CONGERS-2 - 83  ::  1575 Palomino Trail
[ BUILD: 20230692 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Closet framed out?
--   --   Water coming in basement
--   --   Must (must, must) close by January 15, 2023 daughter, basketball, eligibility
--   --   Cover new carpets
--   --   Remove large drywall pieces from master bathroom and upstairs small bedroom All pieces of drywall have been stacked into smaller upstairs bedroom
--   --   Extra appliances are in this house CJ, Leisa
--   --   One piece of counter top missing Installing 1/5
--   --   Attic cover Jill
--   --   Finish gutters Tom
--   --   Few lightbulbs needed and kitchen Jill
--   --   Plug is needed so that microwave can be used
--   --   All door knobs needed Mon, Jan 8
--   --   Drywall repair needed in powder bath Painter in process 1/13
--   --   Final paint, touchup needed Painter
--   --   Can’t check micro vent as micro isn’t powered
--   --   Whiteboard needed above front Stoop Tom
--   --   Final paint, touchup needed
--   --   Sand and repaint banisters Painter
--   --   Paint front door Painter
--   --   CODED LOCKBOX 8383
--   --   Finnish landscaping
--   --   Finnish landscaping
--   --   General paint touch ups throughout
--   --   Pressure wash out front and back patio
--   --   Paint front door, after cleaning it
--   --   Need extra paint left for owners Painter
--   --   A few scratches on the floor inside the front door Denny
--   --   Pocket door does not close smoothly
--   --   Mud on the carpet going t
--   --   A few stairs have mud on them Jill
--   --   Deck posts are not nailed down at the bottom Domingo
--   --   Reclean the floors and surfaces throughout home Jill
--   --   Clean the tops of all the cabinets in the kitchen
--   --   Clean the tops of all the cabinets in the kitchen
--   --   Replace damaged front door threshold We have them
-- -- Ratified Contract? (0)  09.29.2023    
-- -- $2500 Deposit Received (0)  10.03.2023    
-- -- Association Packet Requested (0)  09.29.2023    
-- -- Association Packet Received (0)  09.30.2023    
-- -- Selections Meeting (0)  10.25.2023    
-- -- Selections Sheet Signed (0)  10.26.2023     10/25: sent to Isaac
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  11.08.2023     11/6: Sent to Jerry for signature
-- -- Deposit For Upgrades Received (0)  11.07.2023    
-- -- Building Permit (30)  06.01.2023    
-- -- Order Roof & Floor Trusses (1)  09.25.2023    
-- -- Order Windows & Doors (0)  10.28.2023    
-- -- Stake Out Home (1)  06.01.2023    
-- -- Excavate (2)  06.01.2023    
-- -- Inspection (Footers) (1)  06.01.2023    
-- -- Inspection (Concrete Wall) (1)  06.01.2023    
-- -- Pour Footers (1)  06.01.2023    
-- -- Set Forms (2)  06.12.2023    
-- -- Pour Foundation Walls (1)  06.12.2023    
-- -- Plumb Slab (2)  06.26.2023    
-- -- Inspection (Plumbing Under Slab) (1)  06.26.2023    
-- -- Inspection (Conduit Under Slab) (1)  07.24.2023    
-- -- Prepare Slab (1)  07.24.2023    
-- -- Inspection (Slab) (1)  07.24.2023    
-- -- Inspection (Drain Tile) (0)  07.24.2023    
-- -- Pour Slab (1)  07.24.2023    
-- -- Settlement Agent Confirmed (0)  12.22.2023     sent to Brittany 11/8
-- -- Framing I (9)  09.11.2023     in process 8/30
-- -- Order Steps (0)  10.12.2023    
-- -- Order Tubs / Showers (0)  10.28.2023    
-- -- Framing II (8)  09.11.2023    
-- -- Framing III (8)  10.05.2023    
-- -- Verify Window & Roof Structure (0)  12.11.2023    
-- -- Install Stairs (0)  10.12.2023    
-- -- Windows & Doors (0)  12.16.2023    
-- -- House Number and Status in Window (0)  11.02.2023    
-- -- Roofing (0)  10.30.2023    
-- -- Order Cabinets (0)  11.02.2023    
