| -- | -- | Swap out Pine stairs for hardwood treads located on basement level | ||
| -- | -- | I would treads are pretty stand up. | ||
| -- | -- | Hardwood treads are pretty stained up | ||
| -- | -- | Remove set of stairs and foyer | ||
| -- | -- | Missing bottom window pane | On order | |
| -- | -- | Kitchen window is broken | On order | |
| -- | -- | Glue on master bath | ||
| -- | -- | Master bed drywall framing issue | ||
| -- | -- | |||
| -- | -- | Large hole in kitchen area needs to be patched | Drywaller | |
| -- | -- | Bonus room window is broken | On order | |
| -- | -- | All hardware needed on cabinetry | ||
| -- | -- | Set of appliances here | They go in 73- moving out today | |
| -- | -- | Fix front siding that is falling down | Davenport | |
| -- | -- | Cover oak steps | ||
| -- | -- | Install thermostat | ||
| -- | -- | Paint utility room door | Painter | |
| -- | -- | Powder bath light needed | Electrician | |
| -- | -- | Pendant light (kitchen island) needed | Electrician | |
| -- | -- | Install shower rod | Paul | |
| -- | -- | Powder bath, plumbing, trim out needed | Plumber | |
| -- | -- | Handle needed to master bedroom | Paul | |
| -- | -- | Basement bonus bathroom needs plumbing trim out | Plumber | |
| -- | -- | Staining on steps | Painter | |
| -- | -- | Glue on master shower | Drywallers | |
| -- | -- | Finish final touch up paint | Painter | |
| -- | -- | Munzur finishing today | ||
| -- | -- | CODED LOCKBOX 7171 | ||
| -- | -- | Install mirror in powder bathroom | Paul | |
| -- | -- | Put piping closer to side of the house | Tom | |
| -- | -- | Put piping closer to side of the house | ||
| -- | -- | Clean out garage | Jill | |
| -- | -- | Glue and bonus room bath shower | Jill | |
| -- | -- | Remove items from driveway and appliances from garage | ||
| -- | -- | Install screens | Jill | |
| -- | -- | Bonus bathroom fan needs to be pushed to ceiling | Jill or Jason | |
| -- | -- | Patch, screw holes in powder bath light fixture | Painter | |
| -- | -- | Garage door handle is missing locking system | Paul | |
| -- | -- | Install mirror in powder bath | Paul | |
| -- | -- | Few more screws needed in cable cover in garage | Jill or Tom | |
| -- | -- | Patch a bit of sod out front | Pettitt | |
| -- | -- | |||
| -- | -- | Few scratches on steps | ||
| -- | -- | Fasten downspout connection to house on rear of townhouse | Tom | |
| -- | -- | Add more screws to hurricane clip under deck | Tom | |
| -- | -- | Secure diagonal braces under deck | ||
| -- | -- | Install a few more deck screws where missing at the deck boards | ||
| -- | -- | Refrigerant line at heat pump needs to be above ground | ||
| -- | -- | What is under the heat pump? Anything? | A pad. Covered with dirt. Tom will fix it | |
| -- | -- | Replace air filter | ||
| -- | -- | Smoke detector for bonus room? | We sold this room as a bonus room, not a bedroom. So we don’t need one there by code. | |
| -- | -- | Should white wires be marked with black sharpie in panel? | ||
| -- | -- | Correct labeling (24, 26) on breaker panel | ||
| -- | -- | Adjust hinges between garage and hallway to make door close | ||
| -- | -- | Remove smoke detector covers | ||
| -- | -- | Pantry pocket door is not sliding correctly | ||
| -- | -- | Missing screw at electrical box under sink | ||
