CONGERS-2 - 89  ::  1545 Palomino Trail
[ BUILD: 20230701 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Oak stairs in hallway
--   --   Can we move screens?
--   --   Remove set of steps in kitchen
--   --   Needs hardware in half of kitchen
--   --   Complete front porch overhang
--   --   Finish lvp on landing
--   --   Is carpet needed on the steps going to the basement level?
--   --   Install carpet on steps to basement Denny
--   --   Faucet needed basement tub
--   --   Faucet needed basement tub
--   --   Electric stone piece needed on front of house Stone guys
--   --   Fan is in non window room~ correct?
--   --   HVAC cover needed in family room HVAC
--   --   Thermostat
--   --   Black shower drain needed
--   --   Complete installation of black bath tub accessories in hall bath
--   --   Remove extra shingles on roof
--   --   Front splash block needed Tom
--   --   Doorbell needed Electrician
--   --   Micro vent works- but barely Tom
--   --   Drywall repair near front door Painter
--   --   Attic cover Paint it 11/15
--   --   White boards below doors needed here
--   --   CODED LOCKBOX 8989
--   --   Home Inspection - Monday, Nov 20, 1PM
--   --   Electric trimout needed on the front electric outlet Electrician
--   --   Install handrails
--   --   Needs water valve cover Tom
--   --   Sand and paint drywall patch by the front door Painter
--   --   Clean off paint overspray on hardware and pantry cabinet Painter
--   --   Repaint both handrails going down to basement Painter
--   --   Drywall patch in basement family room where water cut office
--   --   Small drywall patch under escutcheon at showerhead in basement Painter
--   --   Paint, touchup, both handrails going to bedroom level Painter
--   --   Take covers off of smoke alarms Jill
--   --   Remove blue tape and drywall mud from tub shower Lynn, Jill
--   --   Paint, attic, access, panel Painter. Reminded 11/29
--   --   Crack to be fixed in master shower Jill
--   --   Damaged outlet at dining area where one hole is blocked Electrician
--   --   Tighten loose screw on front spigot
--   --   Replace loose screw on front spigot
--   --   Fix incorrectly installed nail at ridge shingle Roofer - Joel
--   --   Repair raised shingle at rear ridge vent Roofer - Joel
--   --   Flashing is not installed where front roof support beams connect to home Davenport
--   --   Install missing support leg under range Courtney
--   --   Add support bracket to basement step handrail
--   --   Install missing switch plate at right of front door Electrician
--   --   Secure front downspouts at the bottom Davenport
--   --   Install window screens Kristen
--   --   door jam
--   --   Basement door jambs are primed but not painted
--   --   Repair brick molding at left side of basement door This has been completed. Are we OK with the final repair?
--   --   Needs cable cover installed Electrician
--   --  
--   --   Re-clean living room, and kitchen before final walk-through Lynn
--   --   Make sure bottom outlet in dining nook is working Tom
--   --   Have a contractor install Z flashing. Davenport - front support beams connect to home
--   --   One shingle is Raised at rear ridge vent Joel
--   --   One nail incorrectly installed at Ridge shingle Joel
--   --   Touch up paint Painter
--   --   Hole near driveway?
--   --   Trash can hider
-- -- Ratified Contract? (0)  06.06.2023    
-- -- $2500 Deposit Received (0)  06.09.2023    
-- -- Association Packet Requested (0)  06.06.2023    
-- -- Association Packet Received (0)  06.09.2023    
-- -- Selections Meeting (0)  07.22.2023    
-- -- Selections Sheet Signed (0)  08.02.2023     7/31: sent to Logan for signatures
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  08.15.2023     8/3: Signed, waiting on deposit;
-- -- Deposit For Upgrades Received (0)  08.15.2023     Will be made after Jerry signs the amendment
-- -- Building Permit (30)  05.05.2023    
-- -- Order Roof & Floor Trusses (1)  06.26.2023    
-- -- Order Windows & Doors (0)  06.26.2023    
-- -- Stake Out Home (1)  05.18.2023    
-- -- Excavate (2)  05.18.2023    
-- -- Inspection (Footers) (1)  05.18.2023    
-- -- Inspection (Concrete Wall) (1)  05.18.2023    
-- -- Pour Footers (1)  05.18.2023    
-- -- Set Forms (2)  06.01.2023    
-- -- Pour Foundation Walls (1)  06.01.2023    
-- -- Plumb Slab (2)  06.12.2023    
-- -- Inspection (Plumbing Under Slab) (1)  06.12.2023    
-- -- Inspection (Conduit Under Slab) (1)  06.12.2023    
-- -- Prepare Slab (1)  06.12.2023    
