Buyer chandelier to be received by Kate no later than November 1. |
Has it been received? |
|
-- |
-- |
BN DOOR HINGES AND LEVERS |
Joe |
|
-- |
-- |
Kate to order Farmhouse Sink and ECoBee |
October 1 |
|
-- |
-- |
Ecobee thermostat - Kate to order |
|
|
-- |
-- |
Farm sink ordered 11/5 |
|
|
-- |
-- |
Damaged upstairs hall shower |
|
|
-- |
-- |
Shower hardware needs to be changed to brushed nickel |
Plumber |
|
-- |
-- |
Will buyers decide to upgrade to tile shower? |
Ask Kate |
|
-- |
-- |
Insulate bathtubs |
Bath tub liner |
|
-- |
-- |
|
|
|
-- |
-- |
Broken corner of patio |
Tom |
|
-- |
-- |
Secure loose house wrap tape (see photo) |
|
|
-- |
-- |
Inspector is asking about blocking for kitchen cabinets (see photo) |
|
|
-- |
-- |
Replace bowed studs in upstairs closet and main floor bathroom (see photos) |
|
|
-- |
-- |
Add missing gap sealant at living room left wall (see photo) |
Done. |
|
-- |
-- |
Add missing fastener on joist hanger above stairs on main level (see photo) |
|
|
-- |
-- |
Add missing fastener on joist hanger above stairs in basement (see photo) |
|
|
-- |
-- |
Secure unattached studs on exterior left wall of basement (see photo) |
|
|
-- |
-- |
Remove nails protruding out of framing before installing flooring (see photo) |
|
|
-- |
-- |
Sand down uneven subfloor in coat closet on main level (see photo) |
|
|
-- |
-- |
Tighten loose plumbing drain strap in kitchen (see photo) |
|
|
-- |
-- |
Back patio stoop corner broken off |
|
|
-- |
-- |
Cover the fridge asap |
|
|
-- |
-- |
Few hardware pieces missing from kitchen |
Fred, it is already noted |
|
-- |
-- |
I think one of vanity doors seems quite darker than others. Just in case buyers mention. |
|
|
-- |
-- |
Bath countertops needed |
|
|
-- |
-- |
Finish drywall in basement storage space |
Drywaller |
|
-- |
-- |
Change hinges to brushed nickel |
Jill |
|
-- |
-- |
Cover countertops |
Jill |
|
-- |
-- |
Countertop missing on basement vanity. I only see two listed in changes. 1/13 |
|
|
-- |
-- |
Wrong thermostat installed |
2/8 still needed |
|
-- |
-- |
Drywall, touchup needed in living room |
Painter |
|
-- |
-- |
Powder, bath, light fixture needed |
|
|
-- |
-- |
Cover carpet in master bedroom and basement |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Plumbing trim out needs completed in basement bonus bath |
Plumber |
|
-- |
-- |
Powder bath needs light fixture |
Electrician |
|
-- |
-- |
Island electric receptacles needed |
Electrician |
|
-- |
-- |
HVAC covers needed here |
Main vent cover needed near kitchen 2/3 - Jason |
|
-- |
-- |
Electric outlet needed in hall bath |
Electrician |
|
-- |
-- |
Large squeak in floor outside of master bedroom |
Denny |
|
-- |
-- |
Attic cover needed |
Needs to be painted |
|
-- |
-- |
Finish carpet on steps |
Denny |
|
-- |
-- |
Few electric covers missing in basement |
Electrician. I see one that’s needed. 2/3 |
|
-- |
-- |
Basement mirror needed |
|
|
-- |
-- |
Basement bath, electric fixture needed |
Electrician |
|
-- |
-- |
LVP transition strip needed to basement |
Denny |
|
-- |
-- |
Home Inspection - Tuesday, Feb 6 at 1PM |
|
|
-- |
-- |