| -- | -- | Chandelier - make sure it is brushed nickel | and shorter | |
| -- | -- | Three windows did not latch | ||
| -- | -- | Touch up paint | ||
| -- | -- | Adjust pendant lights to be even | ||
| -- | -- | Ratified Contract? (0) 01.28.2024 | ||
| Finished bonus room | ||||
| Finished bonus bath | ||||
| Three Drawer Stack in place of B36” | ||||
| Luxury vinyl plank entire bedroom level | ||||
| Oak Steps to Bedroom Level | ||||
| Gardenia LVT all bathroom floors | ||||
| Amendment to increase price by $21,935 | ||||
| -- | -- | $2500 Deposit Received (0) 02.06.2024 | ||
| -- | -- | Association Packet Requested (0) 01.28.2024 | ||
| -- | -- | Association Packet Received (0) 02.02.2024 | ||
| -- | -- | Selections Meeting (0) 02.06.2024 | ||
| -- | -- | Selections Sheet Signed (0) 02.24.2024 | 2/6: Sent to Kozhin for signatures | |
| -- | -- | Amendment for Upgrades (B,S,L,T,BCP) (0) 03.19.2024 | 3/19: sent to Jerry | |
| -- | -- | Deposit For Upgrades Received (0) 03.19.2024 | ||
| -- | -- | Building Permit (30) * 11.06.2023 | ||
| -- | -- | Order Roof & Floor Trusses (1) 01.25.2024 | ||
| -- | -- | Order Windows & Doors (0) 02.12.2024 | ||
| -- | -- | Stake Out Home (1) 12.26.2023 | ||
| -- | -- | Excavate (2) 12.26.2023 | ||
| -- | -- | Inspection (Footers) (1) 12.26.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.26.2023 | ||
| -- | -- | Pour Footers (1) * 12.26.2023 | ||
| -- | -- | Set Forms (2) 12.26.2023 | ||
| -- | -- | Pour Foundation Walls (1) 12.26.2023 | ||
| -- | -- | Plumb Slab (2) 12.26.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 01.04.2024 | ||
| -- | -- | Prepare Slab (1) 01.04.2024 | ||
| -- | -- | Inspection (Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 01.04.2024 | ||
| -- | -- | Pour Slab (1) * 01.04.2024 | ||
| -- | -- | Settlement Agent Confirmed (0) 03.19.2024 | ||
| -- | -- | Framing I (9) 01.29.2024 | ||
| -- | -- | Order Steps (0) 02.14.2024 | ||
| -- | -- | Order Tubs / Showers (0) 02.14.2024 | ||
| -- | -- | Framing II (8) 01.29.2024 | ||
| -- | -- | Framing III (8) * 02.14.2024 | ||
| -- | -- | Verify Window & Roof Structure (0) 02.14.2024 | ||
| -- | -- | Install Stairs (0) * 02.15.2024 | ||
| -- | -- | Windows & Doors (0) * 02.19.2024 | ||
| -- | -- | House Number and Status in Window (0) 03.04.2024 | ||
| -- | -- | Roofing (0) * 03.04.2024 | ||
| -- | -- | Order Cabinets (0) 03.23.2024 | ||
| -- | -- | Order Appliances (0) 04.27.2024 | STANDARD | |
| -- | -- | Deck (0) 02.14.2024 | ||
| -- | -- | Gutters (0) 04.25.2024 | ||
| -- | -- | Driveway (0) * 05.08.2024 | ||
| -- | -- | Patio (0) 04.27.2024 | ||
| -- | -- | Privacy Divider / Fence (0) * 04.27.2024 | ||
| -- | -- | Sod / Seed / Landscaping (0) 05.22.2024 | ||
| -- | -- | HVAC Rough In (4) 02.24.2024 | ||
| -- | -- | Rough In Microwave Vent (0) 03.02.2024 | ||
| -- | -- | Plumbing Rough In (4) 03.20.2024 | In process 3/16 | |
| -- | -- | Electric Rough In (4) 03.20.2024 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.30.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 03.30.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.30.2024 | ||
| -- | -- | Inspection (Framing) (1) * 03.30.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.20.2024 | ||
| -- | -- | Exterior Vinyl (0) * 04.17.2024 | ||
| -- | -- | Exterior Stone (0) 05.06.2024 | In process 4/27 | |
| -- | -- | Insulation (2) * 03.30.2024 | ||
