| -- | -- | Three Windows On Front Of Middle Level! | ||
| -- | -- | Farm sink ordered 11/5 | ||
| -- | -- | Needs a door leading into the garage | ||
| -- | -- | Painting trim 3/6 | ||
| -- | -- | Cover quartz | ||
| -- | -- | Cover upstairs countertops to avoid staining | ||
| -- | -- | Paint garage door | Painters | |
| -- | -- | Quite a few lightbulbs needed | Jilll | |
| -- | -- | Fix molding near hall bath tub (adjust to make square) | Trim, George. In process 4/19. Needs final paint. | |
| -- | -- | Drywall/Patch wall near master bedroom door that is uneven | Drywaller | |
| -- | -- | Adjust molding to be more straight on master bedroom door frame | Trim, George | |
| -- | -- | Adjust molding to be more straight on master bedroom door frame | ||
| -- | -- | Paint exposed to concrete space between townhouses | Rock guys - Jill notified. In process 4/19 | |
| -- | -- | Paint touchup needed by front door | Painter | |
| -- | -- | Install screen door to patio | And deck - Tom | |
| -- | -- | Paint, touchup in hallway to kitchen | Painter | |
| -- | -- | Large blemish on molding of stairs, leading to upper floor | Painter | |
| -- | -- | Touch up paint | Painter | |
| -- | -- | Clean plumbing and dishwasher out of garage | Jill | |
| -- | -- | Patch nail heads in powder bath | Painter. In process 4/12 | |
| -- | -- | Cannot locate the keys for this unit | ||
| -- | -- | Touch up paint on the ceiling in smaller bedroom | Painter | |
| -- | -- | Few blemishes on Master bedroom ceiling | Painter | |
| -- | -- | CODED LOCBOX 7676 | ||
| -- | -- | A few more screws are needed an outside table cover | Cable - Jill | |
| -- | -- | Install white board on deck | Tom | |
| -- | -- | Install screen doors | ||
| -- | -- | Powder bath fan is not secured | Jill, Mast & Brunk | |
| -- | -- | clean paint off floors | painters | |
| -- | -- | shelves in tall kitchen cabinets are too short | ordered- Fred | |
| -- | -- | reclean floors and surfaces after punch out is completed | Jill or Lynn | |
| -- | -- | small wall in quest bathroom needs completed (trim) | Drywallers | |
| -- | -- | paint touch ups needed throughout | painters | |
| -- | -- | add screws and replace cable cover | ||
| -- | -- | finish patching holes in master bedroom ceiling | painters | |
| -- | -- | pin needed in hall bath door bottom hinge | Jill | |
| -- | -- | add trim around farmhouse sink | Fred has ordered this | |
| -- | -- | caulk gaps in cabinets (corners) | painters | |
| -- | -- | ceiling blemish in dining area and kitchen | painters | |
| -- | -- | paint underside of first step leading to upper level | painters | |
| -- | -- | address the bump in the stairwell (leading downstairs to basement) | Drywallers/Painters | |
| -- | -- | pressure wash front and back | Jill | |
| -- | -- | replace trim on bottom of front door | George | |
| -- | -- | Splash blocks in front/ back need set | Tom | |
| -- | -- | Pin needed in deck door | Jill | |
| -- | -- | Paint, touchup on doorway, leading to powder bath | Painter | |
| -- | -- | Where did the powder bath mirror go? | ||
| -- | -- | Suzanna- 540-241-8212 | ||
| -- | -- | Ratified Contract? (0) 10.02.2023 | ||
| Expanded Driveway | ||||
| Expanded 12 x 18 deck | ||||
| Level 3 Quartz | ||||
| French Model Fridge | ||||
| White Kitchen Cabinetry | ||||
