| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished Bonus room ( room with window) | ||||
| Finished Basement Family Room (room with windows) | ||||
| Finished Bonus Bath | ||||
| Level 1 Quartz Countertops Kitchen | ||||
| Level 1 Quartz Countertops Upstairs Bathrooms (2) | ||||
| Master Bath Vanity with Center Drawer Stack | ||||
| Shower Door with BN trim | ||||
| Brushed Nickel Hinges and Door Levers | ||||
| Farmhouse Sink- white single Basin | ||||
| Three Drawer Base in place of Base 36 | ||||
| Roll Out Trays in 18 | ||||
| Roll Out Trays in lower 36 | ||||
| Microwave vented to Exterior | ||||
| CHANDELIER TO BE SELECTED AND PROVIDED BY BUYER 11-1-23 | ||||
| Ecobee wifi enabled thermostat | ||||
| Fence Allowance | ||||
| Amendment to increase price by $42,380 | ||||
| CREDIT for fence allowance | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 06.01.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 06.01.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 06.26.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 07.24.2023 | ||
| -- | -- | Inspection (Slab) (1) 07.24.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 12.18.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 11.16.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 11.16.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 12.18.2023 | ||
| -- | -- | Inspection (Framing) (1) * 12.18.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 11.16.2023 | ||
| -- | -- | Inspection (Insulation) (1) 12.18.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 12.18.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 12.18.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 12.18.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 02.08.2024 | ||
| -- | -- | Inspection (Final Plumbing) (0) 02.08.2024 | ||
| -- | -- | Inspection (Final Electric) (0) 02.08.2024 | ||
| -- | -- | Inspection (Final Building) (4) * 02.08.2024 | Wed, Feb 7 | |