Dent in refrigerator door |
we have the fridge and are waiting on access |
|
-- |
-- |
Seror 540-746-0946 |
|
|
|
-- |
-- |
Paint touchup throughout |
|
|
-- |
-- |
Small piece of missing trim on Main level staircase |
|
|
-- |
-- |
Cover carpet |
|
|
-- |
-- |
Add trim to hall bath |
And master bath |
|
-- |
-- |
Powder bath needs light fixture |
Electrician |
|
-- |
-- |
Patio door plugs needed |
Kristen |
|
-- |
-- |
Towel bars, and hand towel rings are the incorrect color |
Joe |
|
-- |
-- |
Hall bathroom electrical switch plate needed |
Electrician |
|
-- |
-- |
Paint front door |
Painter |
|
-- |
-- |
Paint front door |
|
|
-- |
-- |
Finish touchup paint |
|
|
-- |
-- |
CODED LOCKBOX 4545 |
|
|
-- |
-- |
Few stones needed in front |
Rock guys |
|
-- |
-- |
Crooked board in basement bonus space. Doesn’t matter? |
Tom |
|
-- |
-- |
Microwave isn’t working |
Tom |
|
-- |
-- |
Floor register missing in kitchen |
Jill |
|
-- |
-- |
Paint attic cover |
Painter |
|
-- |
-- |
Screen door needs installed at deck door |
|
|
-- |
-- |
Microwave isn’t working, it flips the breaker every time you push a button or open the door |
|
|
-- |
-- |
A few screens still need installed on3rd floor |
|
|
-- |
-- |
Deck door doesn’t close or open smoothly |
Jeremiah |
|
-- |
-- |
Wall needs paint touch up around where the shower head comes out of the wall in the guest bathroom |
Painter |
|
-- |
-- |
Caulk around the attic access panel hole |
|
|
-- |
-- |
Paint the attic access panel |
|
|
-- |
-- |
Blue pipe in bonus room needs moved so that they can eventually hang drywall |
Mazur |
|
-- |
-- |
Extra filter needed |
Jill |
|
-- |
-- |
Handrails all need put back up |
|
|
-- |
-- |
Remove the extra screens from the bonus room |
Jill |
|
-- |
-- |
Light bulb needed in the garage door opener |
|
|
-- |
-- |
The cover needs put on the keypad on the back of the front door |
|
|
-- |
-- |
Bathtub missing a silver drain? |
Jill |
|
-- |
-- |
Smoke detector beeping |
Jill |
|
-- |
-- |
Remove extra splash blocks from driveway |
Tom |
|
-- |
-- |
Pressure wash front and rear of home |
Jill |
|
-- |
-- |
Landscaping needed in front corner |
Pettit |
|
-- |
-- |
Clean out garage |
|
|
-- |
-- |
Drywall repair hall bath escutcheon |
|
|
-- |
-- |
Remove glue from hall tub |
|
|
-- |
-- |
Put attic access in place |
|
|
-- |
-- |
Floor creak master |
Denny |
|
-- |
-- |
Missing a front screen |
Jill |
|
-- |
-- |
Water is dripping out of the front of the Spicket handle, not the actual Spicket in the front of the house |
Mazur |
|
-- |
-- |
Install or remove extra splash block |
Tom |
|
-- |
-- |
Finish cleaning out garage |
Jill |
|
-- |
-- |
Difficult to turn front hose bib |
|
|
-- |
-- |
Repair chip in fiberglass shower in hall bathroom |
Valley Tub Repair |
|
-- |
-- |
Drywall repairs |
Living Room - drywaller and painter |
|
-- |
-- |
Install screen in living room |
|
|
-- |
-- |
Oven is not working |
Matts Appliances |
|
-- |
-- |
The trim on the garage door seems to have come loose |
Davenport |
|
-- |
-- |
Ratified Contract? (0)