Stone needed at front faucet |
Rock guy |
|
-- |
-- |
CODED LOCKBOX 8181 |
|
|
-- |
-- |
Patch hole for where fan was relocated |
Basement - drywaller |
|
-- |
-- |
Door knob needed to basement closet |
Paul or Joe or Savannah |
|
-- |
-- |
Adjust lock basement door |
Paul or Joe or Savannah |
|
-- |
-- |
Check all showerheads to clean up drywall around escutcheon |
Painter- master still needed and hall |
|
-- |
-- |
Basement door trim |
Trim guy |
|
-- |
-- |
Floor squeak in master bathroom, and master bedroom |
Denny |
|
-- |
-- |
One door needs to be changed from black to brush, nickel hinges |
|
|
-- |
-- |
Noise in furnace? |
Jason |
|
-- |
-- |
Hall bath, patch drywall under the light |
Painter- needs to be sanded and painted |
|
-- |
-- |
Remove paint from kitchen ceiling fixtures |
Painter |
|
-- |
-- |
Clean, handprints off of ceiling, fan blades |
Lynn or Jill |
|
-- |
-- |
Tray ceiling needs, drywall, touchup, and repaint |
|
|
-- |
-- |
Attic access needed |
|
|
-- |
-- |
Closet doors upstairs might be rubbing the carpet too much. But it also could be the plastic. |
Jill |
|
-- |
-- |
Several doors need the edges painted |
Painter |
|
-- |
-- |
Temperature difference between first and second floor |
Jill will check vents |
|
-- |
-- |
White board below front door |
Tom |
|
-- |
-- |
Chip in ceiling fan |
Electrician |
|
-- |
-- |
Drywall chips and blemishes in kitchen drywall |
Drywall, Painter |
|
-- |
-- |
Screens needed |
Jill |
|
-- |
-- |
Push attic cover into place |
|
|
-- |
-- |
Need trim pieces on either side of farmhouse sink |
Fred, on order (after closing) |
|
-- |
-- |
Caulk back of pedestal sink |
Painter |
|
-- |
-- |
Clean mud off carpet at bottom stairs |
Lynn |
|
-- |
-- |
Paint touchup needed sidewalls stairs |
Painter |
|
-- |
-- |
Something needs to be done to address the drywall on the outside wall of the hall, tub shower |
Drywall, Painter |
|
-- |
-- |
There are a couple of areas where shingles were torn or a skew left side of home on top of Stone bump out |
Roofer |
|
-- |
-- |
Some of the drip edge flashing is bent or appeared poorly installed on both corners of the stone bump out |
Davenport |
|
-- |
-- |
Exterior siding below grade in some areas??? |
|
|
-- |
-- |
Cracked piece of stone siding around exterior outlet at the front of the home |
Rock guys |
|
-- |
-- |
Some incomplete areas on the exterior missing stone on left side of house |
Rock guys |
|
-- |
-- |
Exposed orange stuff on left side of house under siding |
Rock guys |
|
-- |
-- |
Front edges of metal roof to be addressed |
Tom- porch overhang |
|
-- |
-- |
Recommend draining gutters 45 feet from foundation |
Splash block |
|
-- |
-- |
Adjust front door, gaps adjuster, correct so good weather seal has achieved |
Tom |
|
-- |
-- |
Adjust front door lock so the lines better |
Paul |
|
-- |
-- |
Basement entry door binds in jam |
Tom |
|
-- |
-- |
Exterior basement window left side did not appear to be finished with exposed flashing tape |
and PVC board |
|
-- |
-- |
Bottom plate missing on dishwasher |
Tom |
|
-- |
-- |
Fridge was off during inspection make sure everything is correct |
