| TO DO | ||||
| --- | ||||
| UPGRADES | ||||
| --- | ||||
| CRITICAL PATH | ||||
| --- | ||||
| TO DO - COMPLETED OR DELETED | ||||
| UPGRADES - COMPLETED | ||||
| Finished bonus room | ||||
| Finished bonus bath | ||||
| Three Drawer Stack in place of B36” | ||||
| Luxury vinyl plank entire bedroom level | ||||
| Oak Steps to Bedroom Level | ||||
| Gardenia LVT all bathroom floors | ||||
| Amendment to increase price by $21,935 | ||||
| CRITICAL PATH - COMPLETED | ||||
| -- | -- | Inspection (Footers) (1) 12.26.2023 | ||
| -- | -- | Inspection (Concrete Wall) (1) 12.26.2023 | ||
| -- | -- | Inspection (Plumbing Under Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Conduit Under Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Slab) (1) 01.04.2024 | ||
| -- | -- | Inspection (Drain Tile) (0) 01.04.2024 | ||
| -- | -- | Inspection (Rough In HVAC) (1) 03.30.2024 | ||
| -- | -- | Inspection (Rough In Plumbing) (1) 03.30.2024 | ||
| -- | -- | Inspection (Rough In Electric) (1) 03.30.2024 | ||
| -- | -- | Inspection (Framing) (1) * 03.30.2024 | ||
| -- | -- | Inspection (Deck Piers) (0) 05.20.2024 | ||
| -- | -- | Inspection (Insulation) (1) 03.30.2024 | ||
| -- | -- | Inspection (Electric Service) (0) 04.11.2024 | ||
| -- | -- | Inspection (Main Sewer Line) (0) 04.04.2024 | ||
| -- | -- | Inspection (Main Water Line) (0) 04.04.2024 | ||
| -- | -- | Inspection (Final HVAC) (0) 06.24.2024 | ||
| -- | -- | Inspection (Final Plumbing) (0) 06.24.2024 | ||
| -- | -- | Inspection (Final Electric) (0) 06.24.2024 | ||
| -- | -- | Inspection (Final Building) (4) * 06.25.2024 | Fri, Jun 21 | |