Damaged bottom corner of primary bathroom tub |
Molding appears to cover it. Think buyers will be OK with it? |
|
-- |
-- |
Basement is unfinished-do they get a closet space? |
|
|
-- |
-- |
One missing piece of granite |
|
|
-- |
-- |
Make sure the final folks don’t forget about the piece of vinyl missing in the top dormer window |
Davenport |
|
-- |
-- |
Vinyl is missing on side of town houses well |
Davenport |
|
-- |
-- |
Cover all carpet |
|
|
-- |
-- |
Needs powder bath mirror |
Paul |
|
-- |
-- |
Install shower bar |
Paul- and toilet paper holder |
|
-- |
-- |
Missing one smoke detector near kitchen |
Electrician |
|
-- |
-- |
Light switch cover needed in hall bath |
Electrician |
|
-- |
-- |
Shoe molding needed around master bath, vanity, and hall vanity |
Fred - need glacier gray trim |
|
-- |
-- |
CODED LOCKBOX 4242 |
|
|
-- |
-- |
Paint, touchup needed |
Painter |
|
-- |
-- |
Drywall repair needed near kitchen |
Ceiling |
|
-- |
-- |
Paint risers |
Painter |
|
-- |
-- |
Attic cover needed |
Painter |
|
-- |
-- |
Few lightbulbs needed |
Jill |
|
-- |
-- |
Finish sanding ceiling repair |
Painter |
|
-- |
-- |
Clean out garage |
Jill |
|
-- |
-- |
Door to deck does not lock easily |
Joe |
|
-- |
-- |
One living room, snap light to be tightened to ceiling |
Electrician |
|
-- |
-- |
Significant gash in stair molding |
|
|
-- |
-- |
Clean out trash bonus room |
John |
|
-- |
-- |
Clean out trash from house |
John |
|
-- |
-- |
Patio door to deck difficult to lock |
Savannah |
|
-- |
-- |
Lots of areas with mud on carpet |
Jill |
|
-- |
-- |
Caulk between right side of tub, shower, and wall |
Painter |
|
-- |
-- |
Put attic access in place |
|
|
-- |
-- |
Sweep, remove plastic and cardboards |
Jill and John |
|
-- |
-- |
Final paint, touchup needed |
Painter |
|
-- |
-- |
Glue in master shower |
|
|
-- |
-- |
Nail pop, living room |
Painter |
|
-- |
-- |
Fix crack in pantry door |
Painter or George |
|
-- |
-- |
Clean, trim at deck door |
Jill |
|
-- |
-- |
Paint, touchup throughout |
|
|
-- |
-- |
Leave extra paint |
Painter |
|
-- |
-- |
Shoe mould in all bathrooms |
|
|
-- |
-- |
Move doorstop and master closet |
Savannah |
|
-- |
-- |
Straighten the light switch in the master closet |
Electrician |
|
-- |
-- |
Mop and sweep the garage |
Lynn |
|
-- |
-- |
|
|
|
-- |
-- |
Weatherstripping to be tacked down door to garage |
Jill |
|
-- |
-- |
Loose garage trim |
Jeff |
|
-- |
-- |
Addressed loudness of garage door |
Jeff |
|
-- |
-- |
Adjust door from garage to house |
Parts are on order |
|
-- |
-- |
Adjust door from garage to house |
|
|
-- |
-- |
Significant gash in stair molding |
|
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
Re-clean floors after repairs |
Jill |
|
-- |
-- |
Front Door deadbolt needs adjusting |
Paul |
|
-- |
-- |
Cut and adjust water spigot to rear of house so drywall can be placed on top |
Munzur |
|
-- |
-- |
Ratified Contract? (0)
09.07.2023 |
|
|
-- |
-- |
$2500 Deposit Received (0)
09.09.2023 |
|
|
-- |
-- |
Association Packet Requested (0)
09.07.2023 |
|
|
-- |
-- |
Association Packet Received (0)
09.09.2023 |
|
|
-- |
-- |
Selections Meeting (0)
09.27.2023 |
Tuesday the 26th @ 10:00 AM |
|
-- |
-- |
Selections Sheet Signed (0)
09.28.2023 |
9/27: Sent to Brandon; |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
10.02.2023 |
9/28: Sent to Jerry; |
|
-- |
-- |
Deposit For Upgrades Received (0)
09.28.2023 |
|
|
-- |
-- |
Building Permit (30)
09.11.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
11.06.2023 |
|
|
-- |
-- |
Order Windows & Doors (0)
11.20.2023 |
|
|
-- |
-- |
Stake Out Home (1)
08.14.2023 |
|
|
-- |
-- |
Excavate (2)
08.14.2023 |
|
|
-- |
-- |
Inspection (Footers) (1)
08.14.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
10.05.2023 |
|
|
-- |
-- |
Pour Footers (1)
08.14.2023 |
|
|
-- |
-- |
Set Forms (2)
09.11.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1)
09.11.2023 |
|
|
-- |
-- |
Plumb Slab (2)
09.18.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
10.05.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
10.05.2023 |
|
|
-- |
-- |
Prepare Slab (1)
10.05.2023 |
|
|
-- |
-- |
Inspection (Slab) (1)
10.05.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
10.05.2023 |
|
|
-- |
-- |
Pour Slab (1)
10.19.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
10.04.2023 |
|
|
-- |
-- |
Framing I (9)
10.26.2023 |
|
|
-- |
-- |
Order Steps (0)
11.20.2023 |
|
|
-- |
-- |
Order Tubs / Showers (0)
11.20.2023 |
|
|
-- |
-- |
Framing II (8)
10.26.2023 |
|
|
-- |
-- |
Framing III (8)
