37 ADDR
CONGERS-2 - 94  ::  1515 Palomino Trail
[ BUILD: 20221358 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
---
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Microwave vented to exterior  
    Expanded 12 x 18 Deck  
    New Price of $316,430 includes cost of expanded 12x18 deck and vented microwave  
    Finish bonus room  
    Finished bonus bath  
    Expanded driveway  
    Luxury vinyl plank, bonus room  
    Luxury, vinyl plank, upstairs, hallway, and bedrooms  
    White painted kitchen cabinetry  
    Double wastebasket in island  
    Eggshell paint  
    Painted steps to bedroom level  
    Amendment to increase price by $25,220  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  11.10.2022    
-- -- Inspection (Concrete Wall) (1)  11.10.2022    
-- -- Inspection (Plumbing Under Slab) (1)  02.10.2023    
-- -- Inspection (Conduit Under Slab) (1)  03.02.2023    
-- -- Inspection (Slab) (1)  03.02.2023    
-- -- Inspection (Drain Tile) (0)  03.02.2023    
-- -- Inspection (Rough In HVAC) (1)  04.23.2023    
-- -- Inspection (Rough In Plumbing) (1)  05.10.2023    
-- -- Inspection (Rough In Electric) (1)  05.10.2023    
-- -- Inspection (Framing) (1) *   05.10.2023    
-- -- Inspection (Deck Piers) (0)  06.26.2023    
-- -- Inspection (Insulation) (1)  05.13.2023    
-- -- Inspection (Electric Service) (0)  07.10.2023     Fri, June 30
-- -- Inspection (Main Sewer Line) (0)  03.20.2023    
-- -- Inspection (Main Water Line) (0)  06.26.2023    
-- -- Inspection (Final HVAC) (0)  09.01.2023    
-- -- Inspection (Final Plumbing) (0)  09.01.2023    
-- -- Inspection (Final Electric) (0)  09.01.2023    
-- -- Inspection (Final Building) (4) *   09.01.2023     Fri, Sept 1