02.15.2024 |
|
|
-- |
-- |
$2500 Deposit Received (0)
02.17.2024 |
|
|
-- |
-- |
Association Packet Requested (0)
02.15.2024 |
|
|
-- |
-- |
Association Packet Received (0)
02.17.2024 |
|
|
-- |
-- |
Selections Meeting (0)
03.05.2024 |
|
|
-- |
-- |
Selections Sheet Signed (0)
03.06.2024 |
3/5: sent to Kozhin |
|
-- |
-- |
Amendment for Upgrades (B,S,L,T,BCP) (0)
04.23.2024 |
4/22: sent to Jerry to sign |
|
-- |
-- |
Deposit For Upgrades Received (0)
03.06.2024 |
|
|
-- |
-- |
Building Permit (30)
11.06.2023 |
|
|
-- |
-- |
Order Roof & Floor Trusses (1)
01.04.2024 |
|
|
-- |
-- |
Order Windows & Doors (0)
01.25.2024 |
|
|
-- |
-- |
Stake Out Home (1)
11.09.2023 |
|
|
-- |
-- |
Excavate (2)
11.09.2023 |
|
|
-- |
-- |
Inspection (Footers) (1)
11.09.2023 |
|
|
-- |
-- |
Inspection (Concrete Wall) (1)
01.04.2024 |
|
|
-- |
-- |
Pour Footers (1)
11.09.2023 |
|
|
-- |
-- |
Set Forms (2)
11.30.2023 |
|
|
-- |
-- |
Pour Foundation Walls (1)
11.30.2023 |
|
|
-- |
-- |
Plumb Slab (2)
12.01.2023 |
|
|
-- |
-- |
Inspection (Plumbing Under Slab) (1)
12.18.2023 |
|
|
-- |
-- |
Inspection (Conduit Under Slab) (1)
12.18.2023 |
|
|
-- |
-- |
Prepare Slab (1)
12.18.2023 |
|
|
-- |
-- |
Inspection (Slab) (1)
12.18.2023 |
|
|
-- |
-- |
Inspection (Drain Tile) (0)
12.18.2023 |
|
|
-- |
-- |
Pour Slab (1)
12.18.2023 |
|
|
-- |
-- |
Settlement Agent Confirmed (0)
04.23.2024 |
|
|
-- |
-- |
Framing I (9)
01.04.2024 |
|
|
-- |
-- |
Order Steps (0)
02.07.2024 |
|
|
-- |
-- |
Order Tubs / Showers (0)
02.07.2024 |
|
|
-- |
-- |
Framing II (8)
01.07.2024 |
|
|
-- |
-- |
Framing III (8)
01.29.2024 |
|
|
-- |
-- |
Verify Window & Roof Structure (0)
02.19.2024 |
|
|
-- |
-- |
Install Stairs (0)
01.29.2024 |
|
|
-- |
-- |
Windows & Doors (0)
02.07.2024 |
|
|
-- |
-- |
House Number and Status in Window (0)
02.19.2024 |
|
|
-- |
-- |
Roofing (0)
02.07.2024 |
|
|
-- |
-- |
Order Cabinets (0)
03.26.2024 |
|
|
-- |
-- |
Order Appliances (0)
04.25.2024 |
|
|
-- |
-- |
Deck (0)
02.03.2024 |
|
|
-- |
-- |
Gutters (0)
04.04.2024 |
|
|
-- |
-- |
Driveway (0)
04.19.2024 |
|
|
-- |
-- |
Patio (0)
03.13.2024 |
|
|
-- |
-- |
Privacy Divider / Fence (0)
04.18.2024 |
|
|
-- |
-- |
Sod / Seed / Landscaping (0)
05.11.2024 |
|
|
-- |
-- |
HVAC Rough In (4)
02.07.2024 |
In process 2/3 |
|
-- |
-- |
Inspection (Rough In HVAC) (1)
02.21.2024 |
|
|
-- |
-- |
Rough In Microwave Vent (0)
02.07.2024 |
|
|
-- |
-- |
Plumbing Rough In (4)
02.17.2024 |
In process 2/10. Almost completed. |
|
-- |
-- |
Inspection (Rough In Plumbing) (1)
02.21.2024 |
|
|
-- |
-- |
Electric Rough In (4)
02.17.2024 |
|
|
-- |
-- |
Inspection (Rough In Electric) (1)
02.21.2024 |
|
|
-- |
-- |
Inspection (Deck Piers) (0)
04.22.2024 |
|
|
-- |
-- |
Inspection (Framing) (1)
02.21.2024 |
|
|
-- |
-- |
Exterior Vinyl (0)
04.03.2024 |
|
|
-- |
-- |
Exterior Stone (0)
04.10.2024 |
In process 4/6 |
|
-- |
-- |
Insulation (2)
02.21.2024 |
|
|
-- |
-- |
Inspection (Insulation) (1)
02.24.2024 |
|
|
-- |
-- |
Inspection (Electric Service) (0)
03.28.2024 |
|
|
-- |
-- |
Set Electric Meter (0)
05.01.2024 |
