| TO DO | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Expanded Driveway | ||||
| Expanded 12 x 18 deck | ||||
| Level 3 Quartz | ||||
| French Model Fridge | ||||
| White Kitchen Cabinetry | ||||
| Farmhouse Sink | ||||
| 3 Drawer Stack 36" to exterior wall | ||||
| Microwave vented tio exterior | ||||
| Painted Stairs to bedroom level | ||||
| LVP whole upstairs | ||||
| Level 1 Quartz Upstairs Bathrooms | ||||
| Amendment to increase price by $14,600 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 09.11.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 10.16.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 10.05.2023 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 10.05.2023 | ||
| -- | -- | Inspection (Slab) (1) 10.16.2023 | ||
| -- | -- | Inspection (Drain Tile) (0) 10.16.2023 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 01.25.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 01.25.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 01.25.2024 | ||
| -- | -- | Inspection (Framing) (1) * 01.25.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 01.25.2024 | ||
| -- | -- | Inspection (Insulation) (1) 01.31.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 03.07.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 02.15.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 02.15.2024 | ||
| -- | -- | Inspection (Final HVAC) (0) 04.06.2024 | ||
| -- | -- | Inspection (Final Plumbing) (0) 04.06.2024 | ||
| -- | -- | Inspection (Final Electric) (0) 04.06.2024 | ||
| -- | -- | Inspection (Final Building) (4) * 04.06.2024 | ||