (0) |
|
|
Thu |
Nov 28 |
Rough In Microwave Vent (0) |
|
|
|
-- |
-- |
Will basement have deck or patio? |
Tell Scott |
|
-- |
-- |
Put drywall up in kitchen |
In process 6/14 |
|
-- |
-- |
Need signed selection sheet ASAP from Kozhin |
Scott following up |
|
-- |
-- |
add roof dormer |
|
|
-- |
-- |
Waiting On New Buyer |
|
|
-- |
-- |
Needs finished bonus/bath |
Drywall stocked 8/12 |
|
-- |
-- |
Remove black vinyl piece running along front |
Davenport |
|
-- |
-- |
Remove items in basement, so that drywall can be hung |
|
|
-- |
-- |
Oak treads are currently not installed. |
Not possible |
|
-- |
-- |
Single farmhouse sink in basement |
Double. |
|
-- |
-- |
Replace upper steps with oak steps |
|
|
-- |
-- |
Waiting on updated upgrade list from Kate, then new amendment |
|
|
-- |
-- |
Not really replacing steps - probably - stay tuned |
Extra steps in hallway |
|
-- |
-- |
Remove extra stairs |
|
|
-- |
-- |
Install piece of LVP in front of stairway |
|
|
-- |
-- |
Cover vanity and vanity top before drywall installation |
|
|
-- |
-- |
Install all hardware on kitchen |
Fred |
|
-- |
-- |
Hardware needed on all vanities |
Fred |
|
-- |
-- |
Broken light globe in her bathroom |
Hall bath - Jill |
|
-- |
-- |
Hall bath electric cover |
Electrician |
|
-- |
-- |
Beehive in front vent above garage |
Vent needs installed now |
|
-- |
-- |
Bonus bath vanity is in garage |
|
|
-- |
-- |
Range and microwave are in living room |
|
|
-- |
-- |
Install utility room door |
|
|
-- |
-- |
Painted stairs need second coat of paint |
Painter |
|
-- |
-- |
Needs doorbell installed |
Electrician |
|
-- |
-- |
Shoe molding needed on the landing on the upper stairwell |
George |
|
-- |
-- |
Vent flaps on vent above garage door |
Jill |
|
-- |
-- |
CODED LOCKBOX 9494 |
|
|
-- |
-- |
*basement photos only 8/30 as steps are being painted |
|
|
-- |
-- |
Needs weatherstripping at front door |
and garage - Jill |
|
-- |
-- |
Missing front window screen |
Jill |
|
-- |
-- |
Remove a few items from the garage |
Jill |
|
-- |
-- |
Glue and lots of scuff marks in this bathtub bonus bath |
|
|
-- |
-- |
Clean off back patio deck |
|
|
-- |
-- |
Trim on landing needs painted |
George |
|
-- |
-- |
Attic cover needed |
George |
|
-- |
-- |
Repaint, she mold, bonus room patio doors |
George |
|
-- |
-- |
Missing vanity hardware in bonus bath |
Tom and Jill |
|
-- |
-- |
Touch up clean bonus bath |
Jill |
|
-- |
-- |
Paint on luxury vinyl plank, bonus bath closet |
Jill |
|
-- |
-- |
Clean off globs of paint on bonus room, light switch as you’re entering the room |
Jill |
|
-- |
-- |
Need weatherstripping garage door |
|
|
-- |
-- |
Warped floor vent, right side of living room |
Jill |
|
-- |
-- |
Sweep off deck and remove nails |
Jill |
|
-- |
-- |
Risers need a second coat of white paint |
George |
|
-- |
-- |
Shoe mold on the stairs, needs to be filled and painted |
|
|
-- |
-- |
need an access panel |
|
|
-- |
-- |
Touch up, clean master shower |
Jill |
|
-- |
-- |
Touch up, clean master shower |
|
|
-- |
-- |
Pressure wash front of house |
|
|
-- |
-- |
Paint touch up |
|
|
-- |
-- |
Proper deck supports? |
|
|
-- |
-- |
Sod |
|
|
-- |
-- |
Stone behind townhouse |
|
|
-- |
-- |
Ratified Contract? (0) 04.11.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 04.15.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 04.11.2023 |
|
|
-- |
-- |
Association Packet Received (0) 04.13.2023 |
|
|
-- |
-- |
Selections Meeting (0) 05.04.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 07.01.2023 |
Waiting On New Buyer |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 08.04.2023 |
8/1: Sent to Jerry for signatures; |
|
-- |
-- |
Deposit For Upgrades Received (0) 08.04.2023 |
|
|
-- |
-- |
Building Permit (30) 11.07.2022 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 04.11.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 04.11.2023 |
|
|
-- |
-- |
Stake Out Home (1) 11.10.2022 |
|
|
-- |
-- |
Excavate (2) 11.10.2022 |
|
|
-- |
-- |
Inspection (Footers) (1) 11.10.2022 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 11.10.2022 |
|
|
-- |
-- |
Pour Footers (1) 11.10.2022 |
|
|
-- |
-- |
Set Forms (2) 01.31.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 01.31.2023 |
|
|
-- |
-- |
Plumb Slab (2) 01.31.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 02.10.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 03.02.2023 |
|
|
-- |
-- |
Prepare Slab (1) 03.02.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 03.02.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 03.02.2023 |
|
|
-- |
-- |
Pour Slab (1) * 03.02.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 08.07.2023 |
|
|
-- |
-- |
Framing I (9) 03.16.2023 |
|
|
-- |
-- |