Tom |
|
-- |
-- |
Drawer pull screws appeared to be too long or we’re not tight? |
Jill |
|
-- |
-- |
Something unfinished on top of cabinet over fridge |
Jill |
|
-- |
-- |
Subfloor issues in master bedroom and bathroom and laundry room |
Jill, Denny |
|
-- |
-- |
Floor popping in upstairs front left bedroom |
Denny, Eric, Eagle |
|
-- |
-- |
Change black hinges to brush, nickel for master bedroom |
Jill |
|
-- |
-- |
One of the secondary bedrooms upstairs, the door was installed poorly. There’s gapping when closed. |
Tom |
|
-- |
-- |
Upstairs front right bedroom, staple at the bottom of the door causing wear on carpet |
Jill |
|
-- |
-- |
Adjust pantry door and kitchen |
George |
|
-- |
-- |
Master bathroom, vanity drawer, front, not straight and some handles loose |
Fred |
|
-- |
-- |
Towel bar and basement bathroom not level |
Jill |
|
-- |
-- |
|
|
|
-- |
-- |
Sides splash needed vanity top basement bathroom |
Tom |
|
-- |
-- |
Shower door, seal, gap in the middle when the door is shut |
Jill, Joe |
|
-- |
-- |
Cut outs for showerhead, arms too large |
Drywall |
|
-- |
-- |
Screens needed on all windows |
|
|
-- |
-- |
Sm dent in master shower |
To be repaired Feb 13 |
|
-- |
-- |
Do they get 2 extra living room lights? |
|
|
-- |
-- |
Replace master bath vanity drawer |
On order Feb 12 (after closing) |
|
-- |
-- |
Replace kitchen drawer |
On order Feb 12 (after closing) |
|
-- |
-- |
Check on all splash blocks |
|
|
-- |
-- |
Floor popping in laundry room |
Denny, Eric, Eagle |
|
-- |
-- |
$500 check for buyers |
Tina writing the check |
|
-- |
-- |
Clean off deck and trim board under patio door |
Tom |
|
-- |
-- |
Secure glass on front of range |
CJ |
|
-- |
-- |
Tighten ceiling fan against ceiling in bonus room |
Tom |
|
-- |
-- |
Hammer down exposed nail on bonus room bathroom shoe mold |
Fred |
|
-- |
-- |
Switch flooring transition strips to brushed nickel |
Denny, Eric, Eagle |
|
-- |
-- |
Buyers walking back through Wed eve |
|
|
-- |
-- |
Trim board under patio door |
|
|
-- |
-- |
Cabinet touch up |
Waiting on touch up kit (after closing) |
|
-- |
-- |
Install trim pieces on either side of farmhouse sink |
On order Feb 12 (after closing) |
|
-- |
-- |
Touch up cabinets after receiving cabinet touch up kit |
On order Feb 12 (after closing) - Jill |
|
-- |
-- |
Remove blue tape from threshold of front door |
Lynn |
|
-- |
-- |
Patch small dent in drywall on stairwell wall to basement |
Painter- C put blue tape on it |
|
-- |
-- |
Remove clump of drywall on ceiling next to fan in living room |
Painter |
|
-- |
-- |
Remove itty bitty spot of glue from bath tub |
Jill |
|
-- |
-- |
Missing screens |
Jill has them |
|
-- |
-- |
Paint touch up kit |
On order |
|
-- |
-- |
Repair trash can hider lid |
|
|
-- |
-- |
Remove siding from yard |
|
|
-- |
-- |
siding falling off the front of townhouse |
davenport |
|
-- |
-- |
Ratified Contract? (0) 07.02.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0) 07.08.2023 |
|
|
-- |
-- |
Association Packet Requested (0) 07.02.2023 |
|
|
-- |
-- |
Association Packet Received (0) 07.08.2023 |
|
|
-- |
-- |
