Wiring issue - outside outlets |
Zilda at FREG, 540-434-2400 |
|
-- |
-- |
Wrong receptacles are installed outside, supposed to heave GFCI receptacles. Wiring is connected to receptacles but no power going to them, found breaker in panel labeled “UNFINISHED GFCI” breaker is not connected. Not sure how this passed final inspection like this. Found some inside receptacles had pulled out hot wires, and ground wires improperly tied together. I’m assuming the unfinished GFCI breaker is the one that feeds outside receptacles, I cannot take liability of connecting it du |
|
|
|
-- |
-- |
Oak stairs in hallway |
|
|
-- |
-- |
Can we move screens? |
|
|
-- |
-- |
Remove set of steps in kitchen |
|
|
-- |
-- |
Needs hardware in half of kitchen |
|
|
-- |
-- |
Complete front porch overhang |
|
|
-- |
-- |
Finish lvp on landing |
|
|
-- |
-- |
Is carpet needed on the steps going to the basement level? |
|
|
-- |
-- |
Install carpet on steps to basement |
Denny |
|
-- |
-- |
Faucet needed basement tub |
|
|
-- |
-- |
Faucet needed basement tub |
|
|
-- |
-- |
Electric stone piece needed on front of house |
Stone guys |
|
-- |
-- |
Fan is in non window room~ correct? |
|
|
-- |
-- |
HVAC cover needed in family room |
HVAC |
|
-- |
-- |
Thermostat |
|
|
-- |
-- |
Black shower drain needed |
|
|
-- |
-- |
Complete installation of black bath tub accessories in hall bath |
|
|
-- |
-- |
Remove extra shingles on roof |
|
|
-- |
-- |
Front splash block needed |
Tom |
|
-- |
-- |
Doorbell needed |
Electrician |
|
-- |
-- |
Micro vent works- but barely |
Tom |
|
-- |
-- |
Drywall repair near front door |
Painter |
|
-- |
-- |
Attic cover |
Paint it 11/15 |
|
-- |
-- |
White boards below doors needed here |
|
|
-- |
-- |
CODED LOCKBOX 8989 |
|
|
-- |
-- |
Home Inspection - Monday, Nov 20, 1PM |
|
|
-- |
-- |
Electric trimout needed on the front electric outlet |
Electrician |
|
-- |
-- |
Install handrails |
|
|
-- |
-- |
Needs water valve cover |
Tom |
|
-- |
-- |
Sand and paint drywall patch by the front door |
Painter |
|
-- |
-- |
Clean off paint overspray on hardware and pantry cabinet |
Painter |
|
-- |
-- |
Repaint both handrails going down to basement |
Painter |
|
-- |
-- |
Drywall patch in basement family room where water cut office |
|
|
-- |
-- |
Small drywall patch under escutcheon at showerhead in basement |
Painter |
|
-- |
-- |
Paint, touchup, both handrails going to bedroom level |
Painter |
|
-- |
-- |
Take covers off of smoke alarms |
Jill |
|
-- |
-- |
Remove blue tape and drywall mud from tub shower |
Lynn, Jill |
|
-- |
-- |
Paint, attic, access, panel |
Painter. Reminded 11/29 |
|
-- |
-- |
Crack to be fixed in master shower |
Jill |
|
-- |
-- |
Damaged outlet at dining area where one hole is blocked |
Electrician |
|
-- |
-- |
Tighten loose screw on front spigot |
|
|
-- |
-- |
Replace loose screw on front spigot |
|
|
-- |
-- |
Fix incorrectly installed nail at ridge shingle |
Roofer - Joel |
|
-- |
-- |
Repair raised shingle at rear ridge vent |
Roofer - Joel |
|
-- |
-- |
Flashing is not installed where front roof support beams connect to home |
Davenport |
|
-- |
-- |
Install missing support leg under range |
Courtney |
|
-- |
-- |
Add support bracket to basement step handrail |
|
|
-- |
-- |
Install missing switch plate at right of front door |
Electrician |
|
-- |
-- |
Secure front downspouts at the bottom |
Davenport |
|
-- |
-- |
Install window screens |
Kristen |
|
-- |
-- |
door jam |
|
|
-- |
-- |
Basement door jambs are primed but not painted |
|
|
-- |
-- |
Repair brick molding at left side of basement door |
This has been completed. Are we OK with the final repair? |
|
-- |
-- |
Needs cable cover installed |
Electrician |
|
-- |
-- |
|
|
|
-- |
-- |
Re-clean living room, and kitchen before final walk-through |
Lynn |
|
-- |
-- |
Make sure bottom outlet in dining nook is working |
Tom |
|
-- |
-- |
Have a contractor install Z flashing. |
Davenport - front support beams connect to home |
|
-- |
-- |
One shingle is Raised at rear ridge vent |
Joel |
|
-- |
-- |
One nail incorrectly installed at Ridge shingle |
Joel |
|
-- |
-- |
Touch up paint |
Painter |
|
-- |
-- |
Hole near driveway? |
|
|
-- |
-- |
Trash can hider |
|
|
-- |
-- |
Ratified Contract? (0) 06.06.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 06.09.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 06.06.2023 |
|
|
-- |
-- |
Association Packet Received (0) 06.09.2023 |
|
|
-- |
-- |
Selections Meeting (0) 07.22.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 08.02.2023 |
7/31: sent to Logan for signatures |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 08.15.2023 |
8/3: Signed, waiting on deposit; |
|
-- |
-- |
Deposit For Upgrades Received (0) 08.15.2023 |
Will be made after Jerry signs the amendment |
|
-- |
-- |
Building Permit (30) 05.05.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 06.26.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 06.26.2023 |
|
|
-- |
-- |
Stake Out Home (1) 05.18.2023 |
|
|
-- |
-- |
Excavate (2) 05.18.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 05.18.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 05.18.2023 |
|
|
-- |
-- |
Pour Footers (1) 05.18.2023 |
|
|
-- |
-- |
Set Forms (2) 06.01.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 06.01.2023 |
|
|
-- |
-- |