| -- | -- | Inspection (Insulation) (1) 03.30.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 04.11.2024 | ||
| -- | -- | Set Electric Meter (0) * 05.02.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.04.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.04.2024 | ||
| -- | -- | Order Interior Doors & Trim (0) 05.06.2024 | ||
| -- | -- | Drywall (Hang) (4) * 04.03.2024 | In process 3/30 | |
| -- | -- | Loan Approval (0) 11.07.2024 | USDA | |
| -- | -- | Deed Preparation (0) 06.10.2024 | ||
| -- | -- | Drywall (Tape, Block, Skim, Sand) (6) * 04.17.2024 | In process 4/12 | |
| -- | -- | Paint 1 (1) 04.17.2024 | ||
| -- | -- | Garage Door (0) 05.08.2024 | ||
| -- | -- | House Numbers (0) 05.15.2024 | ||
| -- | -- | Mailbox (0) 05.20.2024 | ||
| -- | -- | Cabinet Installation (2) * 04.19.2024 | Install April 19 | |
| -- | -- | Granite Installation (1) * 04.27.2024 | ||
| -- | -- | Interior Trim - Install (3) * 05.11.2024 | In process 5/8 | |
| -- | -- | Order Plumbing / Lighting Fixtures (0) 05.13.2024 | ||
| -- | -- | Interior Trim - Paint (1) 05.15.2024 | ||
| -- | -- | Luxury Vinyl Plank (3) * 05.22.2024 | ||
| -- | -- | Luxury Vinyl Tile (0) 05.22.2024 | ||
| -- | -- | Paint 2 (3) 05.22.2024 | In process 5/15 | |
| -- | -- | Cover Floors (1) 06.05.2024 | ||
| -- | -- | Deliver Plumbing / Lighting Fixtures (0) 05.13.2024 | ||
| -- | -- | Shoe Moulding (0) 05.26.2024 | In process 5/22 | |
| -- | -- | Shelving, Door Knobs, Fire Extinguisher (0) * 06.09.2024 | In process 6/5 | |
| -- | -- | Install Coded Lockbox (add extra keys) (0) 06.12.2024 | ||
| -- | -- | Pay Water / Sewer Taps (0) 05.16.2024 | ||
| -- | -- | Set Water Meter (0) * 05.23.2024 | ||
| -- | -- | Electric Trim Out (3) * 06.09.2024 | In process 6/5 | |
| -- | -- | Ceiling Fans (0) 06.05.2024 | Master | |
| -- | -- | HVAC Trim Out (1) * 06.05.2024 | ||
| -- | -- | Blower Door Test (1) 06.25.2024 | ||
| -- | -- | Plumbing Trim Out (2) * 06.15.2024 | Standard BN. In process 6/12 | |
| -- | -- | Install Appliances (0) * 06.12.2024 | Delivered 6/10 | |
| -- | -- | Paint 3 (2) * 05.26.2024 | ||
| -- | -- | Carpet (2) 05.26.2024 | ||
| -- | -- | Appraiser Confirms Construction Completion (0) 11.07.2024 | ||
| -- | -- | Inspection (Final HVAC) (1) 06.24.2024 | ||
| -- | -- | Inspection (Final Plumbing) (1) 06.24.2024 | ||
| -- | -- | Inspection (Final Electric) (1) 06.24.2024 | ||
| -- | -- | Inspection (Final Building) (2) * 06.25.2024 | Fri, Jun 21 | |
| -- | -- | Pre Walk Through (0) 06.26.2024 | ||
| -- | -- | Stain Hardwood Stairs (1) * 06.15.2024 | In process 6/9. Needs an additional coat of stain. | |
| -- | -- | Cleaning (1) 06.22.2024 | ||
| -- | -- | Certificate of Occupancy (1) * 06.26.2024 | ||
| -- | -- | C.O. to Lender (0) 06.26.2024 | ||
| -- | -- | Schedule Closing (0) 11.13.2024 | Nov 13, 14, 15 | |
| -- | -- | Buyer Walk Through (1) * 07.15.2024 | Monday at 2pm | |
| -- | -- | Payment for Upgrades (0) 06.26.2024 | ||
| -- | -- | Keys to Settlement Agent (0) 06.10.2024 | ||
| -- | -- | Review Settlement Statement (0) 11.13.2024 | ||
| -- | -- | Jerry Signs Closing Documents (0) 11.13.2024 | ||
| -- | -- | Request Trash Tote From POA Manager (0) 06.13.2024 | ||
| -- | -- | Closing (1) 11.18.2024 | Brittany @ West View Title | |
| -- | -- | Remove Coded Lockbox (0) 07.15.2024 | ||