-- -- Order Appliances (0)  09.14.2023     STANDARD SS
-- -- Deck (0)  10.28.2023    
-- -- Gutters (0)  12.20.2023    
-- -- Driveway (0)  01.06.2024    
-- -- Patio (0)  12.16.2023    
-- -- Privacy Divider / Fence (0)  01.17.2024    
-- -- Sod / Seed / Landscaping (0)  02.12.2024    
-- -- HVAC Rough In (4)  10.25.2023     in process 10/14
-- -- Inspection (Rough In HVAC) (1)  11.16.2023    
-- -- Rough In Microwave Vent (0)  12.11.2023    
-- -- Plumbing Rough In (4)  11.04.2023     In process 11/1
-- -- Inspection (Rough In Plumbing) (1)  11.16.2023    
-- -- Electric Rough In (4)  11.12.2023     In process 11/8
-- -- Inspection (Rough In Electric) (1)  11.16.2023    
-- -- Inspection (Deck Piers) (0)  11.16.2023    
-- -- Inspection (Framing) (1)  11.16.2023    
-- -- Exterior Vinyl (0)  12.20.2023    
-- -- Exterior Stone (0)  01.06.2024    
-- -- Insulation (2)  11.16.2023    
-- -- Inspection (Insulation) (1)  11.16.2023    
-- -- Inspection (Electric Service) (0)  12.18.2023    
-- -- Set Electric Meter (0)  01.03.2024    
-- -- Inspection (Main Sewer Line) (0)  12.18.2023    
-- -- Inspection (Main Water Line) (0)  12.18.2023    
-- -- Order Interior Doors & Trim (0)  12.18.2023    
-- -- Drywall (Hang) (4)  11.20.2023    
-- -- Loan Approval (0)  12.28.2023    
-- -- Deed Preparation (0)  12.28.2023    
-- -- Drywall (Tape, Block, Skim, Sand) (6)  12.09.2023     In process 12/6
-- -- Paint 1 (1)  12.09.2023    
-- -- Garage Door (0)  12.04.2023    
-- -- House Numbers (0)  01.11.2024    
-- -- Mailbox (0)  01.03.2024    
-- -- Cabinet Installation (2)  12.16.2023     In process 12/13
-- -- Granite Installation (1)  01.03.2024     Waiting on one countertop
-- -- Interior Trim - Install (3)  12.16.2023     In process 12/13
-- -- Order Plumbing / Lighting Fixtures (0)  12.18.2023    
-- -- Interior Trim - Paint (1)  12.16.2023    
-- -- Luxury Vinyl Plank (3)  12.20.2023    
-- -- Luxury Vinyl Tile (0)  12.20.2023    
-- -- Paint 2 (3)  12.23.2023    
-- -- Cover Floors (1)  01.03.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  12.28.2023    
-- -- Shoe Moulding (0)  01.03.2024    
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  01.06.2024     In process. Needs doorknobs 1/3
-- -- Install Coded Lockbox (add extra keys) (0)  01.15.2024    
-- -- Pay Water / Sewer Taps (0)  12.28.2023    
-- -- Set Water Meter (0)  01.11.2024     Mon, Jan 8
-- -- Electric Trim Out (3)  01.02.2024    
-- -- Ceiling Fans (0)  01.03.2024    
-- -- HVAC Trim Out (1)  10.25.2023    
-- -- Blower Door Test (1)  01.09.2024     Tue, Jan 9
-- -- Plumbing Trim Out (2)  01.03.2024    
-- -- Install Appliances (0)  01.06.2024    
-- -- Paint 3 (2)  01.03.2024    
-- -- Carpet (2)  12.20.2023    
-- -- Appraiser Confirms Construction Completion (0)  01.12.2024    
-- -- Inspection (Final HVAC) (1)  01.12.2024    
-- -- Inspection (Final Plumbing) (1)  01.12.2024    
-- -- Inspection (Final Electric) (1)  01.12.2024    
-- -- Inspection (Final Building) (2)  01.15.2024     Thu, Jan 11
-- -- Pre Walk Through (0)  01.16.2024    
-- -- Stain Hardwood Stairs (1)  01.03.2024    
-- -- Cleaning (1)  01.15.2024    
-- -- Certificate of Occupancy (1)  01.16.2024    
-- -- C.O. to Lender (0)  01.16.2024    
-- -- Schedule Closing (0)  01.16.2024    
-- -- Buyer Walk Through (1)  01.16.2024     Mon, Jan 15, 3PM
-- -- Payment for Upgrades (0)  01.12.2024    
-- -- Keys to Settlement Agent (0)  01.12.2024    
-- -- Review Settlement Statement (0)  01.12.2024    
-- -- Jerry Signs Closing Documents (0)  01.18.2024    
-- -- Request Trash Tote From POA Manager (0)  01.12.2024    
-- -- Closing (1)  01.18.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  01.27.2024