| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Second Deposit = 50% of Upgrade Cost | ||||
| 12 x 18 Expanded Deck | ||||
| White painted kitchen cabinetry | ||||
| Level 3 Quartz Countertops | ||||
| Farmhouse Sink- white single Basin | ||||
| Double Pull Out Trash can | ||||
| Vent Microwave to Exterior | ||||
| Master Bath Vanity- Center Drawer Stack | ||||
| Shower Door Heavy Glass | ||||
| Painted Carpet Grade Stairs | ||||
| Upgraded Carpet Pad upstairs | ||||
| Digital Deadbolt | ||||
| Amendment to increase price by $11,580 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 06.01.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 06.01.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 06.26.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 07.24.2023 | ||
| -- | -- | Inspection (Slab) (1) 07.24.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 07.24.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 11.08.2023 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 11.08.2023 | ||
| -- | -- | Inspection (Rough In Electric) (1) 11.08.2023 | ||
| -- | -- | Inspection (Framing) (1) * 11.08.2023 | ||
| -- | -- | Inspection (Deck Piers) (0) 12.28.2023 | ||
| -- | -- | Inspection (Insulation) (1) 11.15.2023 | ||
| -- | -- | Inspection (Electric Service) (0) 12.18.2023 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 12.18.2023 | ||
| -- | -- | Inspection (Main Water Line) (0) 12.18.2023 | ||
| -- | -- | Inspection (Final HVAC) (0) 01.30.2024 | ||
| -- | -- | Inspection (Final Plumbing) (0) 01.30.2024 | ||
| -- | -- | Inspection (Final Electric) (0) 01.30.2024 | ||
| -- | -- | Inspection (Final Building) (4) * 01.30.2024 | Mon, Jan 29 | |