|
|
-- |
-- |
Inspection (Main Sewer Line) (0)
04.04.2024 |
|
|
-- |
-- |
Inspection (Main Water Line) (0)
04.04.2024 |
|
|
-- |
-- |
Order Interior Doors & Trim (0)
04.06.2024 |
|
|
-- |
-- |
Drywall (Hang) (4)
03.06.2024 |
In process 2/24 |
|
-- |
-- |
Loan Approval (0)
04.04.2024 |
Cash |
|
-- |
-- |
Deed Preparation (0)
04.23.2024 |
|
|
-- |
-- |
Drywall (Tape, Block, Skim, Sand) (6)
03.13.2024 |
In process 3/9 |
|
-- |
-- |
Paint 1 (1)
03.13.2024 |
|
|
-- |
-- |
Garage Door (0)
03.30.2024 |
|
|
-- |
-- |
House Numbers (0)
04.27.2024 |
|
|
-- |
-- |
Mailbox (0)
04.27.2024 |
|
|
-- |
-- |
Cabinet Installation (2)
04.12.2024 |
Delivery April 11, Install April 12 |
|
-- |
-- |
Granite Installation (1)
04.18.2024 |
|
|
-- |
-- |
Interior Trim - Install (3)
03.20.2024 |
In process 3/16 |
|
-- |
-- |
Order Plumbing / Lighting Fixtures (0)
04.17.2024 |
|
|
-- |
-- |
Interior Trim - Paint (1)
03.30.2024 |
|
|
-- |
-- |
Luxury Vinyl Plank (3)
04.06.2024 |
|
|
-- |
-- |
Luxury Vinyl Tile (0)
04.06.2024 |
|
|
-- |
-- |
Paint 2 (3)
04.03.2024 |
|
|
-- |
-- |
Cover Floors (1)
05.01.2024 |
|
|
-- |
-- |
Deliver Plumbing / Lighting Fixtures (0)
04.10.2024 |
|
|
-- |
-- |
Shoe Moulding (0)
04.24.2024 |
In process 4/19 |
|
-- |
-- |
Shelving, Door Knobs, Fire Extinguisher (0)
05.09.2024 |
Shelving and mirrors needed 5/4 - Wed, May 8 |
|
-- |
-- |
Install Coded Lockbox (add extra keys) (0)
05.06.2024 |
|
|
-- |
-- |
Pay Water / Sewer Taps (0)
04.22.2024 |
|
|
-- |
-- |
Set Water Meter (0)
04.23.2024 |
|
|
-- |
-- |
Electric Trim Out (3)
04.27.2024 |
In process 4/24 |
|
-- |
-- |
Ceiling Fans (0)
04.27.2024 |
|
|
-- |
-- |
HVAC Trim Out (1)
04.27.2024 |
Partially complete 4/24 |
|
-- |
-- |
Blower Door Test (1)
05.09.2024 |
|
|
-- |
-- |
Plumbing Trim Out (2)
04.27.2024 |
In process 4/17 |
|
-- |
-- |
Install Appliances (0)
05.09.2024 |
Tuesday, May 7 |
|
-- |
-- |
Paint 3 (2)
04.27.2024 |
|
|
-- |
-- |
Carpet (2)
04.06.2024 |
|
|
-- |
-- |
Appraiser Confirms Construction Completion (0)
05.09.2024 |
|
|
-- |
-- |
Inspection (Final HVAC) (1)
05.13.2024 |
|
|
-- |
-- |
Inspection (Final Plumbing) (1)
05.13.2024 |
|
|
-- |
-- |
Inspection (Final Electric) (1)
05.13.2024 |
|
|
-- |
-- |
Inspection (Final Building) (2)
05.13.2024 |
Reinspect Mon, May 13 |
|
-- |
-- |
Pre Walk Through (0)
05.13.2024 |
|
|
-- |
-- |
Stain Hardwood Stairs (1)
05.01.2024 |
|
|
-- |
-- |
Cleaning (1)
05.13.2024 |
In process 5/11 |
|
-- |
-- |
Certificate of Occupancy (1)
05.15.2024 |
|
|
-- |
-- |
C.O. to Lender (0)
05.15.2024 |
|
|
-- |
-- |
Schedule Closing (0)
05.16.2024 |
|
|
-- |
-- |
Buyer Walk Through (1)
05.13.2024 |
Monday at 2pm |
|
-- |
-- |
Payment for Upgrades (0)
05.13.2024 |
|
|
-- |
-- |
Keys to Settlement Agent (0)
05.13.2024 |
|
|
-- |
-- |
Review Settlement Statement (0)
05.14.2024 |
|
|
-- |
-- |
Jerry Signs Closing Documents (0)
05.16.2024 |
|
|
-- |
-- |
Request Trash Tote From POA Manager (0)
05.13.2024 |
|
|
-- |
-- |
Closing (1)
05.23.2024 |
Brittany @ West View Title |
|
-- |
-- |
Remove Coded Lockbox (0)
06.01.2024 |
|
|