Tom - Can we install oak treads to bedroom level? |
|
|
-- |
-- |
Remove drywall to vent microwave |
In process 10/7 |
|
-- |
-- |
Home Sold on October 30? |
|
|
-- |
-- |
New Deck |
|
|
-- |
-- |
Drywall bonus bath |
Drywaller |
|
-- |
-- |
Finish drywall repair in kitchen |
Needs sanding 10/21 |
|
-- |
-- |
Needs selection sheet on bcp please :) |
|
|
-- |
-- |
Change out hinges |
Jill. In process 11/12 |
|
-- |
-- |
Kitchen cabinets missing some hardware |
Mon, Nov 27 |
|
-- |
-- |
Gap on granite |
Side splash -has been ordered and will be installed |
|
-- |
-- |
House needs pale oak paint color in many places |
Painter |
|
-- |
-- |
Basement bath needs final sanding 11/1 |
Painter |
|
-- |
-- |
Cover carpet asap |
|
|
-- |
-- |
Patch crack in basement floor |
Tom |
|
-- |
-- |
Sand and repaint kitchen ceiling |
Painter 11!28 |
|
-- |
-- |
Make sure paint is eggshell |
Painter |
|
-- |
-- |
Cover outside outlet |
Electrician |
|
-- |
-- |
Electric trimout needed in basement furnace bathroom |
|
|
-- |
-- |
Basement bonus bathroom needs electric trim out |
Electrician |
|
-- |
-- |
Electric outlet needed on back patio |
Electrician |
|
-- |
-- |
Gap in granite countertop |
|
|
-- |
-- |
Electric covers needed in a few places upstairs |
Electrician |
|
-- |
-- |
Needs another coat of paint in a few large places. This changed color. |
Especially near where the walls meet the ceiling |
|
-- |
-- |
CODED LOCKBOX 8787 |
|
|
-- |
-- |
CODED LOCKBOX 8787 |
|
|
-- |
-- |
Various siding issues on the deck |
Davenport. Repairing 11/28 |
|
-- |
-- |
Extra dishwasher in kitchen |
Jill |
|
-- |
-- |
Multiple upstairs hinges are still black |
Jill |
|
-- |
-- |
Patch showerhead hole in master |
Painter |
|
-- |
-- |
Crooked, vanity, light, and basement bathroom |
Electrician |
|
-- |
-- |
Basement bathroom needs a mirror |
Paul |
|
-- |
-- |
Light cover, needed, and basement bathroom |
Electrician |
|
-- |
-- |
Door knob and silver hinges needed in basement bathroom |
Paul |
|
-- |
-- |
Adjust upstairs closet doors |
Jill |
|
-- |
-- |
Pressure wash house 11/29 |
Buddy |
|
-- |
-- |
Remove chandelier from closet |
|
|
-- |
-- |
Install screen door |
Buddy |
|
-- |
-- |
Paint bathroom door in basement |
Painter |
|
-- |
-- |
Lots of concrete splashing here as well on back patio |
Buddy - power wash |
|
-- |
-- |
Nail inside panel of island |
Jill |
|
-- |
-- |
Dent in powder bath to be filled and sanded painted |
Painter |
|
-- |
-- |
Sand and paint again ceiling in kitchen |
Painter |
|
-- |
-- |
Small orange residue on hall bath - needs razor??? |
Jill |
|
-- |
-- |
Dry wall patch escutcheon master bathroom |
Painter |
|
-- |
-- |
Clean off back patio |
Lynn |
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
A few items in the closet, including the hinges in one of the smaller bedrooms are black |
|
|
-- |
-- |
Paint, attic access |
|
|
-- |
-- |
Cable box needs cover |
|
|
-- |
-- |
Extra shelving sitting in the hall closet |
|
|
-- |
-- |
Few closet hinges are still black |
Jill |
|
-- |
-- |
Molding in front of bonus room tub |
George |
|
-- |
-- |
Shoe for bonus vanity needed |
George |
|
-- |
-- |
Adjust lock patio door |
Paul |
|
-- |
-- |
Raise dining room chandelier to match the height of pendant lights |
Electrician |
|
-- |
-- |
Upstairs right side bedroom closet door won’t stay open |
Tom |
|
-- |
-- |
Small Nick in upstairs, shower wall and in bonus bathtub |
Jill called tub repair people |
|
-- |
-- |
Where is radon pipe located? |
Courtney will tell Kate it is not there but could be added |
|
-- |
-- |
Three way light switches at bottom of stairs need to be rearranged. As noted on tape on wall. |
Electrician |
|
-- |
-- |
What to do about snap lights not wired on left side of living room- very very dark at night.??? |
Courtney will update Kate |
|
-- |
-- |
Upstairs hardware switched to brush, nickel, in several places |
Courtney will ask Kate what she meant |
|
-- |
-- |
Extend flashing in front exterior corner |
Davenport |
|
-- |
-- |
Install window screens and sliding screen door |
Jill |
|
-- |
-- |
Master bathroom door does not close |
Jill or Paul |
|
-- |
-- |
Paint tops of all doors |
Painter |
|
-- |
-- |
Upstairs hall bath, shower valve does not produce hot water |
Plumber, Mazur |
|
-- |
-- |
Upstairs hall, bath tub, spout, crooked |
Plumber, Mazur |
|
-- |
-- |
One piece of missing insulation on basement wall |
Tom |
|
-- |
-- |
Small crack at the top of one of the upstairs bedroom doors |
Painter |
|
-- |
-- |
Finish trash screen |
Tom |
|
-- |
-- |
Make sure paint is left for touchup as well as black stair paint |
Painter |
|
-- |
-- |
Screens |
Jill |
|
-- |
-- |
Staining on basement floor |
|
|
-- |
-- |
Glo Fiber |
Jill - will call Danny |
|
-- |
-- |
Granite Side Splash needed |
working on scheduling with homeowner |
|
-- |
-- |
Concern about drainage behind townhouses |
|
|
-- |
-- |
Ratified Contract? (0) 09.25.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 09.26.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 09.25.2023 |
|
|
-- |
-- |
Association Packet Received (0) 09.30.2023 |
|
|
-- |
-- |
Selections Meeting (0) 09.27.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 10.23.2023 |
10/4: Sent to Nina; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 10.11.2023 |
10/10: Sent to Jerry |
|
-- |
-- |
Deposit For Upgrades Received (0) 11.09.2023 |
|
|
-- |
-- |
Building Permit (30) 05.05.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 06.26.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 06.26.2023 |
|
|