11.25.2023 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
12.13.2023 |
|
|
-- |
-- |
Install Stairs (0)
11.25.2023 |
|
|
-- |
-- |
Windows & Doors (0)
12.13.2023 |
|
|
-- |
-- |
House Number and Status in Window (0)
12.13.2023 |
|
|
-- |
-- |
Roofing (0)
12.13.2023 |
|
|
-- |
-- |
Order Cabinets (0)
12.19.2023 |
|
|
-- |
-- |
Order Appliances (0)
03.07.2024 |
Standard. On site 3/2 in living room. No fridge on site. |
|
-- |
-- |
Deck (0)
01.10.2024 |
|
|
-- |
-- |
Gutters (0)
02.05.2024 |
|
|
-- |
-- |
Driveway (0)
03.06.2024 |
|
|
-- |
-- |
Patio (0)
03.07.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
02.26.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
03.30.2024 |
|
|
-- |
-- |
HVAC Rough In (4)
12.16.2023 |
|
|
-- |
-- |
Inspection (Rough In HVAC) (1)
12.26.2023 |
Taking place 12/21 |
|
-- |
-- |
Rough In Microwave Vent (0)
02.14.2024 |
|
|
-- |
-- |
Plumbing Rough In (4)
12.13.2023 |
|
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
12.26.2023 |
|
|
-- |
-- |
Electric Rough In (4)
12.26.2023 |
In process 12/20 |
|
-- |
-- |
Inspection (Rough In Electric) (1)
12.26.2023 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
02.19.2024 |
|
|
-- |
-- |
Inspection (Framing) (1)
12.26.2023 |
|
|
-- |
-- |
Exterior Vinyl (0)
02.05.2024 |
In process 1/27 |
|
-- |
-- |
Exterior Stone (0)
02.14.2024 |
|
|
-- |
-- |
Insulation (2)
01.03.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1)
01.03.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
02.08.2024 |
|
|
-- |
-- |
Set Electric Meter (0)
03.06.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
02.05.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
02.05.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
02.05.2024 |
|
|
-- |
-- |
Drywall (Hang) (4)
01.03.2024 |
|
|
-- |
-- |
Loan Approval (0)
09.26.2023 |
|
|
-- |
-- |
Deed Preparation (0)
03.04.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
01.13.2024 |
In process 1/10 |
|
-- |
-- |
Paint 1 (1)
01.19.2024 |
|
|
-- |
-- |
Garage Door (0)
02.07.2024 |
|
|
-- |
-- |
House Numbers (0)
03.09.2024 |
|
|
-- |
-- |
Mailbox (0)
03.28.2024 |
|
|
-- |
-- |
Cabinet Installation (2)
01.27.2024 |
Jan 24 |
|
-- |
-- |
Granite Installation (1)
01.27.2024 |
|
|
-- |
-- |
Interior Trim - Install (3)
02.07.2024 |
In process 2/3 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
02.08.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1)
02.07.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
02.21.2024 |
In process 2/17 |
|
-- |
-- |
Luxury Vinyl Tile (0)
02.24.2024 |
In process 2/17 |
|
-- |
-- |
Paint 2 (3)
01.27.2024 |
|
|
-- |
-- |
Cover Floors (1)
02.24.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
02.15.2024 |
|
|
-- |
-- |
Shoe Moulding (0)
02.24.2024 |
In process 1/21 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
02.28.2024 |
|
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
03.09.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
02.19.2024 |
|
|
-- |
-- |
Set Water Meter (0)
02.26.2024 |
|
|
-- |
-- |
Electric Trim Out (3)
03.02.2024 |
In process 2/28 |
|
-- |
-- |
Ceiling Fans (0)
03.02.2024 |
|
|
-- |
-- |
HVAC Trim Out (1)
03.06.2024 |
|
|
-- |
-- |
Blower Door Test (1)
03.14.2024 |
3/12 |
|
-- |
-- |
Plumbing Trim Out (2)
03.02.2024 |
In process 2/28. Just needs hall bath faucet |
|
-- |
-- |
Install Appliances (0)
03.14.2024 |
Delivery 2/12 STANDARD |
|
-- |
-- |
Paint 3 (2)
02.28.2024 |
|
|
-- |
-- |
Carpet (2)
02.21.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
03.28.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
03.19.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
03.19.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
03.19.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2)
03.19.2024 |
|
|
-- |
-- |
Pre Walk Through (0)
03.28.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
03.09.2024 |
|
|
-- |
-- |
Cleaning (1)
03.30.2024 |
Lynn starting here 3/21 |
|
-- |
-- |
Certificate of Occupancy (1)
03.21.2024 |
|
|
-- |
-- |
C.O. to Lender (0)
03.21.2024 |
|
|
-- |
-- |
Schedule Closing (0)
03.28.2024 |
|
|
-- |
-- |
Buyer Walk Through (1)
03.28.2024 |
|
|
-- |
-- |
Payment for Upgrades (0)
03.28.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
03.22.2024 |
|
|
-- |
-- |
Review Settlement Statement (0)
03.28.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
03.22.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
03.28.2024 |
|
|
-- |
-- |
Closing (1)
03.28.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
04.01.2024 |
|
|