Order Steps (0) 04.11.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 04.11.2023 |
|
|
-- |
-- |
Framing II (8) 03.23.2023 |
|
|
-- |
-- |
Framing III (8) * 03.30.2023 |
|
|
-- |
-- |
Install Stairs (0) 04.12.2023 |
|
|
-- |
-- |
Windows & Doors (0) 04.12.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 05.10.2023 |
|
|
-- |
-- |
Roofing (0) 04.12.2023 |
|
|
-- |
-- |
Order Cabinets (0) 07.01.2023 |
|
|
-- |
-- |
Order Appliances (0) 06.26.2023 |
|
|
-- |
-- |
Deck (0) 06.11.2023 |
|
|
-- |
-- |
Gutters (0) 06.14.2023 |
|
|
-- |
-- |
Driveway (0) 07.26.2023 |
|
|
-- |
-- |
Patio (0) 06.14.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 08.09.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 08.30.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 04.15.2023 |
In process 4/12 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 04.23.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 04.26.2023 |
In process 4/23 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 05.10.2023 |
|
|
-- |
-- |
Electric Rough In (4) 05.03.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 05.10.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 06.26.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 05.10.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 06.14.2023 |
|
|
-- |
-- |
Exterior Stone (0) 06.26.2023 |
|
|
-- |
-- |
Insulation (2) 05.10.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 05.13.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 07.10.2023 |
Fri, June 30 |
|
-- |
-- |
Set Electric Meter (0) 07.30.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 03.20.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 06.26.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 06.26.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 05.13.2023 |
|
|
-- |
-- |
Loan Approval (0) 08.28.2023 |
|
|
-- |
-- |
Deed Preparation (0) 08.28.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 06.14.2023 |
In process 5/31. Needs sanding. 6/7 |
|
-- |
-- |
Paint 1 (1) 06.28.2023 |
|
|
-- |
-- |
Garage Door (0) 06.26.2023 |
|
|
-- |
-- |
House Numbers (0) 07.12.2023 |
|
|
-- |
-- |
Mailbox (0) 07.01.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 07.30.2023 |
7/28. On site 7/26 |
|
-- |
-- |
Granite Installation (1) * 08.09.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 07.01.2023 |
In process 7/1 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 07.26.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 07.19.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 07.19.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 07.19.2023 |
|
|
-- |
-- |
Paint 2 (3) 07.19.2023 |
|
|
-- |
-- |
Cover Floors (1) 08.12.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 07.03.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 08.23.2023 |
In process 8/16 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 09.06.2023 |
Joe |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 08.30.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 07.17.2023 |
|
|
-- |
-- |
Set Water Meter (0) 07.30.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 09.01.2023 |
Completed except bonus room |
|
-- |
-- |
Ceiling Fans (0) 08.02.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 08.05.2023 |
|
|
-- |
-- |
Blower Door Test (1) 10.27.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 08.16.2023 |
In process 8/12 |
|
-- |
-- |
Install Appliances (0) * 08.26.2023 |
|
|
-- |
-- |
Paint 3 (2) * 08.30.2023 |
In process 8/16 |
|
-- |
-- |
Carpet (2) 08.05.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 08.31.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 09.01.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 09.01.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 09.01.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 09.01.2023 |
Fri, Sept 1 |
|
-- |
-- |
Pre Walk Through (0) 09.05.2023 |
Completed by Kate |
|
-- |
-- |
Stain Hardwood Stairs (1) 09.03.2023 |
In process 8/30 |
|
-- |
-- |
Cleaning (1) 09.05.2023 |
In process 8/3 |
|
-- |
-- |
Certificate of Occupancy (1) * 09.01.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 09.01.2023 |
|
|
-- |
-- |
Schedule Closing (0) 09.25.2023 |
buyer returns Sep 12 |
|
-- |
-- |
Buyer Walk Through (1) 09.11.2023 |
Thu, Sep 7 |
|
-- |
-- |
Payment for Upgrades (0) 08.31.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 09.01.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 09.19.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 09.20.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 08.10.2023 |
|
|
-- |
-- |
Closing (1) 09.27.2023 |
Brittany @ West View Title (week of Sep 25) |
|
-- |
-- |
Remove Coded Lockbox (0) 09.28.2023 |
|
|