| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finish Bonus Bath | ||||
| Expanded Deck 12 x 18 | ||||
| Expanded 10 x 10 Patio | ||||
| Change Door hardware to BN | ||||
| Three Drawer Stack in place of B36 | ||||
| Digital Deadbolt | ||||
| Microwave vented to Exterior | ||||
| Eggshell Paint | ||||
| 8 lb carpet pad Upper level | ||||
| Painted Steps to Bedroom Level | ||||
| 30% Discount on $15,690 of upgrades | ||||
| Amendment to increase price by $10,983 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 05.18.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 05.18.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 06.12.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 06.19.2023 | ||
| -- | -- | Inspection (Slab) (1) 06.19.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 06.19.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 09.06.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 09.06.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 09.06.2023 | ||
| -- | -- | Inspection (Framing) (1) * 09.10.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 10.12.2023 | ||
| -- | -- | Inspection (Insulation) (1) 09.16.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 09.28.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 10.05.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 10.05.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 11.30.2023 | ||
| -- | -- | Inspection (Final Plumbing) (0) 11.30.2023 | ||
| -- | -- | Inspection (Final Electric) (0) 11.30.2023 | ||
| -- | -- | Inspection (Final Building) (4) * 12.04.2023 | Reinspect, Mon, Dec 4 | |