-- |
-- |
Stake Out Home (1) 05.18.2023 |
|
|
-- |
-- |
Excavate (2) 05.18.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 05.18.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 05.18.2023 |
|
|
-- |
-- |
Pour Footers (1) 05.18.2023 |
|
|
-- |
-- |
Set Forms (2) 06.01.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 06.01.2023 |
|
|
-- |
-- |
Plumb Slab (2) 06.12.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 06.12.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 06.19.2023 |
|
|
-- |
-- |
Prepare Slab (1) 06.12.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 06.19.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 06.19.2023 |
|
|
-- |
-- |
Pour Slab (1) * 06.19.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 10.13.2023 |
|
|
-- |
-- |
Framing I (9) 07.02.2023 |
|
|
-- |
-- |
Order Steps (0) 07.24.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 08.03.2023 |
|
|
-- |
-- |
Framing II (8) 07.17.2023 |
|
|
-- |
-- |
Framing III (8) * 07.31.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.11.2023 |
|
|
-- |
-- |
Install Stairs (0) 07.31.2023 |
|
|
-- |
-- |
Windows & Doors (0) 08.03.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 08.30.2023 |
|
|
-- |
-- |
Roofing (0) 08.03.2023 |
|
|
-- |
-- |
Order Cabinets (0) 10.23.2023 |
|
|
-- |
-- |
Order Appliances (0) 09.11.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0) 08.23.2023 |
|
|
-- |
-- |
Gutters (0) 10.12.2023 |
|
|
-- |
-- |
Driveway (0) 11.01.2023 |
|
|
-- |
-- |
Patio (0) 10.28.2023 |
|
|
-- |
-- |
Privacy Divider / Fence (0) 11.12.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 11.08.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 08.26.2023 |
In process 8/23 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 09.06.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 08.26.2023 |
In process 8/19 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.06.2023 |
|
|
-- |
-- |
Electric Rough In (4) 09.03.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.06.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 10.12.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.10.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 10.12.2023 |
in process 10/4 |
|
-- |
-- |
Exterior Stone (0) 10.12.2023 |
|
|
-- |
-- |
Insulation (2) 09.06.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 09.16.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.28.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 11.13.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 10.05.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 10.05.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 10.05.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 09.20.2023 |
In process 9/16 |
|
-- |
-- |
Loan Approval (0) 10.30.2023 |
|
|
-- |
-- |
Deed Preparation (0) 10.19.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 10.07.2023 |
In process 10/4 |
|
-- |
-- |
Paint 1 (1) 10.07.2023 |
|
|
-- |
-- |
Garage Door (0) 09.03.2023 |
|
|
-- |
-- |
House Numbers (0) 11.04.2023 |
|
|
-- |
-- |
Mailbox (0) 11.04.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 10.28.2023 |
10/24 |
|
-- |
-- |
Granite Installation (1) * 11.01.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 10.14.2023 |
In process 10/11 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 10.16.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 10.18.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 11.04.2023 |
|
|
-- |
-- |
Luxury Vinyl Tile (0) 11.04.2023 |
|
|
-- |
-- |
Paint 2 (3) 11.06.2023 |
|
|
-- |
-- |
Cover Floors (1) 11.04.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 11.13.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 11.08.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 11.25.2023 |
BN accessories, door hardware BN |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 11.16.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 10.16.2023 |
|
|
-- |
-- |
Set Water Meter (0) 10.26.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 11.12.2023 |
In process 11/8 |
|
-- |
-- |
Ceiling Fans (0) 11.12.2023 |
|
|
-- |
-- |
HVAC Trim Out (1) 11.12.2023 |
|
|
-- |
-- |
Blower Door Test (1) 11.20.2023 |
|
|
-- |
-- |
Plumbing Trim Out (2) 11.20.2023 |
In process 11/15 |
|
-- |
-- |
Install Appliances (0) * 11.25.2023 |
|
|
-- |
-- |
Paint 3 (2) * 11.25.2023 |
|
|
-- |
-- |
Carpet (2) 11.04.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 12.06.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 11.30.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 11.30.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 11.30.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 12.04.2023 |
Reinspect, Mon, Dec 4 |
|
-- |
-- |
Pre Walk Through (0) 11.30.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 11.30.2023 |
In process of painting 11/25 |
|
-- |
-- |
Cleaning (1) 12.03.2023 |
In process 12/29 |
|
-- |
-- |
Certificate of Occupancy (1) * 12.06.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 12.06.2023 |
|
|
-- |
-- |
Schedule Closing (0) 12.06.2023 |
Tuesday, Dec 5, 2:00 PM |
|
-- |
-- |
Buyer Walk Through (1) 12.03.2023 |
Friday, Dec 1, 4:30 PM |
|
-- |
-- |
Payment for Upgrades (0) 12.01.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 11.28.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 11.29.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 11.28.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 11.21.2023 |
|
|
-- |
-- |
Closing (1) 12.06.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 01.02.2024 |
|
|