| Farmhouse Sink | ||||
| 3 Drawer Stack 36" to exterior wall | ||||
| Microwave vented tio exterior | ||||
| Painted Stairs to bedroom level | ||||
| LVP whole upstairs | ||||
| Level 1 Quartz Upstairs Bathrooms | ||||
| Amendment to increase price by $14,600 | ||||
| -- | -- | $2500 Deposit Received (0) 10.04.2023 | ||
| -- | -- | Association Packet Requested (0) 10.02.2023 | ||
| -- | -- | Association Packet Received (0) 10.08.2023 | ||
| -- | -- | Selections Meeting (0) 10.14.2023 | ||
| -- | -- | Selections Sheet Signed (0) 10.19.2023 | 10/14: Sent to Courtney | |
| -- | -- | Amendment for Upgrades (B,S,L,T,BCP) (0) 10.26.2023 | 10/25: sent to Jerry | |
| -- | -- | Deposit For Upgrades Received (0) 10.26.2023 | ||
| -- | -- | Building Permit (30) * 09.11.2023 | ||
| -- | -- | Order Roof & Floor Trusses (1) 11.20.2023 | ||
| -- | -- | Order Windows & Doors (0) 11.20.2023 | ||
| -- | -- | Stake Out Home (1) 09.11.2023 | ||
| -- | -- | Excavate (2) 09.11.2023 | ||
| -- | -- | Inspection (Footers) (1) 09.11.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 10.16.2023 | ||
| -- | -- | Pour Footers (1) * 09.11.2023 | ||
| -- | -- | Set Forms (2) 09.11.2023 | ||
| -- | -- | Pour Foundation Walls (1) 09.11.2023 | ||
| -- | -- | Plumb Slab (2) 10.05.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 10.05.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 10.05.2023 | ||
| -- | -- | Prepare Slab (1) 10.16.2023 | ||
| -- | -- | Inspection (Slab) (1) 10.16.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 10.16.2023 | ||
| -- | -- | Pour Slab (1) * 10.16.2023 | ||
| -- | -- | Settlement Agent Confirmed (0) 10.25.2023 | ||
| -- | -- | Framing I (9) 11.27.2023 | ||
| -- | -- | Order Steps (0) 11.27.2023 | ||
| -- | -- | Order Tubs / Showers (0) 11.27.2023 | ||
| -- | -- | Framing II (8) 11.27.2023 | ||
| -- | -- | Framing III (8) * 11.27.2023 | ||
| -- | -- | Verify Window & Roof Structure (0) 12.20.2023 | ||
| -- | -- | Install Stairs (0) * 12.20.2023 | ||
| -- | -- | Windows & Doors (0) * 12.20.2023 | ||
| -- | -- | House Number and Status in Window (0) 01.31.2024 | ||
| -- | -- | Roofing (0) * 12.20.2023 | ||
| -- | -- | Order Cabinets (0) 01.16.2024 | ||
| -- | -- | Order Appliances (0) 03.28.2024 | FRENCH | |
| -- | -- | Deck (0) 01.04.2024 | ||
| -- | -- | Gutters (0) 03.09.2024 | ||
| -- | -- | Driveway (0) * 03.28.2024 | ||
| -- | -- | Patio (0) 02.07.2024 | ||
| -- | -- | Privacy Divider / Fence (0) * 04.10.2024 | ||
| -- | -- | Sod / Seed / Landscaping (0) 04.19.2024 | ||
| -- | -- | HVAC Rough In (4) 01.06.2024 | In process 1/3 | |
| -- | -- | Rough In Microwave Vent (0) 01.03.2024 | ||
| -- | -- | Plumbing Rough In (4) 01.13.2024 | In process 1/10 | |
| -- | -- | Electric Rough In (4) 01.25.2024 | In process 1/19 | |
| -- | -- | Inspection (Rough In HVAC) (1) 01.25.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 01.25.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 01.25.2024 | ||
| -- | -- | Inspection (Framing) (1) * 01.25.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 01.25.2024 | ||
| -- | -- | Exterior Vinyl (0) * 03.07.2024 | In process 2/21 | |
| -- | -- | Exterior Stone (0) 03.13.2024 | ||
| -- | -- | Insulation (2) * 01.27.2024 | ||