Selections Meeting (0) 07.31.2023 |
|
|
-- |
-- |
Selections Sheet Signed (0) 08.22.2023 |
8/17: sent to Maraim for signatures; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0) 09.01.2023 |
8/31: sent to Jerry for signatures |
|
-- |
-- |
Deposit For Upgrades Received (0) 09.01.2023 |
8/30: Waiting on second wire from buyer for upgrade deposit; |
|
-- |
-- |
Building Permit (30) 06.01.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1) 09.25.2023 |
|
|
-- |
-- |
Order Windows & Doors (0) 09.14.2023 |
|
|
-- |
-- |
Stake Out Home (1) 06.01.2023 |
|
|
-- |
-- |
Excavate (2) 06.01.2023 |
|
|
-- |
-- |
Inspection (Footers) (1) 06.01.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1) 06.01.2023 |
|
|
-- |
-- |
Pour Footers (1) 06.01.2023 |
|
|
-- |
-- |
Set Forms (2) 06.12.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1) 06.12.2023 |
|
|
-- |
-- |
Plumb Slab (2) 06.26.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1) 06.26.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1) 07.24.2023 |
|
|
-- |
-- |
Prepare Slab (1) 07.24.2023 |
|
|
-- |
-- |
Inspection (Slab) (1) 07.24.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0) 12.18.2023 |
|
|
-- |
-- |
Pour Slab (1) * 07.24.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0) 07.01.2023 |
|
|
-- |
-- |
Framing I (9) 09.18.2023 |
in process 8/30 |
|
-- |
-- |
Order Steps (0) 10.12.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0) 10.28.2023 |
|
|
-- |
-- |
Framing II (8) 09.11.2023 |
|
|
-- |
-- |
Framing III (8) * 10.05.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0) 12.11.2023 |
|
|
-- |
-- |
Install Stairs (0) 10.12.2023 |
|
|
-- |
-- |
Windows & Doors (0) 11.06.2023 |
|
|
-- |
-- |
House Number and Status in Window (0) 11.02.2023 |
|
|
-- |
-- |
Roofing (0) 10.30.2023 |
|
|
-- |
-- |
Order Cabinets (0) 11.02.2023 |
|
|
-- |
-- |
Order Appliances (0) 09.11.2023 |
STANDARD SS |
|
-- |
-- |
Deck (0) 10.22.2023 |
NO UPGRADE |
|
-- |
-- |
Gutters (0) 01.03.2024 |
|
|
-- |
-- |
Driveway (0) 01.31.2024 |
NO UPGRADE - Tuesday, Jan 30 |
|
-- |
-- |
Patio (0) 01.04.2024 |
NO UPGRADE |
|
-- |
-- |
Privacy Divider / Fence (0) 01.19.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0) 02.26.2024 |
|
|
-- |
-- |
HVAC Rough In (4) 11.01.2023 |
In process 10/28 |
|
-- |
-- |
Inspection (Rough In HVAC) (1) 11.16.2023 |
|
|
-- |
-- |
Rough In Microwave Vent (0) 01.03.2024 |
|
|
-- |
-- |
Plumbing Rough In (4) 10.28.2023 |
In process 10/25 |
|
-- |
-- |
Inspection (Rough In Plumbing) (1) 11.16.2023 |
|
|
-- |
-- |
Electric Rough In (4) 11.20.2023 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1) 12.18.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0) 11.16.2023 |
|
|
-- |
-- |
Inspection (Framing) (1) 12.18.2023 |
|
|
-- |
-- |
Exterior Vinyl (0) * 12.18.2023 |
|
|
-- |
-- |
Exterior Stone (0) 01.27.2024 |
|
|
-- |
-- |
Insulation (2) 12.06.2023 |
|
|
-- |
-- |
Inspection (Insulation) (1) 12.18.2023 |
|
|
-- |
-- |
Inspection (Electric Service) (0) 12.18.2023 |
|
|
-- |
-- |
Set Electric Meter (0) 01.08.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0) 12.18.2023 |
|
|
-- |
-- |
