Paint touchup throughout
Small piece of missing trim on Main level staircase
Cover carpet
Add trim to hall bath And master bath
Powder bath needs light fixture Electrician
Patio door plugs needed Kristen
Towel bars, and hand towel rings are the incorrect color Joe
Hall bathroom electrical switch plate needed Electrician
Paint front door Painter
Paint front door
Finish touchup paint
CODED LOCKBOX 4545
Few stones needed in front Rock guys
Crooked board in basement bonus space. Doesn’t matter? Tom
Microwave isn’t working Tom
Floor register missing in kitchen Jill
Paint attic cover Painter
Dent in refrigerator door we have the fridge and are waiting on access
Screen door needs installed at deck door
Microwave isn’t working, it flips the breaker every time you push a button or open the door
A few screens still need installed on3rd floor
Deck door doesn’t close or open smoothly Jeremiah
Wall needs paint touch up around where the shower head comes out of the wall in the guest bathroom Painter
Caulk around the attic access panel hole
Paint the attic access panel
Blue pipe in bonus room needs moved so that they can eventually hang drywall Mazur
Extra filter needed Jill
Handrails all need put back up
Remove the extra screens from the bonus room Jill
Light bulb needed in the garage door opener
The cover needs put on the keypad on the back of the front door
Bathtub missing a silver drain? Jill
Smoke detector beeping Jill
Remove extra splash blocks from driveway Tom
Pressure wash front and rear of home Jill
Landscaping needed in front corner Pettit
Clean out garage
Drywall repair hall bath escutcheon
Remove glue from hall tub
Put attic access in place
Floor creak master Denny
Missing a front screen Jill
Water is dripping out of the front of the Spicket handle, not the actual Spicket in the front of the house Mazur
Install or remove extra splash block Tom
Finish cleaning out garage Jill
Difficult to turn front hose bib
Repair chip in fiberglass shower in hall bathroom Valley Tub Repair
Drywall repairs Living Room - drywaller and painter
Install screen in living room
Oven is not working Matts Appliances
The trim on the garage door seems to have come loose Davenport
Seror 540-746-0946
Notified Kozhin we will no longer replace refrigerator Oct 14, 2024
Jill is in touch with property manager
UPGRADES - COMPLETED
    First $3,000 of upgrades free (per contract)  
    Expanded Driveway  
    Microwave vented to exterior  
    Painted Stairs to bedroom level  
    Digital Deadbolt  
CRITICAL PATH - COMPLETED
-- -- Ratified Contract? (0)  02.15.2024    
-- -- $2500 Deposit Received (0)  02.17.2024    
-- -- Association Packet Requested (0)  02.15.2024    
-- -- Association Packet Received (0)  02.17.2024    
-- -- Selections Meeting (0)  03.05.2024    
-- -- Selections Sheet Signed (0)  03.06.2024     3/5: sent to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  04.23.2024     4/22: sent to Jerry to sign
-- -- Deposit For Upgrades Received (0)  03.06.2024    
-- -- Building Permit (30) *   11.06.2023    
-- -- Order Roof & Floor Trusses (1)  01.04.2024    
-- -- Order Windows & Doors (0)  01.25.2024    
-- -- Stake Out Home (1)  11.09.2023    
-- -- Excavate (2)  11.09.2023    
-- -- Inspection (Footers) (1)  11.09.2023    
-- -- Inspection (Concrete Wall) (1)  01.04.2024    
-- -- Pour Footers (1) *   11.09.2023    
-- -- Set Forms (2)  11.30.2023    
-- -- Pour Foundation Walls (1)  11.30.2023    
-- -- Plumb Slab (2)  12.01.2023    
-- -- Inspection (Plumbing Under Slab) (1)  12.18.2023    
-- -- Inspection (Conduit Under Slab) (1)  12.18.2023    
-- -- Prepare Slab (1)  12.18.2023    
-- -- Inspection (Slab) (1)  12.18.2023    
-- -- Inspection (Drain Tile) (0)  12.18.2023    
-- -- Pour Slab (1) *   12.18.2023    
-- -- Settlement Agent Confirmed (0)  04.23.2024    
-- -- Framing I (9)  01.04.2024    
-- -- Order Steps (0)  02.07.2024    
-- -- Order Tubs / Showers (0)  02.07.2024    
-- -- Framing II (8)  01.07.2024    
-- -- Framing III (8) *   01.29.2024    
-- -- Verify Window & Roof Structure (0)  02.19.2024    
-- -- Install Stairs (0) *   01.29.2024    
-- -- Windows & Doors (0) *   02.07.2024    
-- -- House Number and Status in Window (0)  02.19.2024    
-- -- Roofing (0) *   02.07.2024    
-- -- Order Cabinets (0)  03.26.2024    
-- -- Order Appliances (0)  04.25.2024    
-- -- Deck (0)  02.03.2024    
-- -- Gutters (0)  04.04.2024    
-- -- Driveway (0) *   04.19.2024    
-- -- Patio (0)  03.13.2024    
-- -- Privacy Divider / Fence (0) *   04.18.2024    
-- -- Sod / Seed / Landscaping (0)  05.11.2024    
-- -- HVAC Rough In (4)  02.07.2024     In process 2/3
-- -- Rough In Microwave Vent (0)  02.07.2024    
-- -- Plumbing Rough In (4)  02.17.2024     In process 2/10. Almost completed.
