1 33 37 89 47 73 67 55 56 59 57 66 65 64 60 61 62 63 ADDR
CONGERS-2 - 45  ::  1428 Appaloosa Court
[ BUILD: 20231874 ]      
CRITICAL PATH   |   INSPECTIONS   |   FLOOR PLANS   |   SELECTIONS   |   SPECS   |   CHANGES   |   NHS
view photo archive
 
--   --   Paint touchup throughout
--   --   Small piece of missing trim on Main level staircase
--   --   Cover carpet
--   --   Add trim to hall bath And master bath
--   --   Powder bath needs light fixture Electrician
--   --   Patio door plugs needed Kristen
--   --   Towel bars, and hand towel rings are the incorrect color Joe
--   --   Hall bathroom electrical switch plate needed Electrician
--   --   Paint front door Painter
--   --   Paint front door
--   --   Finish touchup paint
--   --   CODED LOCKBOX 4545
--   --   Few stones needed in front Rock guys
--   --   Crooked board in basement bonus space. Doesn’t matter? Tom
--   --   Microwave isn’t working Tom
--   --   Floor register missing in kitchen Jill
--   --   Paint attic cover Painter
--   --   Dent in refrigerator door we have the fridge and are waiting on access
--   --   Screen door needs installed at deck door
--   --   Microwave isn’t working, it flips the breaker every time you push a button or open the door
--   --   A few screens still need installed on3rd floor
--   --   Deck door doesn’t close or open smoothly Jeremiah
--   --   Wall needs paint touch up around where the shower head comes out of the wall in the guest bathroom Painter
--   --   Caulk around the attic access panel hole
--   --   Paint the attic access panel
--   --   Blue pipe in bonus room needs moved so that they can eventually hang drywall Mazur
--   --   Extra filter needed Jill
--   --   Handrails all need put back up
--   --   Remove the extra screens from the bonus room Jill
--   --   Light bulb needed in the garage door opener
--   --   The cover needs put on the keypad on the back of the front door
--   --   Bathtub missing a silver drain? Jill
--   --   Smoke detector beeping Jill
--   --   Remove extra splash blocks from driveway Tom
--   --   Pressure wash front and rear of home Jill
--   --   Landscaping needed in front corner Pettit
--   --   Clean out garage
--   --   Drywall repair hall bath escutcheon
--   --   Remove glue from hall tub
--   --   Put attic access in place
--   --   Floor creak master Denny
--   --   Missing a front screen Jill
--   --   Water is dripping out of the front of the Spicket handle, not the actual Spicket in the front of the house Mazur
--   --   Install or remove extra splash block Tom
--   --   Finish cleaning out garage Jill
--   --   Difficult to turn front hose bib
--   --   Repair chip in fiberglass shower in hall bathroom Valley Tub Repair
--   --   Drywall repairs Living Room - drywaller and painter
--   --   Install screen in living room
--   --   Oven is not working Matts Appliances
--   --   The trim on the garage door seems to have come loose Davenport
--   --   Seror 540-746-0946
--   --   Notified Kozhin we will no longer replace refrigerator Oct 14, 2024
--   --   Jill is in touch with property manager
-- -- Ratified Contract? (0)  02.15.2024    
-- -- $2500 Deposit Received (0)  02.17.2024    
-- -- Association Packet Requested (0)  02.15.2024    
-- -- Association Packet Received (0)  02.17.2024    
-- -- Selections Meeting (0)  03.05.2024    
-- -- Selections Sheet Signed (0)  03.06.2024     3/5: sent to Kozhin
-- -- Amendment for Upgrades (B,S,L,T,BCP) (0)  04.23.2024     4/22: sent to Jerry to sign
-- -- Deposit For Upgrades Received (0)  03.06.2024    
-- -- Building Permit (30)  11.06.2023    
-- -- Order Roof & Floor Trusses (1)  01.04.2024    
-- -- Order Windows & Doors (0)  01.25.2024    
-- -- Stake Out Home (1)  11.09.2023    
-- -- Excavate (2)  11.09.2023    
-- -- Inspection (Footers) (1)  11.09.2023    
-- -- Inspection (Concrete Wall) (1)  01.04.2024    
-- -- Pour Footers (1)  11.09.2023    
-- -- Set Forms (2)  11.30.2023    
-- -- Pour Foundation Walls (1)  11.30.2023    
-- -- Plumb Slab (2)  12.01.2023    
-- -- Inspection (Plumbing Under Slab) (1)  12.18.2023    
-- -- Inspection (Conduit Under Slab) (1)  12.18.2023    
-- -- Prepare Slab (1)  12.18.2023    
-- -- Inspection (Slab) (1)  12.18.2023    
-- -- Inspection (Drain Tile) (0)  12.18.2023    
-- -- Pour Slab (1) *   12.18.2023    
-- -- Settlement Agent Confirmed (0)  04.23.2024    
-- -- Framing I (9)  01.04.2024    
-- -- Order Steps (0)  02.07.2024    
-- -- Order Tubs / Showers (0)  02.07.2024    
-- -- Framing II (8)  01.07.2024    
-- -- Framing III (8) *   01.29.2024    
-- -- Verify Window & Roof Structure (0)  02.19.2024    
-- -- Install Stairs (0)  01.29.2024    
-- -- Windows & Doors (0)  02.07.2024    
-- -- House Number and Status in Window (0)  02.19.2024    
-- -- Roofing (0)  02.07.2024    
-- -- Order Cabinets (0)  03.26.2024    
-- -- Order Appliances (0)  04.25.2024    
-- -- Deck (0)  02.03.2024    
-- -- Gutters (0)  04.04.2024    
-- -- Driveway (0)  04.19.2024    
-- -- Patio (0)  03.13.2024    
-- -- Privacy Divider / Fence (0)  04.18.2024    
-- -- Sod / Seed / Landscaping (0)  05.11.2024    
-- -- HVAC Rough In (4)  02.07.2024     In process 2/3
-- -- Inspection (Rough In HVAC) (1)  02.21.2024    
-- -- Rough In Microwave Vent (0)  02.07.2024    
-- -- Plumbing Rough In (4)  02.17.2024     In process 2/10. Almost completed.
