Oak stairs in hallway |
|
|
-- |
-- |
Can we move screens? |
|
|
-- |
-- |
Remove set of steps in kitchen |
|
|
-- |
-- |
Needs hardware in half of kitchen |
|
|
-- |
-- |
Complete front porch overhang |
|
|
-- |
-- |
Finish lvp on landing |
|
|
-- |
-- |
Is carpet needed on the steps going to the basement level? |
|
|
-- |
-- |
Install carpet on steps to basement |
Denny |
|
-- |
-- |
Faucet needed basement tub |
|
|
-- |
-- |
Faucet needed basement tub |
|
|
-- |
-- |
Electric stone piece needed on front of house |
Stone guys |
|
-- |
-- |
Fan is in non window room~ correct? |
|
|
-- |
-- |
HVAC cover needed in family room |
HVAC |
|
-- |
-- |
Thermostat |
|
|
-- |
-- |
Black shower drain needed |
|
|
-- |
-- |
Complete installation of black bath tub accessories in hall bath |
|
|
-- |
-- |
Remove extra shingles on roof |
|
|
-- |
-- |
Front splash block needed |
Tom |
|
-- |
-- |
Doorbell needed |
Electrician |
|
-- |
-- |
Micro vent works- but barely |
Tom |
|
-- |
-- |
Drywall repair near front door |
Painter |
|
-- |
-- |
Attic cover |
Paint it 11/15 |
|
-- |
-- |
White boards below doors needed here |
|
|
-- |
-- |
CODED LOCKBOX 8989 |
|
|
-- |
-- |
Home Inspection - Monday, Nov 20, 1PM |
|
|
-- |
-- |
Electric trimout needed on the front electric outlet |
Electrician |
|
-- |
-- |
Install handrails |
|
|
-- |
-- |
Needs water valve cover |
Tom |
|
-- |
-- |
Sand and paint drywall patch by the front door |
Painter |
|
-- |
-- |
Clean off paint overspray on hardware and pantry cabinet |
Painter |
|
-- |
-- |
Repaint both handrails going down to basement |
Painter |
|
-- |
-- |
Drywall patch in basement family room where water cut office |
|
|
-- |
-- |
Small drywall patch under escutcheon at showerhead in basement |
Painter |
|
-- |
-- |
Paint, touchup, both handrails going to bedroom level |
Painter |
|
-- |
-- |
Take covers off of smoke alarms |
Jill |
|
-- |
-- |
Remove blue tape and drywall mud from tub shower |
Lynn, Jill |
|
-- |
-- |
Paint, attic, access, panel |
Painter. Reminded 11/29 |
|
-- |
-- |
Crack to be fixed in master shower |
Jill |
|
-- |
-- |
Damaged outlet at dining area where one hole is blocked |
Electrician |
|
-- |
-- |
Tighten loose screw on front spigot |
|
|
-- |
-- |
Replace loose screw on front spigot |
|
|
-- |
-- |
Fix incorrectly installed nail at ridge shingle |
Roofer - Joel |
|
-- |
-- |
Repair raised shingle at rear ridge vent |
Roofer - Joel |
|
-- |
-- |
Flashing is not installed where front roof support beams connect to home |
Davenport |
|
-- |
-- |
Install missing support leg under range |
Courtney |
|
-- |
-- |
Add support bracket to basement step handrail |
|
|
-- |
-- |
Install missing switch plate at right of front door |
Electrician |
|
-- |
-- |
Secure front downspouts at the bottom |
Davenport |
|
-- |
-- |
Install window screens |
Kristen |
|
-- |
-- |
door jam |
|
|
-- |
-- |
Basement door jambs are primed but not painted |
|
|
-- |
-- |
Repair brick molding at left side of basement door |
This has been completed. Are we OK with the final repair? |
|
-- |
-- |
Needs cable cover installed |
Electrician |
|
-- |
-- |
|
|
|
-- |
-- |
Re-clean living room, and kitchen before final walk-through |
Lynn |
|
-- |
-- |
Make sure bottom outlet in dining nook is working |
Tom |
|
-- |
-- |
Have a contractor install Z flashing. |
Davenport - front support beams connect to home |
|
-- |
-- |
One shingle is Raised at rear ridge vent |
Joel |
|
-- |
-- |
One nail incorrectly installed at Ridge shingle |
Joel |
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
Hole near driveway? |
|
|
-- |
-- |
Trash can hider |
|
|
-- |
-- |
Ratified Contract? (0)
06.06.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0)
06.09.2023 |
|
|
-- |
-- |
Association Packet Requested (0)
06.06.2023 |
|
|
-- |
-- |
Association Packet Received (0)
06.09.2023 |
|
|
-- |
-- |
Selections Meeting (0)
07.22.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0)
08.02.2023 |
7/31: sent to Logan for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
08.15.2023 |
8/3: Signed, waiting on deposit; |
|
-- |
-- |
Deposit For Upgrades Received (0)
08.15.2023 |
Will be made after Jerry signs the amendment |
|
-- |
-- |
Building Permit (30)
05.05.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
06.26.2023 |
|
|
-- |
-- |
Order Windows & Doors (0)
06.26.2023 |
|
|
-- |
-- |
Stake Out Home (1)
05.18.2023 |
|
|
-- |
-- |
Excavate (2)
05.18.2023 |
|
|
-- |
-- |
Inspection (Footers) (1)
05.18.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
05.18.2023 |
|
|
-- |
-- |
Pour Footers (1)
05.18.2023 |
|
|
-- |
-- |
Set Forms (2)
06.01.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1)
06.01.2023 |
|
|
-- |
-- |
Plumb Slab (2)
06.12.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
06.12.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
06.12.2023 |
|
|
-- |
-- |
Prepare Slab (1)
06.12.2023 |
|
|
-- |
-- |
Inspection (Slab) (1)
