37 ADDR
CONGERS-2 - 91  ::  1537 Palomino Trail
[ BUILD: 20230699 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
TO DO
---
UPGRADES
    Basement kitchenette ( includes standard cabinetry, level 1 granite, sink, faucet, full appliance package, install, plumbing and electrical  
    Finished Basement Family Room (room without windows)  
    Finish Bonus Room ( room with windows)  
CRITICAL PATH
---
TO DO - COMPLETED OR DELETED
UPGRADES - COMPLETED
    Luxury Vinyl Plank in entire basement  
    Vent Microwave to Exterior  
    Amendment to increase price by $630  
CRITICAL PATH - COMPLETED
-- -- Inspection (Footers) (1)  12.14.2025    
-- -- Inspection (Concrete Wall) (1)  05.18.2023    
-- -- Inspection (Plumbing Under Slab) (1)  06.12.2023    
-- -- Inspection (Conduit Under Slab) (1)  06.12.2023    
-- -- Inspection (Slab) (1)  06.12.2023    
-- -- Inspection (Drain Tile) (0)  06.19.2023    
-- -- Inspection (Rough In HVAC) (1)  08.30.2023    
-- -- Inspection (Rough In Plumbing) (1)  08.30.2023    
-- -- Inspection (Rough In Electric) (1)  08.30.2023    
-- -- Inspection (Framing) (1) *   09.03.2023    
-- -- Inspection (Deck Piers) (0)  10.12.2023    
-- -- Inspection (Insulation) (1)  08.30.2023     8/24
-- -- Inspection (Electric Service) (0)  09.28.2023    
-- -- Inspection (Main Sewer Line) (0)  10.05.2023    
-- -- Inspection (Main Water Line) (0)  10.05.2023    
-- -- Inspection (Final HVAC) (0)  11.13.2023     Nov 3
-- -- Inspection (Final Plumbing) (0)  11.13.2023    
-- -- Inspection (Final Electric) (0)  11.13.2023    
-- -- Inspection (Final Building) (4) *   11.16.2023     Reinspect - Mon, Nov 13