Plumb Slab (2) 06.12.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 06.12.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 06.12.2023 |
|
|
-- |
-- |
Prepare Slab (1) 06.12.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 06.12.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 06.19.2023 |
|
|
-- |
-- |
Pour Slab (1) * 06.12.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 06.07.2023 |
|
|
-- |
-- |
Framing I (9) 07.02.2023 |
|
|
-- |
-- |
Order Steps (0) 08.03.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 08.03.2023 |
|
|
-- |
-- |
Framing II (8) 07.17.2023 |
|
|
-- |
-- |
Framing III (8) * 08.03.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.11.2023 |
|
|
-- |
-- |
Install Stairs (0) 08.23.2023 |
|
|
-- |
-- |
Windows & Doors (0) 08.03.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 08.30.2023 |
|
|
-- |
-- |
Roofing (0) 08.03.2023 |
|
|
-- |
-- |
Order Cabinets (0) 08.08.2023 |
|
|
-- |
-- |
Order Appliances (0) 09.11.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0) 08.26.2023 |
|
|
-- |
-- |
Gutters (0) 10.12.2023 |
|
|
-- |
-- |
Driveway (0) 10.28.2023 |
NO UPGRADE |
|
-- |
-- |
Patio (0) 10.28.2023 |
NO UPGRADE |
|
-- |
-- |
Privacy Divider / Fence (0) 11.12.2023 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 11.04.2023 |
|
|
-- |
-- |
HVAC Rough In (4) 08.23.2023 |
in process 8/9 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 09.03.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 12.11.2023 |
|
|
-- |
-- |
Plumbing Rough In (4) 08.23.2023 |
In process 8/23 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 09.03.2023 |
|
|
-- |
-- |
Electric Rough In (4) 08.26.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 09.03.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 10.12.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 09.08.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 10.07.2023 |
in process 10/4 |
|
-- |
-- |
Exterior Stone (0) 10.12.2023 |
|
|
-- |
-- |
Insulation (2) 09.03.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 09.05.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 09.28.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 11.09.2023 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 10.05.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 10.05.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 10.04.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 09.13.2023 |
In process 9/10, Bonus Room Bonus Bath |
|
-- |
-- |
Loan Approval (0) 10.23.2023 |
|
|
-- |
-- |
Deed Preparation (0) 10.19.2023 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 09.23.2023 |
In process 9/20 |
|
-- |
-- |
Paint 1 (1) 09.23.2023 |
|
|
-- |
-- |
Garage Door (0) 09.03.2023 |
|
|
-- |
-- |
House Numbers (0) 11.08.2023 |
|
|
-- |
-- |
Mailbox (0) 11.04.2023 |
|
|
-- |
-- |
Cabinet Installation (2) * 09.27.2023 |
9/19 |
|
-- |
-- |
Granite Installation (1) * 10.04.2023 |
|
|
-- |
-- |
Interior Trim - Install (3) 09.30.2023 |
In process 9/27 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 10.16.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 10.04.2023 |
|
|
-- |
-- |
Luxury Vinyl Plank (3) * 10.21.2023 |
In process 10/18 |
|
-- |
-- |
Luxury Vinyl Tile (0) 10.14.2023 |
In process. Needed in basement bath 10/11 |
|
-- |
-- |
Paint 2 (3) 10.07.2023 |
|
|
-- |
-- |
Cover Floors (1) 11.01.2023 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 10.23.2023 |
|
|
-- |
-- |
Shoe Moulding (0) 10.18.2023 |
|
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 11.08.2023 |
Shelving is in |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 11.13.2023 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 10.16.2023 |
|
|
-- |
-- |
Set Water Meter (0) 11.09.2023 |
|
|
-- |
-- |
Electric Trim Out (3) 11.12.2023 |
BLACK. In process. 11/4 |
|
-- |
-- |
Ceiling Fans (0) 11.04.2023 |
Master Bedroom, Basement Family Room |
|
-- |
-- |
HVAC Trim Out (1) 11.08.2023 |
|
|
-- |
-- |
Blower Door Test (1) 11.20.2023 |
Fri, Nov 17 |
|
-- |
-- |
Plumbing Trim Out (2) 11.08.2023 |
BLACK. In process 11/4. Munzer is here. |
|
-- |
-- |
Install Appliances (0) * 10.25.2023 |
On site 10/18 |
|
-- |
-- |
Paint 3 (2) * 10.11.2023 |
|
|
-- |
-- |
Carpet (2) 10.21.2023 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 11.20.2023 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 11.21.2023 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 11.21.2023 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 11.21.2023 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 11.21.2023 |
Tue, Nov 21 |
|
-- |
-- |
Pre Walk Through (0) 11.20.2023 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 11.15.2023 |
In process 11/12 |
|
-- |
-- |
Cleaning (1) 11.25.2023 |
|
|
-- |
-- |
Certificate of Occupancy (1) * 11.28.2023 |
|
|
-- |
-- |
C.O. to Lender (0) 11.28.2023 |
|
|
-- |
-- |
Schedule Closing (0) 12.06.2023 |
|
|
-- |
-- |
Buyer Walk Through (1) 12.08.2023 |
|
|
-- |
-- |
Payment for Upgrades (0) 11.30.2023 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 11.28.2023 |
|
|
-- |
-- |
Review Settlement Statement (0) 12.08.2023 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 11.28.2023 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 11.21.2023 |
|
|
-- |
-- |
Closing (1) 12.08.2023 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0) 12.13.2023 |
|
|