| -- | -- | Inspection (Insulation) (1) 01.31.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 03.07.2024 | ||
| -- | -- | Set Electric Meter (0) * 03.29.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 02.15.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 02.15.2024 | ||
| -- | -- | Order Interior Doors & Trim (0) 02.21.2024 | ||
| -- | -- | Drywall (Hang) (4) * 02.03.2024 | In process 1/31 | |
| -- | -- | Loan Approval (0) 10.19.2023 | JoDee (80% LTV) | |
| -- | -- | Deed Preparation (0) 03.28.2024 | ||
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 02.17.2024 | In process 2/14. Final sanding. | |
| -- | -- | Paint 1 (1) 02.17.2024 | ||
| -- | -- | Garage Door (0) 03.13.2024 | ||
| -- | -- | House Numbers (0) 04.06.2024 | ||
| -- | -- | Mailbox (0) 03.28.2024 | ||
| -- | -- | Cabinet Installation (2) * 02.21.2024 | On site 2/17 | |
| -- | -- | Granite Installation (1) * 03.02.2024 | March 1 | |
| -- | -- | Interior Trim - Install (3) * 03.02.2024 | In process 2/28 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) 03.14.2024 | ||
| -- | -- | Interior Trim - Paint (1) 03.02.2024 | ||
| -- | -- | Luxury Vinyl Plank (3) * 03.16.2024 | In process 3/13 | |
| -- | -- | Luxury Vinyl Tile (0) 03.13.2024 | ||
| -- | -- | Paint 2 (3) 03.20.2024 | ||
| -- | -- | Cover Floors (1) 03.16.2024 | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) 03.14.2024 | ||
| -- | -- | Shoe Moulding (0) 03.30.2024 | In process 3/20 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * 04.14.2024 | ||
| -- | -- | Install Coded Lockbox (add extra keys) (0) 04.10.2024 | ||
| -- | -- | Pay Water / Sewer Taps (0) 03.28.2024 | ||
| -- | -- | Set Water Meter (0) * 03.28.2024 | ||
| -- | -- | Electric Trim Out (3) * 04.06.2024 | A few things left to be done | |
| -- | -- | Ceiling Fans (0) 03.30.2024 | ||
| -- | -- | HVAC Trim Out (1) * 03.30.2024 | In process 3/13 | |
| -- | -- | Blower Door Test (1) 04.06.2024 | ||
| -- | -- | Plumbing Trim Out (2) * 03.30.2024 | ||
| -- | -- | Install Appliances (0) * 04.04.2024 | FRENCH- DELIVERY 3/18 | |
| -- | -- | Paint 3 (2) * 03.20.2024 | ||
| -- | -- | Carpet (2) 03.13.2024 | ||
| -- | -- | Appraiser Confirms Construction Completion (0) 04.18.2024 | Diane Hirsch, Apr 10 | |
| -- | -- | Inspection (Final HVAC) (1) 04.06.2024 | ||
| -- | -- | Inspection (Final Plumbing) (1) 04.06.2024 | ||
| -- | -- | Inspection (Final Electric) (1) 04.06.2024 | ||
| -- | -- | Inspection (Final Building) (2) * 04.06.2024 | ||
| -- | -- | Pre Walk Through (0) 04.11.2024 | ||
| -- | -- | Stain Hardwood Stairs (1) * 04.06.2024 | In process 4/3 | |
| -- | -- | Cleaning (1) 04.17.2024 | ||
| -- | -- | Certificate of Occupancy (1) * 04.09.2024 | ||
| -- | -- | C.O. to Lender (0) 04.09.2024 | ||
| -- | -- | Schedule Closing (0) 04.16.2024 | Thursday, April 18th | |
| -- | -- | Buyer Walk Through (1) * 04.17.2024 | Monday, April 15th at 4:30pm | |
| -- | -- | Payment for Upgrades (0) 04.09.2024 | ||
| -- | -- | Keys to Settlement Agent (0) 04.15.2024 | ||
| -- | -- | Review Settlement Statement (0) 04.16.2024 | ||
| -- | -- | Jerry Signs Closing Documents (0) 03.22.2024 | ||
| -- | -- | Request Trash Tote From POA Manager (0) 04.15.2024 | ||
| -- | -- | Closing (1) 04.19.2024 | Brittany @ West View Title, Thursday, April 18th | |
| -- | -- | Remove Coded Lockbox (0) 05.20.2024 | ||