-- -- Inspection (Slab) (1)  06.12.2023    
-- -- Inspection (Drain Tile) (0)  06.19.2023    
-- -- Pour Slab (1)  06.12.2023    
-- -- Settlement Agent Confirmed (0)  06.07.2023    
-- -- Framing I (9)  07.02.2023    
-- -- Order Steps (0)  08.03.2023    
-- -- Order Tubs / Showers (0)  08.03.2023    
-- -- Framing II (8)  07.17.2023    
-- -- Framing III (8)  08.03.2023    
-- -- Verify Window & Roof Structure (0)  12.11.2023    
-- -- Install Stairs (0)  08.23.2023    
-- -- Windows & Doors (0)  08.03.2023    
-- -- House Number and Status in Window (0)  08.30.2023    
-- -- Roofing (0)  08.03.2023    
-- -- Order Cabinets (0)  08.08.2023    
-- -- Order Appliances (0)  09.11.2023     STANDARD SS
-- -- Deck (0)  08.26.2023    
-- -- Gutters (0)  10.12.2023    
-- -- Driveway (0)  10.28.2023     NO UPGRADE
-- -- Patio (0)  10.28.2023     NO UPGRADE
-- -- Privacy Divider / Fence (0)  11.12.2023    
-- -- Sod / Seed / Landscaping (0)  11.04.2023    
-- -- HVAC Rough In (4)  08.23.2023     in process 8/9
-- -- Inspection (Rough In HVAC) (1)  09.03.2023    
-- -- Rough In Microwave Vent (0)  12.11.2023    
-- -- Plumbing Rough In (4)  08.23.2023     In process 8/23
-- -- Inspection (Rough In Plumbing) (1)  09.03.2023    
-- -- Electric Rough In (4)  08.26.2023    
-- -- Inspection (Rough In Electric) (1)  09.03.2023    
-- -- Inspection (Deck Piers) (0)  10.12.2023    
-- -- Inspection (Framing) (1)  09.08.2023    
-- -- Exterior Vinyl (0)  10.07.2023     in process 10/4
-- -- Exterior Stone (0)  10.12.2023    
-- -- Insulation (2)  09.03.2023    
-- -- Inspection (Insulation) (1)  09.05.2023    
-- -- Inspection (Electric Service) (0)  09.28.2023    
-- -- Set Electric Meter (0)  11.09.2023    
-- -- Inspection (Main Sewer Line) (0)  10.05.2023    
-- -- Inspection (Main Water Line) (0)  10.05.2023    
-- -- Order Interior Doors & Trim (0)  10.04.2023    
-- -- Drywall (Hang) (4)  09.13.2023     In process 9/10, Bonus Room Bonus Bath
-- -- Loan Approval (0)  10.23.2023    
-- -- Deed Preparation (0)  10.19.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6)  09.23.2023     In process 9/20
-- -- Paint 1 (1)  09.23.2023    
-- -- Garage Door (0)  09.03.2023    
-- -- House Numbers (0)  11.08.2023    
-- -- Mailbox (0)  11.04.2023    
-- -- Cabinet Installation (2)  09.27.2023     9/19
-- -- Granite Installation (1)  10.04.2023    
-- -- Interior Trim - Install (3)  09.30.2023     In process 9/27
-- -- Order Plumbing / Lighting Fixtures (0)  10.16.2023    
-- -- Interior Trim - Paint (1)  10.04.2023    
-- -- Luxury Vinyl Plank (3)  10.21.2023     In process 10/18
-- -- Luxury Vinyl Tile (0)  10.14.2023     In process. Needed in basement bath 10/11
-- -- Paint 2 (3)  10.07.2023    
-- -- Cover Floors (1)  11.01.2023    
-- -- Deliver Plumbing / Lighting Fixtures (0)  10.23.2023    
-- -- Shoe Moulding (0)  10.18.2023    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  11.08.2023     Shelving is in
-- -- Install Coded Lockbox (add extra keys) (0)  11.13.2023    
-- -- Pay Water / Sewer Taps (0)  10.16.2023    
-- -- Set Water Meter (0)  11.09.2023    
-- -- Electric Trim Out (3)  11.12.2023     BLACK. In process. 11/4
-- -- Ceiling Fans (0)  11.04.2023     Master Bedroom, Basement Family Room
-- -- HVAC Trim Out (1)  11.08.2023    
-- -- Blower Door Test (1)  11.20.2023     Fri, Nov 17
-- -- Plumbing Trim Out (2)  11.08.2023     BLACK. In process 11/4. Munzer is here.
-- -- Install Appliances (0)  10.25.2023     On site 10/18
-- -- Paint 3 (2)  10.11.2023    
-- -- Carpet (2)  10.21.2023    
-- -- Appraiser Confirms Construction Completion (0)  11.20.2023    
-- -- Inspection (Final HVAC) (1)  11.21.2023    
-- -- Inspection (Final Plumbing) (1)  11.21.2023    
-- -- Inspection (Final Electric) (1)  11.21.2023    
-- -- Inspection (Final Building) (2)  11.21.2023     Tue, Nov 21
-- -- Pre Walk Through (0)  11.20.2023    
-- -- Stain Hardwood Stairs (1)  11.15.2023     In process 11/12
-- -- Cleaning (1)  11.25.2023    
-- -- Certificate of Occupancy (1)  11.28.2023    
-- -- C.O. to Lender (0)  11.28.2023    
-- -- Schedule Closing (0)  12.06.2023    
-- -- Buyer Walk Through (1)  12.08.2023    
-- -- Payment for Upgrades (0)  11.30.2023    
-- -- Keys to Settlement Agent (0)  11.28.2023    
-- -- Review Settlement Statement (0)  12.08.2023    
-- -- Jerry Signs Closing Documents (0)  11.28.2023    
-- -- Request Trash Tote From POA Manager (0)  11.21.2023    
-- -- Closing (1)  12.08.2023     Brittany @ West View Title