-- -- Inspection (Rough In Plumbing) (1)  02.21.2024    
-- -- Electric Rough In (4)  02.17.2024    
-- -- Inspection (Rough In Electric) (1)  02.21.2024    
-- -- Inspection (Deck Piers) (0)  04.22.2024    
-- -- Inspection (Framing) (1)  02.21.2024    
-- -- Exterior Vinyl (0) *   04.03.2024    
-- -- Exterior Stone (0)  04.10.2024     In process 4/6
-- -- Insulation (2)  02.21.2024    
-- -- Inspection (Insulation) (1)  02.24.2024    
-- -- Inspection (Electric Service) (0)  03.28.2024    
-- -- Set Electric Meter (0)  05.01.2024    
-- -- Inspection (Main Sewer Line) (0)  04.04.2024    
-- -- Inspection (Main Water Line) (0)  04.04.2024    
-- -- Order Interior Doors & Trim (0)  04.06.2024    
-- -- Drywall (Hang) (4) *   03.06.2024     In process 2/24
-- -- Loan Approval (0)  04.04.2024     Cash
-- -- Deed Preparation (0)  04.23.2024    
-- -- Drywall (Tape, Block, Skim, Sand) (6) *   03.13.2024     In process 3/9
-- -- Paint 1 (1)  03.13.2024    
-- -- Garage Door (0)  03.30.2024    
-- -- House Numbers (0)  04.27.2024    
-- -- Mailbox (0)  04.27.2024    
-- -- Cabinet Installation (2) *   04.12.2024     Delivery April 11, Install April 12
-- -- Granite Installation (1) *   04.18.2024    
-- -- Interior Trim - Install (3)  03.20.2024     In process 3/16
-- -- Order Plumbing / Lighting Fixtures (0)  04.17.2024    
-- -- Interior Trim - Paint (1)  03.30.2024    
-- -- Luxury Vinyl Plank (3) *   04.06.2024    
-- -- Luxury Vinyl Tile (0)  04.06.2024    
-- -- Paint 2 (3)  04.03.2024    
-- -- Cover Floors (1)  05.01.2024    
-- -- Deliver Plumbing / Lighting Fixtures (0)  04.10.2024    
-- -- Shoe Moulding (0)  04.24.2024     In process 4/19
-- -- Shelving, Door Knobs, Fire Extinguisher (0)  05.09.2024     Shelving and mirrors needed 5/4 - Wed, May 8
-- -- Install Coded Lockbox (add extra keys) (0)  05.06.2024    
-- -- Pay Water / Sewer Taps (0)  04.22.2024    
-- -- Set Water Meter (0)  04.23.2024    
-- -- Electric Trim Out (3)  04.27.2024     In process 4/24
-- -- Ceiling Fans (0)  04.27.2024    
-- -- HVAC Trim Out (1)  04.27.2024     Partially complete 4/24
-- -- Blower Door Test (1)  05.09.2024    
-- -- Plumbing Trim Out (2)  04.27.2024     In process 4/17
-- -- Install Appliances (0) *   05.09.2024     Tuesday, May 7
-- -- Paint 3 (2) *   04.27.2024    
-- -- Carpet (2)  04.06.2024    
-- -- Appraiser Confirms Construction Completion (0)  05.09.2024    
-- -- Inspection (Final HVAC) (1)  05.13.2024    
-- -- Inspection (Final Plumbing) (1)  05.13.2024    
-- -- Inspection (Final Electric) (1)  05.13.2024    
-- -- Inspection (Final Building) (2) *   05.13.2024     Reinspect Mon, May 13
-- -- Pre Walk Through (0)  05.13.2024    
-- -- Stain Hardwood Stairs (1)  05.01.2024    
-- -- Cleaning (1)  05.13.2024     In process 5/11
-- -- Certificate of Occupancy (1) *   05.15.2024    
-- -- C.O. to Lender (0)  05.15.2024    
-- -- Schedule Closing (0)  05.16.2024    
-- -- Buyer Walk Through (1)  05.13.2024     Monday at 2pm
-- -- Payment for Upgrades (0)  05.13.2024    
-- -- Keys to Settlement Agent (0)  05.13.2024    
-- -- Review Settlement Statement (0)  05.14.2024    
-- -- Jerry Signs Closing Documents (0)  05.16.2024    
-- -- Request Trash Tote From POA Manager (0)  05.13.2024    
-- -- Closing (1)  05.23.2024     Brittany @ West View Title
-- -- Remove Coded Lockbox (0)  06.01.2024