-- -- Electric Rough In (4)  02.17.2024    
-- -- Inspection (Rough In HVAC) (1)  02.21.2024    
-- -- Inspection (Rough In Plumbing) (1)  02.21.2024    
-- -- Inspection (Rough In Electric) (1)  02.21.2024    
-- -- Inspection (Framing) (1) *   02.21.2024    
-- -- Inspection (Deck Piers) (0)  04.22.2024    
-- -- Exterior Vinyl (0) *   04.03.2024    
-- -- Exterior Stone (0)  04.10.2024     In process 4/6
-- -- Insulation (2) *   02.21.2024    
-- -- Inspection (Insulation) (1)  02.24.2024    
-- -- Inspection (Electric Service) (0)  03.28.2024    
-- -- Set Electric Meter (0) *   05.01.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  04.06.2024    
-- -- Drywall (Hang) (4) *   03.06.2024     In process 2/24
-- -- Loan Approval (0)  04.04.2024     Cash
-- -- Deed Preparation (0)  04.23.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.13.2024     In process 3/9
-- -- Paint 1 (1)  03.13.2024    
-- -- Garage Door (0)  03.30.2024    
-- -- House Numbers (0)  04.27.2024    
-- -- Mailbox (0)  04.27.2024    
-- -- Cabinet Installation (2) *   04.12.2024     Delivery April 11, Install April 12
-- -- Granite Installation (1) *   04.18.2024    
-- -- Interior Trim - Install (3) *   03.20.2024     In process 3/16
-- -- Order Plumbing / Lighting Fixtures (0)  04.17.2024    
-- -- Interior Trim - Paint (1)  03.30.2024    
-- -- Luxury Vinyl Plank (3) *   04.06.2024    
-- -- Luxury Vinyl Tile (0)  04.06.2024    
-- -- Paint 2 (3)  04.03.2024    
-- -- Cover Floors (0)  05.01.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  04.10.2024    
-- -- Shoe Moulding (0)  04.24.2024     In process 4/19
-- -- Shelving, Door Knobs, Fire Extinguisher (1) *   05.09.2024     Shelving and mirrors needed 5/4 - Wed, May 8
-- -- Install Coded Lockbox (add extra keys) (0)  05.06.2024    
-- -- Pay Water / Sewer Taps (0)  04.22.2024    
-- -- Set Water Meter (1) *   04.23.2024    
-- -- Electric Trim Out (3) *   04.27.2024     In process 4/24
-- -- Ceiling Fans (0)  04.27.2024    
-- -- HVAC Trim Out (1) *   04.27.2024     Partially complete 4/24
-- -- Blower Door Test (1)  05.09.2024    
-- -- Plumbing Trim Out (2) *   04.27.2024     In process 4/17
-- -- Install Appliances (0) *   05.09.2024     Tuesday, May 7
-- -- Paint 3 (2) *   04.27.2024    
-- -- Carpet (2)  04.06.2024    
-- -- Appraiser Confirms Construction Completion (0)  05.09.2024    
-- -- Inspection (Final HVAC) (0)  05.13.2024    
-- -- Inspection (Final Plumbing) (0)  05.13.2024    
-- -- Inspection (Final Electric) (0)  05.13.2024    
-- -- Inspection (Final Building) (4) *   05.13.2024     Reinspect Mon, May 13
-- -- Pre Walk Through (0)  05.13.2024    
-- -- Stain Hardwood Stairs (1) *   05.01.2024    
-- -- Cleaning (1)  05.13.2024     In process 5/11
-- -- Certificate of Occupancy (1) *   05.15.2024    
-- -- C.O. to Lender (0)  05.15.2024    
-- -- Schedule Closing (0)  05.16.2024    
-- -- Buyer Walk Through (1) *   05.13.2024     Monday at 2pm
-- -- Payment for Upgrades (0)  05.13.2024    
-- -- Keys to Settlement Agent (0)  05.13.2024    
-- -- Review Settlement Statement (0)  05.14.2024    
-- -- Jerry Signs Closing Documents (0)  05.16.2024    
-- -- Request Trash Tote From POA Manager (0)  05.13.2024    
-- -- Closing (1)  05.23.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  06.01.2024