Inspection (Main Water Line) (0) 12.18.2023 |
|
|
-- |
-- |
Order Interior Doors & Trim (0) 12.18.2023 |
|
|
-- |
-- |
Drywall (Hang) (4) * 12.18.2023 |
Bonus Room, Bonus Bath, Family Room In process 12/13 |
|
-- |
-- |
Loan Approval (0) 01.29.2024 |
|
|
-- |
-- |
Deed Preparation (0) 01.13.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6) * 01.03.2024 |
|
|
-- |
-- |
Paint 1 (1) 01.03.2024 |
|
|
-- |
-- |
Garage Door (0) 12.04.2023 |
|
|
-- |
-- |
House Numbers (0) 01.29.2024 |
|
|
-- |
-- |
Mailbox (0) 01.04.2024 |
|
|
-- |
-- |
Cabinet Installation (2) * 01.02.2024 |
Dec. 29 |
|
-- |
-- |
Granite Installation (1) * 01.13.2024 |
|
|
-- |
-- |
Interior Trim - Install (3) 01.10.2024 |
in process 1/6 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0) 12.18.2023 |
|
|
-- |
-- |
Interior Trim - Paint (1) 01.17.2024 |
In process 1/10 |
|
-- |
-- |
Luxury Vinyl Plank (3) * 01.19.2024 |
In process 1/17 |
|
-- |
-- |
Luxury Vinyl Tile (0) 01.19.2024 |
|
|
-- |
-- |
Paint 2 (3) 01.13.2024 |
|
|
-- |
-- |
Cover Floors (1) 01.27.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0) 01.15.2024 |
|
|
-- |
-- |
Shoe Moulding (0) 02.03.2024 |
In process 1/31 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0) 01.31.2024 |
A bit of shelving left in master closet. Mirrors up. No doorknobs. 1/25 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0) 02.03.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0) 12.28.2023 |
|
|
-- |
-- |
Set Water Meter (0) 01.15.2024 |
|
|
-- |
-- |
Electric Trim Out (3) 01.31.2024 |
BRUSHED NICKEL. In process 1/27 |
|
-- |
-- |
Ceiling Fans (0) 01.31.2024 |
NO UPGRADE |
|
-- |
-- |
HVAC Trim Out (1) 01.31.2024 |
|
|
-- |
-- |
Blower Door Test (1) 02.05.2024 |
Fri, Feb 2 |
|
-- |
-- |
Plumbing Trim Out (2) 01.27.2024 |
BRUSHED NICKEL. In process 1/25 |
|
-- |
-- |
Install Appliances (0) * 01.31.2024 |
|
|
-- |
-- |
Paint 3 (2) * 02.03.2024 |
In process 1/31 |
|
-- |
-- |
Carpet (2) 01.31.2024 |
In process 1/25 |
|
-- |
-- |
Appraiser Confirms Construction Completion (0) 02.01.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1) 02.08.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1) 02.08.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1) 02.08.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2) * 02.08.2024 |
Wed, Feb 7 |
|
-- |
-- |
Pre Walk Through (0) 02.08.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1) 01.25.2024 |
|
|
-- |
-- |
Cleaning (1) 02.10.2024 |
in process 2/7 |
|
-- |
-- |
Certificate of Occupancy (1) * 02.10.2024 |
|
|
-- |
-- |
C.O. to Lender (0) 02.10.2024 |
|
|
-- |
-- |
Schedule Closing (0) 02.15.2024 |
|
|
-- |
-- |
Buyer Walk Through (1) 02.10.2024 |
Friday, Feb 9 at 2PM |
|
-- |
-- |
Payment for Upgrades (0) 02.15.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0) 02.15.2024 |
|
|
-- |
-- |
Review Settlement Statement (0) 02.15.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0) 02.16.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0) 02.02.2024 |
|
|
-- |
-- |
Closing (1) 02.16.2024 |
Jenny or Chiwon, Global Title, jennifer@myglobaltitle.com |
|
-- |
-- |
Remove Coded Lockbox (0) 03.11.2024 |
|
|