06.12.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
06.19.2023 |
|
|
-- |
-- |
Pour Slab (1)
06.12.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
06.07.2023 |
|
|
-- |
-- |
Framing I (9)
07.02.2023 |
|
|
-- |
-- |
Order Steps (0)
08.03.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0)
08.03.2023 |
|
|
-- |
-- |
Framing II (8)
07.17.2023 |
|
|
-- |
-- |
Framing III (8)
08.03.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
12.11.2023 |
|
|
-- |
-- |
Install Stairs (0)
08.23.2023 |
|
|
-- |
-- |
Windows & Doors (0)
08.03.2023 |
|
|
-- |
-- |
House Number and Status in Window (0)
08.30.2023 |
|
|
-- |
-- |
Roofing (0)
08.03.2023 |
|
|
-- |
-- |
Order Cabinets (0)
08.08.2023 |
|
|
-- |
-- |
Order Appliances (0)
09.11.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0)
08.26.2023 |
|
|
-- |
-- |
Gutters (0)
10.12.2023 |
|
|
-- |
-- |
Driveway (0)
10.28.2023 |
NO UPGRADE |
|
-- |
-- |
Patio (0)
10.28.2023 |
NO UPGRADE |
|
-- |
-- |
Privacy Divider / Fence (0)
11.12.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
11.04.2023 |
|
|
-- |
-- |
HVAC Rough In (4)
08.23.2023 |
in process 8/9 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
09.03.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4)
08.23.2023 |
In process 8/23 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
09.03.2023 |
|
|
-- |
-- |
Electric Rough In (4)
08.26.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
09.03.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
10.12.2023 |
|
|
-- |
-- |
Inspection (Framing) (1)
09.08.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
10.07.2023 |
in process 10/4 |
|
-- |
-- |
Exterior Stone (0)
10.12.2023 |
|
|
-- |
-- |
Insulation (2)
09.03.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1)
09.05.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
09.28.2023 |
|
|
-- |
-- |
Set Electric Meter (0)
11.09.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
10.05.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
10.05.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
10.04.2023 |
|
|
-- |
-- |
Drywall (Hang) (4)
09.13.2023 |
In process 9/10, Bonus Room Bonus Bath |
|
-- |
-- |
Loan Approval (0)
10.23.2023 |
|
|
-- |
-- |
Deed Preparation (0)
10.19.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
09.23.2023 |
In process 9/20 |
|
-- |
-- |
Paint 1 (1)
09.23.2023 |
|
|
-- |
-- |
Garage Door (0)
09.03.2023 |
|
|
-- |
-- |
House Numbers (0)
11.08.2023 |
|
|
-- |
-- |
Mailbox (0)
11.04.2023 |
|
|
-- |
-- |
Cabinet Installation (2)
09.27.2023 |
9/19 |
|
-- |
-- |
Granite Installation (1)
10.04.2023 |
|
|
-- |
-- |
Interior Trim - Install (3)
09.30.2023 |
In process 9/27 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
10.16.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1)
10.04.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
10.21.2023 |
In process 10/18 |
|
-- |
-- |
Luxury Vinyl Tile (0)
10.14.2023 |
In process. Needed in basement bath 10/11 |
|
-- |
-- |
Paint 2 (3)
10.07.2023 |
|
|
-- |
-- |
Cover Floors (1)
11.01.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
10.23.2023 |
|
|
-- |
-- |
Shoe Moulding (0)
10.18.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
11.08.2023 |
Shelving is in |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
11.13.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
10.16.2023 |
|
|
-- |
-- |
Set Water Meter (0)
11.09.2023 |
|
|
-- |
-- |
Electric Trim Out (3)
11.12.2023 |
BLACK. In process. 11/4 |
|
-- |
-- |
Ceiling Fans (0)
11.04.2023 |
Master Bedroom, Basement Family Room |
|
-- |
-- |
HVAC Trim Out (1)
11.08.2023 |
|
|
-- |
-- |
Blower Door Test (1)
11.20.2023 |
Fri, Nov 17 |
|
-- |
-- |
Plumbing Trim Out (2)
11.08.2023 |
BLACK. In process 11/4. Munzer is here. |
|
-- |
-- |
Install Appliances (0)
10.25.2023 |
On site 10/18 |
|
-- |
-- |
Paint 3 (2)
10.11.2023 |
|
|
-- |
-- |
Carpet (2)
10.21.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
11.20.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
11.21.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
11.21.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
11.21.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2)
11.21.2023 |
Tue, Nov 21 |
|
-- |
-- |
Pre Walk Through (0)
11.20.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
11.15.2023 |
In process 11/12 |
|
-- |
-- |
Cleaning (1)
11.25.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1)
11.28.2023 |
|
|
-- |
-- |
C.O. to Lender (0)
11.28.2023 |
|
|
-- |
-- |
Schedule Closing (0)
12.06.2023 |
|
|
-- |
-- |
Buyer Walk Through (1)
12.08.2023 |
|
|
-- |
-- |
Payment for Upgrades (0)
11.30.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
11.28.2023 |
|
|
-- |
-- |
Review Settlement Statement (0)
12.08.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
11.28.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
11.21.2023 |
|
|
-- |
-- |
Closing (1)
12.08.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
12.13.2023 |
|
|